Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.

LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.

PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.

VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).

KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).

On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.

Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.

PR NoPR DateItem GroupItem CodeItemLast POLast PricePO NoPO Date ▼ETAETA (PO Report)QtyPricePR→POGRPO NoGRPO DatePO→GRPODeadlineRealisasiL/ICurrencyVendorVendor CodeStatus PRStatus PORequired DateRequest ByUoMTotal POOutstandingTOPRemarks
2603003692026-03-25BAHAN BAKAR4020.0002BATU BARA ADB 6300 - 65002606002621,7502604003812026-04-212026-05-02540,0001,645272605000132026-05-02112026-05-09On time
2603004082026-03-24PERSEDIAAN UMUM6030.2838BAUT + RING + MUR M 4X102604003831502604003832026-04-212026-04-21420150282604008342026-04-2212026-04-28On time
2603100492026-03-27PERSEDIAAN UMUM6030.0898BESI UNP 100X50X5MM (@ 6000MM) SNI260610067576,0002604101222026-04-212026-04-2115576,000252604104872026-04-2542026-04-28On time
2603100492026-03-27PERSEDIAAN UMUM6030.0152BESI SIKU 60X60X6000 MM260410122354,4002604101222026-04-212026-04-2110354,400252604104872026-04-2542026-04-28On time
2603100492026-03-27PERSEDIAAN UMUM6030.284BESI UNP 120X55X6MM (@ 6000MM)260410122745,6002604101222026-04-212026-04-2120745,600252604104872026-04-2542026-04-28On time
2604000552026-04-06PERSEDIAAN UMUM6050.1694VACUUM CLEANER PORTABLE260400395800,0002604003952026-04-212026-04-281800,000152604009882026-04-2762026-05-05On time
2604000792026-04-08SPAREPART5031.1033RUBBER KOPLING 6 JARI OD90 ID45 T=20MM260400391195,0002604003912026-04-212026-05-1010195,000132605008922026-05-28372026-05-17Late
2604000792026-04-08SPAREPART5031.1033RUBBER KOPLING 6 JARI OD90 ID45 T=20MM260400391195,0002604003912026-04-212026-05-1010195,000132606000202026-06-02422026-05-17Late
2604000842026-04-08SPAREPART5021.0392V. BELT C - 42802604003967.92604003962026-04-212026-06-2047.9132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0393V. BELT C - 7100260400396132604003962026-04-212026-06-204013132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0389V. BELT C - 780026040039614.52604003962026-04-212026-06-20414.5132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0391V. BELT C - 42002604003967.62604003962026-04-212026-06-2087.6132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0397V. BELT C - 700026040039612.72604003962026-04-212026-06-20812.7132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.04V. BELT C - 34002604003966.22604003962026-04-212026-06-2046.2132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0394V. BELT C - 565026040039610.22604003962026-04-212026-06-20810.2132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0164V. BELT C - 40002604003967.32604003962026-04-212026-06-2047.3132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0399V. BELT C - 41002604003967.52604003962026-04-212026-06-2047.5132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0395V. BELT C - 380026040039672604003962026-04-212026-06-2047132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0398V. BELT C - 560026040039610.22604003962026-04-212026-06-20410.2132606005402026-06-13532026-06-27On time
2604000842026-04-08SPAREPART5021.0387TIMING BELT LIPUDA 20-HTD8M-7376-3300 12 APL260400396462604003962026-04-212026-06-20846132606005402026-06-13532026-06-27On time