Consolidated data
LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)
How the files are consolidated— click to expand
Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.
LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.
PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.
VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR Noⓘ | PR Dateⓘ | Item Groupⓘ | Item Codeⓘ | Itemⓘ | Last POⓘ | Last Priceⓘ | PO Noⓘ | PO Date ▼ⓘ | ETAⓘ | ETA (PO Report)ⓘ | Qtyⓘ | Priceⓘ | PR→POⓘ | GRPO Noⓘ | GRPO Dateⓘ | PO→GRPOⓘ | Deadlineⓘ | Realisasiⓘ | L/Iⓘ | Currencyⓘ | Vendorⓘ | Vendor Codeⓘ | Status PRⓘ | Status POⓘ | Required Dateⓘ | Request Byⓘ | UoMⓘ | Total POⓘ | Outstandingⓘ | TOPⓘ | Remarksⓘ |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260300337 | 2026-03-26 | SPAREPART | 5023.1565 | SNAPRING H 43 | 260300546 | 2,350 | 260300546 | 2026-03-31 | 2026-04-12 | 2026-04-12 | 20 | 2,350 | 5 | 260400091 | 2026-04-04 | 4 | 2026-04-19 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-31 | Gita | PCS | 47,000 | 0 | Net 30 | PRESS 1A, 1B & 1C |
| 260300355 | 2026-03-26 | PERSEDIAAN UMUM | 6060.0206 | MUR M 6 | 260500464 | 95 | 260300538 | 2026-03-31 | 2026-04-08 | 2026-04-08 | 1,000 | 95 | 5 | 260400093 | 2026-04-04 | 4 | 2026-04-15 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-04-30 | Gita | PCS | 95,000 | 0 | Net 30 | SAMBUNG CONVEYOR AREA BMSD |
| 260300355 | 2026-03-26 | PERSEDIAAN UMUM | 6060.024 | RING PLAT M-18 | 260500464 | 805 | 260300538 | 2026-03-31 | 2026-04-08 | 2026-04-08 | 1,000 | 805 | 5 | 260400093 | 2026-04-04 | 4 | 2026-04-15 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-04-30 | Gita | PCS | 805,000 | 0 | Net 30 | PERGANTIAN SPAREPART PEMBUANGAN LIMBAH BATUBARA |
| 260300355 | 2026-03-26 | PERSEDIAAN UMUM | 6060.016 | BAUT BAJA L M 16X70 | 260300538 | 8,500 | 260300538 | 2026-03-31 | 2026-04-08 | 2026-04-08 | 200 | 8,500 | 5 | 260400093 | 2026-04-04 | 4 | 2026-04-15 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-04-30 | Gita | PCS | 1,700,000 | 0 | Net 30 | PERGANTIAN SPAREPART MESIN CRUSHER |
| 260300355 | 2026-03-26 | PERSEDIAAN UMUM | 6060.0008 | BAUT M-6*30 | 260500465 | 255 | 260300538 | 2026-03-31 | 2026-04-08 | 2026-04-08 | 1,000 | 230 | 5 | 260400093 | 2026-04-04 | 4 | 2026-04-15 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-04-30 | Gita | PCS | 230,000 | 0 | Net 30 | SAMBUNG CONVEYOR AREA BMSD |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300541 | 2026-03-31 | 2026-04-20 | 2026-04-20 | 600 | 53,000 | 6 | 260400786 | 2026-04-22 | 22 | 2026-04-27 | On time | Lokal | IDR | JAYA BERKAH | S0726 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 31,800,000 | 74 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300541 | 2026-03-31 | 2026-04-20 | 2026-04-20 | 600 | 53,000 | 6 | 260400399 | 2026-04-11 | 11 | 2026-04-27 | On time | Lokal | IDR | JAYA BERKAH | S0726 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 31,800,000 | 74 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300541 | 2026-03-31 | 2026-04-20 | 2026-04-20 | 600 | 53,000 | 6 | 260400677 | 2026-04-20 | 20 | 2026-04-27 | On time | Lokal | IDR | JAYA BERKAH | S0726 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 31,800,000 | 74 | Net 30 | – |
| 260300381 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0017 | KAOLIN POWDER MESH 325 | 260600190 | 1,897 | 260300529 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 50,000 | 1,640 | 4 | 260400412 | 2026-04-13 | 13 | 2026-05-07 | On time | Lokal | IDR | GRAHA JAYA SENTOSA CV. | S0001 | CLOSED | OPEN | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 82,000,000 | 40 | Net 60 | – |
| 260300381 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0017 | KAOLIN POWDER MESH 325 | 260600190 | 1,897 | 260300528 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 50,000 | 1,625 | 4 | – | – | – | 2026-05-07 | Overdue | Lokal | IDR | STEPA WIRAUSAHA ADIGUNA, PT. | S0016 | CLOSED | OPEN | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 81,250,000 | 50,000 | Net 45 | – |
| 260300381 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0017 | KAOLIN POWDER MESH 325 | 260600190 | 1,897 | 260300529 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 50,000 | 1,640 | 4 | 260400373 | 2026-04-11 | 11 | 2026-05-07 | On time | Lokal | IDR | GRAHA JAYA SENTOSA CV. | S0001 | CLOSED | OPEN | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 82,000,000 | 40 | Net 60 | – |
| 260300382 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0018 | BALLCLAY (NOODLE) OPAL KA | 260600037 | 1,311 | 260300519 | 2026-03-31 | 2026-04-27 | 2026-04-27 | 24,000 | 1,200 | 4 | 260500035 | 2026-05-04 | 34 | 2026-05-04 | On time | Lokal | IDR | SIBELCO LAUTAN MINERALS PT. | S0003 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 28,800,000 | 0 | Net 60 | Toleransi KA: 0% |
| 260300384 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0024 | ALUMINA A-10 | 260600048 | 12,036.36 | 260300525 | 2026-03-31 | 2026-04-10 | 2026-04-10 | 24,000 | 11,645.13 | 4 | 260400305 | 2026-04-10 | 10 | 2026-04-17 | On time | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 279,483,120 | 0 | Net 90 | Acuan kurs bulanan: 16,877 |
| 260300385 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300518 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 270,000 | 7,453.75 | 4 | 260400481 | 2026-04-15 | 15 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,012,512,500 | 0 | Net 120 | Delivery schedule: 15/4 (40T) 18/4 (40T) 21/4 (40T) 23/4 (40T) 23/4 (40T) 27/4 (40T) 29/4 (40T) 30/4 (40T) |
| 260300385 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300518 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 270,000 | 7,453.75 | 4 | 260500033 | 2026-05-04 | 34 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,012,512,500 | 0 | Net 120 | Delivery schedule: 15/4 (40T) 18/4 (40T) 21/4 (40T) 23/4 (40T) 23/4 (40T) 27/4 (40T) 29/4 (40T) 30/4 (40T) |
| 260300385 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300518 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 270,000 | 7,453.75 | 4 | 260500079 | 2026-05-05 | 35 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,012,512,500 | 0 | Net 120 | Delivery schedule: 15/4 (40T) 18/4 (40T) 21/4 (40T) 23/4 (40T) 23/4 (40T) 27/4 (40T) 29/4 (40T) 30/4 (40T) |
| 260300385 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300518 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 270,000 | 7,453.75 | 4 | 260400632 | 2026-04-17 | 17 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,012,512,500 | 0 | Net 120 | Delivery schedule: 15/4 (40T) 18/4 (40T) 21/4 (40T) 23/4 (40T) 23/4 (40T) 27/4 (40T) 29/4 (40T) 30/4 (40T) |
| 260300385 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300518 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 270,000 | 7,453.75 | 4 | 260401136 | 2026-04-30 | 30 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,012,512,500 | 0 | Net 120 | Delivery schedule: 15/4 (40T) 18/4 (40T) 21/4 (40T) 23/4 (40T) 23/4 (40T) 27/4 (40T) 29/4 (40T) 30/4 (40T) |
| 260300385 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300518 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 270,000 | 7,453.75 | 4 | 260400999 | 2026-04-28 | 28 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,012,512,500 | 0 | Net 120 | Delivery schedule: 15/4 (40T) 18/4 (40T) 21/4 (40T) 23/4 (40T) 23/4 (40T) 27/4 (40T) 29/4 (40T) 30/4 (40T) |
| 260300385 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300518 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 270,000 | 7,453.75 | 4 | 260400769 | 2026-04-22 | 22 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,012,512,500 | 0 | Net 120 | Delivery schedule: 15/4 (40T) 18/4 (40T) 21/4 (40T) 23/4 (40T) 23/4 (40T) 27/4 (40T) 29/4 (40T) 30/4 (40T) |
| 260300387 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260300520 | 2026-03-31 | 2026-04-28 | 2026-04-28 | 72,000 | 1,225 | 4 | 260400766 | 2026-04-22 | 22 | 2026-05-05 | On time | Lokal | IDR | SIBELCO LAUTAN MINERALS PT. | S0003 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 88,200,000 | 0 | Net 60 | Delivery schedule: - 14/04 (24T) - 21/04 (24T) - 28/04 (24T) |
| 260300387 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260300520 | 2026-03-31 | 2026-04-28 | 2026-04-28 | 72,000 | 1,225 | 4 | 260400483 | 2026-04-15 | 15 | 2026-05-05 | On time | Lokal | IDR | SIBELCO LAUTAN MINERALS PT. | S0003 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 88,200,000 | 0 | Net 60 | Delivery schedule: - 14/04 (24T) - 21/04 (24T) - 28/04 (24T) |
| 260300387 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260300520 | 2026-03-31 | 2026-04-28 | 2026-04-28 | 72,000 | 1,225 | 4 | 260401057 | 2026-04-29 | 29 | 2026-05-05 | On time | Lokal | IDR | SIBELCO LAUTAN MINERALS PT. | S0003 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 88,200,000 | 0 | Net 60 | Delivery schedule: - 14/04 (24T) - 21/04 (24T) - 28/04 (24T) |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400728 | 2026-04-21 | 21 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400533 | 2026-04-16 | 16 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400998 | 2026-04-28 | 28 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400241 | 2026-04-09 | 9 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400843 | 2026-04-23 | 23 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400443 | 2026-04-14 | 14 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400727 | 2026-04-21 | 21 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300389 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260300526 | 2026-03-31 | 2026-04-29 | 2026-04-29 | 240,000 | 10,126.2 | 4 | 260400304 | 2026-04-10 | 10 | 2026-05-06 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,430,288,000 | 0 | Net 90 | Delivery schedule: - 15/04 (80T) - 22/04 (80T) - 29/04 (80T) Acuan kurs bulanan: 16,877 |
| 260300390 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260300521 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 75,000 | 2,500 | 4 | 260500834 | 2026-05-26 | 56 | 2026-05-07 | Late | Lokal | IDR | GRAHA JAYA SENTOSA CV. | S0001 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 187,500,000 | 0 | Net 60 | – |
| 260300390 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260300521 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 75,000 | 2,500 | 4 | 260600066 | 2026-06-03 | 64 | 2026-05-07 | Late | Lokal | IDR | GRAHA JAYA SENTOSA CV. | S0001 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 187,500,000 | 0 | Net 60 | – |
| 260300390 | 2026-03-27 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260300521 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 75,000 | 2,500 | 4 | 260500836 | 2026-05-26 | 56 | 2026-05-07 | Late | Lokal | IDR | GRAHA JAYA SENTOSA CV. | S0001 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 187,500,000 | 0 | Net 60 | – |
| 260300392 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260300527 | 2026-03-31 | 2026-04-28 | 2026-04-28 | 120,000 | 7,763.42 | 4 | 260400580 | 2026-04-17 | 17 | 2026-05-05 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 931,610,400 | 0 | Net 90 | Delivery schedule: - 21/04 (40T) - 24/04 (40T) - 28/04 (40T) Acuan kurs bulanan: 16,877 |
| 260300392 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260300527 | 2026-03-31 | 2026-04-28 | 2026-04-28 | 120,000 | 7,763.42 | 4 | 260400367 | 2026-04-11 | 11 | 2026-05-05 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 931,610,400 | 0 | Net 90 | Delivery schedule: - 21/04 (40T) - 24/04 (40T) - 28/04 (40T) Acuan kurs bulanan: 16,877 |
| 260300392 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260300527 | 2026-03-31 | 2026-04-28 | 2026-04-28 | 120,000 | 7,763.42 | 4 | 260400442 | 2026-04-14 | 14 | 2026-05-05 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 931,610,400 | 0 | Net 90 | Delivery schedule: - 21/04 (40T) - 24/04 (40T) - 28/04 (40T) Acuan kurs bulanan: 16,877 |
| 260300392 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260300527 | 2026-03-31 | 2026-04-28 | 2026-04-28 | 120,000 | 7,763.42 | 4 | 260400726 | 2026-04-21 | 21 | 2026-05-05 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 931,610,400 | 0 | Net 90 | Delivery schedule: - 21/04 (40T) - 24/04 (40T) - 28/04 (40T) Acuan kurs bulanan: 16,877 |
| 260300393 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260300522 | 2026-03-31 | 2026-04-27 | 2026-04-27 | 90,000 | 8,016.58 | 4 | 260500395 | 2026-05-13 | 43 | 2026-05-04 | Late | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 721,492,200 | 0 | Net 90 | Delivery schedule: - 13/04 (30T) - 20/04 (30T) - 27/04 (30T) Acuan kurs bulanan: 16,877 |
| 260300393 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260300522 | 2026-03-31 | 2026-04-27 | 2026-04-27 | 90,000 | 8,016.58 | 4 | 260400480 | 2026-04-15 | 15 | 2026-05-04 | On time | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 721,492,200 | 0 | Net 90 | Delivery schedule: - 13/04 (30T) - 20/04 (30T) - 27/04 (30T) Acuan kurs bulanan: 16,877 |
| 260300393 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260300522 | 2026-03-31 | 2026-04-27 | 2026-04-27 | 90,000 | 8,016.58 | 4 | 260400479 | 2026-04-15 | 15 | 2026-05-04 | On time | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 721,492,200 | 0 | Net 90 | Delivery schedule: - 13/04 (30T) - 20/04 (30T) - 27/04 (30T) Acuan kurs bulanan: 16,877 |
| 260300393 | 2026-03-27 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260300522 | 2026-03-31 | 2026-04-27 | 2026-04-27 | 90,000 | 8,016.58 | 4 | 260400765 | 2026-04-22 | 22 | 2026-05-04 | On time | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 721,492,200 | 0 | Net 90 | Delivery schedule: - 13/04 (30T) - 20/04 (30T) - 27/04 (30T) Acuan kurs bulanan: 16,877 |
| 260300395 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0019 | OPACIFIER U-10 | 260600040 | 28,580.8 | 260300533 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 55,000 | 27,188.8 | 4 | 260400630 | 2026-04-17 | 17 | 2026-05-07 | On time | Lokal | IDR | PRIMACO PUTRA PERSADA CV. | S0023 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 1,495,384,000 | 0 | Net 60 | Delivery schedule: - 18/04 (30T) - 30/04 (25T) Acuan kurs BI: 16,993 |
| 260300395 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0019 | OPACIFIER U-10 | 260600040 | 28,580.8 | 260300533 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 55,000 | 27,188.8 | 4 | 260400893 | 2026-04-24 | 24 | 2026-05-07 | On time | Lokal | IDR | PRIMACO PUTRA PERSADA CV. | S0023 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 1,495,384,000 | 0 | Net 60 | Delivery schedule: - 18/04 (30T) - 30/04 (25T) Acuan kurs BI: 16,993 |
| 260300396 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260300517 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 230,000 | 9,463.75 | 4 | 260400470 | 2026-04-14 | 14 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,176,662,500 | 0 | Net 120 | Delivery schedule: - 07/04 (40T) - 14/04 (40T) - 20/04 (40T) - 24/04 (40T) - 28/04 (40T) - 30/04 (30T) |
| 260300396 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260300517 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 230,000 | 9,463.75 | 4 | 260400471 | 2026-04-14 | 14 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,176,662,500 | 0 | Net 120 | Delivery schedule: - 07/04 (40T) - 14/04 (40T) - 20/04 (40T) - 24/04 (40T) - 28/04 (40T) - 30/04 (30T) |
| 260300396 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260300517 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 230,000 | 9,463.75 | 4 | 260400729 | 2026-04-21 | 21 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,176,662,500 | 0 | Net 120 | Delivery schedule: - 07/04 (40T) - 14/04 (40T) - 20/04 (40T) - 24/04 (40T) - 28/04 (40T) - 30/04 (30T) |
| 260300396 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260300517 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 230,000 | 9,463.75 | 4 | 260401055 | 2026-04-29 | 29 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,176,662,500 | 0 | Net 120 | Delivery schedule: - 07/04 (40T) - 14/04 (40T) - 20/04 (40T) - 24/04 (40T) - 28/04 (40T) - 30/04 (30T) |
| 260300396 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260300517 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 230,000 | 9,463.75 | 4 | 260400895 | 2026-04-24 | 24 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,176,662,500 | 0 | Net 120 | Delivery schedule: - 07/04 (40T) - 14/04 (40T) - 20/04 (40T) - 24/04 (40T) - 28/04 (40T) - 30/04 (30T) |
| 260300396 | 2026-03-27 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260300517 | 2026-03-31 | 2026-04-30 | 2026-04-30 | 230,000 | 9,463.75 | 4 | 260500115 | 2026-05-06 | 36 | 2026-05-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-04-02 | Moch Firdaus Fasa Zulfikiri | KG | 2,176,662,500 | 0 | Net 120 | Delivery schedule: - 07/04 (40T) - 14/04 (40T) - 20/04 (40T) - 24/04 (40T) - 28/04 (40T) - 30/04 (30T) |