Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.

LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.

PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.

VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).

KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).

On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.

Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.

PR NoPR DateItem GroupItem CodeItemLast POLast PricePO NoPO Date ▼ETAETA (PO Report)QtyPricePR→POGRPO NoGRPO DatePO→GRPODeadlineRealisasiL/ICurrencyVendorVendor CodeStatus PRStatus PORequired DateRequest ByUoMTotal POOutstandingTOPRemarks
2603000772026-03-07SPAREPART5011.0031BEARING 3030426030018365,0002603001832026-03-092026-03-162026-03-161265,00022603009862026-03-31222026-03-23LateLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2026-09-03GitaPCS780,0000Net 60GEATBOX CONVEYOR BMSD
2603000772026-03-07SPAREPART5011.0031BEARING 3030426030018365,0002603001832026-03-092026-03-162026-03-161265,00022603005222026-03-1232026-03-23On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2026-09-03GitaPCS780,0000Net 60GEATBOX CONVEYOR BMSD
2603000862026-03-07SPAREPART5011.0568BEARING 63311260300264481,981.982603002222026-03-092026-03-172026-03-172700,00022603005322026-03-1232026-03-24On timeLokalIDRSAKURA BEARINGS0132CLOSEDCLOSED2026-03-10GitaPCS1,400,0000Net 60MOTOR SARINGAN GETAR PRESS PN1. 63311 ZZ NTN
2603000872026-03-07SPAREPART5017.0145TELE SELECTOR XB4 BD21260600295122,9002603002232026-03-092026-03-272026-03-2715120,00022603005342026-03-1232026-04-03On timeLokalIDRSAMUDRA ARUNG NUSANTARA. PTS0738CLOSEDCLOSED2026-03-14GitaPCS1,800,0000Net 30DIST COLLECTOR SQUARING - KEDA. HARGA NAIK
2603000872026-03-07SPAREPART5017.0147TELE SELECTOR XB4 BD33260300481142,8002603002232026-03-092026-03-272026-03-2715137,50022603005342026-03-1232026-04-03On timeLokalIDRSAMUDRA ARUNG NUSANTARA. PTS0738CLOSEDCLOSED2026-03-14GitaPCS2,062,5000Net 30DIST COLLECTOR SQUARING - KEDA. HARGA NAIK
2603001002026-03-09PERSEDIAAN UMUM6030.004PIPA GALVANIS 3" 3 INCH260300209971,171.172603002092026-03-092026-03-092026-03-0910971,171.172603007262026-03-1782026-03-16LateLokalIDRRANGKA RAYA PT.S0450CLOSEDCLOSED2026-03-13GitaBTG9,711,711.70Net 14WWTP
2603001002026-03-09PERSEDIAAN UMUM6030.2446CAT MENI SILVER26030044533,148.292603002002026-03-092026-03-092026-03-0910032,7002603006822026-03-1672026-03-16On timeLokalIDRTIRTAKENCANA TATAWARNA PT.S0404CLOSEDCLOSED2026-03-13GitaKG3,270,0000Net 30WWTP(@20kg)
2603001012026-03-07BAHAN PEMBANTU2045.0007PALLET LOKAL BARU 110*11026060027161,0002603001722026-03-092026-03-302026-03-301,00053,00022603006862026-03-1672026-04-06On timeLokalIDRJENNY PALETS0676CLOSEDCLOSED2026-03-12Moch Firdaus Fasa Zulfikiri53,000,0000Net 60
2603001012026-03-07BAHAN PEMBANTU2045.0007PALLET LOKAL BARU 110*11026060027161,0002603001722026-03-092026-03-302026-03-301,00053,00022026-04-06OverdueLokalIDRJENNY PALETS0676CLOSEDCLOSED2026-03-12Moch Firdaus Fasa Zulfikiri53,000,0000Net 60
2603001012026-03-07BAHAN PEMBANTU2045.0007PALLET LOKAL BARU 110*11026060027161,0002603001722026-03-092026-03-302026-03-301,00053,00022604002312026-04-08302026-04-06LateLokalIDRJENNY PALETS0676CLOSEDCLOSED2026-03-12Moch Firdaus Fasa Zulfikiri53,000,0000Net 60
2603001012026-03-07BAHAN PEMBANTU2045.0007PALLET LOKAL BARU 110*11026060027161,0002603001722026-03-092026-03-302026-03-301,00053,00022604010142026-04-28502026-04-06LateLokalIDRJENNY PALETS0676CLOSEDCLOSED2026-03-12Moch Firdaus Fasa Zulfikiri53,000,0000Net 60
2603001012026-03-07BAHAN PEMBANTU2045.0007PALLET LOKAL BARU 110*11026060027161,0002603001722026-03-092026-03-302026-03-301,00053,00022603004672026-03-1122026-04-06On timeLokalIDRJENNY PALETS0676CLOSEDCLOSED2026-03-12Moch Firdaus Fasa Zulfikiri53,000,0000Net 60
2603001022026-03-07BAHAN PEMBANTU2024.0001OPP 48*10026050005510,4952603001702026-03-092026-03-122026-03-121,6567,00022604002262026-04-08302026-03-19LateLokalIDRTUNAS MITRA MAJU PT.S0401CLOSEDCLOSED2026-03-12Moch Firdaus Fasa ZulfikiriROLL11,592,0000Net 30
2603001022026-03-07BAHAN PEMBANTU2024.0001OPP 48*10026050005510,4952603001702026-03-092026-03-122026-03-121,6567,00022604000382026-04-02242026-03-19LateLokalIDRTUNAS MITRA MAJU PT.S0401CLOSEDCLOSED2026-03-12Moch Firdaus Fasa ZulfikiriROLL11,592,0000Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001772026-03-092026-03-282026-03-2850052,00022605002772026-05-09612026-04-04LateLokalIDRJAYA BERKAHS0726CLOSEDOPEN2026-03-09Moch Firdaus Fasa ZulfikiriPCS26,000,00098Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001782026-03-092026-03-302026-03-3060047,00022604000422026-04-02242026-04-06On timeLokalIDRPRIMA PALETS0521CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS28,200,0000Net 14
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001782026-03-092026-03-302026-03-3060047,00022604004582026-04-14362026-04-06LateLokalIDRPRIMA PALETS0521CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS28,200,0000Net 14
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001782026-03-092026-03-302026-03-3060047,00022604000112026-04-01232026-04-06On timeLokalIDRPRIMA PALETS0521CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS28,200,0000Net 14
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001772026-03-092026-03-282026-03-2850052,00022606005802026-06-15982026-04-04LateLokalIDRJAYA BERKAHS0726CLOSEDOPEN2026-03-09Moch Firdaus Fasa ZulfikiriPCS26,000,00098Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001752026-03-092026-03-162026-03-162,00047,00022604006642026-04-20422026-03-23LateLokalIDRSUCSES BERSAMAS0937CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS94,000,0000Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001752026-03-092026-03-162026-03-162,00047,00022603006792026-03-1672026-03-23On timeLokalIDRSUCSES BERSAMAS0937CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS94,000,0000Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001782026-03-092026-03-302026-03-3060047,00022603009582026-03-30212026-04-06On timeLokalIDRPRIMA PALETS0521CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS28,200,0000Net 14
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001752026-03-092026-03-162026-03-162,00047,00022603006812026-03-1672026-03-23On timeLokalIDRSUCSES BERSAMAS0937CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS94,000,0000Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001752026-03-092026-03-162026-03-162,00047,00022603004652026-03-1122026-03-23On timeLokalIDRSUCSES BERSAMAS0937CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS94,000,0000Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001752026-03-092026-03-162026-03-162,00047,00022603007612026-03-1782026-03-23On timeLokalIDRSUCSES BERSAMAS0937CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS94,000,0000Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001752026-03-092026-03-162026-03-162,00047,00022603006102026-03-1452026-03-23On timeLokalIDRSUCSES BERSAMAS0937CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS94,000,0000Net 30
2603001052026-03-07BAHAN PEMBANTU2045.0011PALLET LOKAL BARU 100*110 BALOK 426060029647,0002603001752026-03-092026-03-162026-03-162,00047,00022603005062026-03-1232026-03-23On timeLokalIDRSUCSES BERSAMAS0937CLOSEDCLOSED2026-03-09Moch Firdaus Fasa ZulfikiriPCS94,000,0000Net 30
2603001062026-03-07BAHAN PEMBANTU2022.0003PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR260600221350,0002603001762026-03-092026-03-302026-03-30300350,00022026-04-06OverdueLokalIDRGREEN SPAN PACKAGING SYSTEM PT.S0119CLOSEDOPEN2026-03-27Moch Firdaus Fasa ZulfikiriROLL105,000,000300Net 60
2603100012026-03-02SPAREPART5024.0622UPPER GP 600X13502603100665702603100662026-03-092026-03-092026-03-09457072605105702026-05-20722026-03-16LateImporUSDLIDE TRADING (HONG KONG) CO., LTD.S0465CLOSEDCLOSED2026-03-09Ibnu DarmawanPCS38,575,3200Net 30REFF : 40/PROD-PK2/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN MR. ZHE ZHAOWEN
2603100012026-03-02SPAREPART5024.0623LOWER GP 600X13502603100665302603100662026-03-092026-03-092026-03-09453072605105702026-05-20722026-03-16LateImporUSDLIDE TRADING (HONG KONG) CO., LTD.S0465CLOSEDCLOSED2026-03-09Ibnu DarmawanPCS35,868,2800Net 30REFF : 40/PROD-PK2/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN MR. ZHE ZHAOWEN
2603100012026-03-02SPAREPART5024.0624MOLD SET (ASSEMBLY) 600X600-2W26031006580,0002603100652026-03-092026-03-092026-03-09380,00072026-03-16OverdueImporRMBXIAMEN XINWANG IMPORT & EXPORT CO,-LTD.S1145CLOSEDCLOSED2026-03-09Ibnu DarmawanSET588,667,2000- Cash Basic -REFF : 40/PROD-PK2/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN MR. ZHE ZHAOWEN
2603100012026-03-02SPAREPART5024.0624MOLD SET (ASSEMBLY) 600X600-2W26031006580,0002603100652026-03-092026-03-092026-03-09380,00072605107112026-05-23752026-03-16LateImporRMBXIAMEN XINWANG IMPORT & EXPORT CO,-LTD.S1145CLOSEDCLOSED2026-03-09Ibnu DarmawanSET588,667,2000- Cash Basic -REFF : 40/PROD-PK2/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN MR. ZHE ZHAOWEN
2603100122026-03-04PERSEDIAAN UMUM6030.2584ELBOW 1 1/4 GALVANIS26031005512,8252603100552026-03-092026-03-182026-03-18312,82552603102142026-03-1232026-03-25On timeLokalIDRSHOPEE INTERNATIONAL INDONESIA. PTS1043CLOSEDCLOSED2026-03-11Ibnu DarmawanPCS38,4750CODREFF: REVISI PR 260110035
2603100152026-03-06STATIONERY6010.0501CETAKAN FORM TILE SHAPE INSPECTION RECORD ( FORM HD01 )26031006280,0002603100622026-03-092026-03-182026-03-18280,00032026-03-25OverdueLokalIDRANUGRAH PUTRA. CVS0852OPENOPEN2026-03-13Ibnu DarmawanRIM160,0002Net 7REFF : HR/II/2026 KEBUTUHAN ATK PK2 ATAS PERMINTAAN SADDAM THARIQ
2603100152026-03-06STATIONERY6010.0751CETAKAN FORM PACKING SORTIR FR-QMS-1126031006280,0002603100622026-03-092026-03-182026-03-182080,00032026-03-25OverdueLokalIDRANUGRAH PUTRA. CVS0852OPENOPEN2026-03-13Ibnu DarmawanRIM1,600,00020Net 7REFF : HR/II/2026 KEBUTUHAN ATK PK2 ATAS PERMINTAAN SADDAM THARIQ
2603100162026-03-06BAHAN BAKU GLAZE1070.003INK DP BLACK GSY 99023 GUOSE260310056952603100562026-03-092026-03-092026-03-092,0009532604105382026-04-28502026-03-16LateImporRMBFOSHAN KINWIN CERAMIC PIGMENT CO.,LTDS0909CLOSEDCLOSED2026-04-18Aulia SafitriKG466,028,2000CBDBUFFER STOK APRIL DAN PERSIAPAN PRODUKSI BLACK SERIES
2603100162026-03-06BAHAN BAKU GLAZE1070.0031INK DP RED GSB 10023 GUOSE2603100561202603100562026-03-092026-03-092026-03-091,00012032604105382026-04-28502026-03-16LateImporRMBFOSHAN KINWIN CERAMIC PIGMENT CO.,LTDS0909CLOSEDCLOSED2026-04-18Aulia SafitriKG294,333,6000CBDBUFFER STOK APRIL DAN PERSIAPAN PRODUKSI BLACK SERIES
2603100162026-03-06BAHAN BAKU GLAZE1070.0029INK DP YELLOW GSB 20010 GUOSE260310056982603100562026-03-092026-03-092026-03-091,0009832604105382026-04-28502026-03-16LateImporRMBFOSHAN KINWIN CERAMIC PIGMENT CO.,LTDS0909CLOSEDCLOSED2026-04-18Aulia SafitriKG240,372,4400CBDBUFFER STOK APRIL DAN PERSIAPAN PRODUKSI BLACK SERIES
2603100172026-03-06BAHAN BAKU BODY1010.0014FELDSPAR IN-05 10#2606100218452603100572026-03-092026-03-092026-03-095,000,00030032026-03-16OverdueLokalIDRBUMI MINERAL INDONUSA, CV.S0776CLOSEDOPEN2026-04-21Aulia SafitriKG1,500,000,0005,000,000Net 45PEMENUHAN STOK UNTUK MATERIAL BODY DOBEL LOADING
2603100172026-03-06BAHAN BAKU BODY1010.0025CRUDE KAOLIN 101 B2605100203902603100582026-03-092026-03-092026-03-094,500,00039032026-03-16OverdueLokalIDRKIAN SUKSES MANDIRI,.PTS0839CLOSEDCLOSED2026-04-28Aulia SafitriKG1,755,000,0000Net 30PEMENUHAN STOK UNTUK MATERIAL BODY DOBEL LOADING
2603100172026-03-06BAHAN BAKU BODY1010.0025CRUDE KAOLIN 101 B2605100203902603100582026-03-092026-03-092026-03-094,500,00039032604105842026-04-30522026-03-16LateLokalIDRKIAN SUKSES MANDIRI,.PTS0839CLOSEDCLOSED2026-04-28Aulia SafitriKG1,755,000,0000Net 30PEMENUHAN STOK UNTUK MATERIAL BODY DOBEL LOADING
2603100172026-03-06BAHAN BAKU BODY1010.0025CRUDE KAOLIN 101 B2605100203902603100582026-03-092026-03-092026-03-094,500,00039032604105522026-04-29512026-03-16LateLokalIDRKIAN SUKSES MANDIRI,.PTS0839CLOSEDCLOSED2026-04-28Aulia SafitriKG1,755,000,0000Net 30PEMENUHAN STOK UNTUK MATERIAL BODY DOBEL LOADING
2511003792025-11-25SPAREPART5032.1408BOLT NO. 4-5 02B0003 (GB10-88 M20X90)26030015622603001562026-03-072026-08-302026-08-301421022606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2025-11-27Nanda Ayu PratiwiPCS472,8080Net 60BUCKET LOADER XG 07
2511003792025-11-25SPAREPART5032.1407NUT NO. 4-3 03B0015 (GB6170-2000 M20)2603001560.42603001562026-03-072026-08-302026-08-30140.41022606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2025-11-27Nanda Ayu PratiwiPCS94,561.60Net 60BUCKET LOADER XG 07
2511003792025-11-25SPAREPART5032.1406HYDRAULIC HOSE NO. 30 06C171626030015626.12603001562026-03-072026-08-302026-08-30226.11022606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS881,449.20Net 60STEERING LOADER XG 07 (955H)
2512000812025-12-03SPAREPART5032.1406HYDRAULIC HOSE NO. 30 06C171626030015626.12603001562026-03-072026-08-302026-08-30226.1942606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS881,449.20Net 60STEERING LOADER XG 07 (955H)
2512000812025-12-03SPAREPART5032.1415HOSE NO 3 XG953 06C0106/H19/22 II L 115026030015631.52603001562026-03-072026-08-302026-08-30231.5942606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS1,063,8180Net 60HYDRAULIC BUCKET LOADER XG 06 (953H)
2601001932026-01-15SPAREPART5032.1456RING GEAR NO 16 ( 42A0005 )2603001562002603001562026-03-072026-08-302026-08-302200512606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-01-21Nanda Ayu PratiwiPCS6,754,4000Net 60SPARE LOADER XG 07
2601001932026-01-15SPAREPART5032.1457PLANETARY CARRIER ASSEM NO 17 ( 51C0090 )260300156504.32603001562026-03-072026-08-302026-08-302504.3512606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-01-21Nanda Ayu PratiwiPCS17,031,219.60Net 60SPARE LOADER XG 07
2601001932026-01-15SPAREPART5032.1455SNAP RING NO 15 (07B0054)26030015611.72603001562026-03-072026-08-302026-08-30211.7512606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-01-21Nanda Ayu PratiwiPCS395,132.40Net 60SPARE LOADER XG 07
2601001932026-01-15SPAREPART5032.1454RING HUB NO 14 (41A0031)260300156126.12603001562026-03-072026-08-302026-08-302126.1512606003862026-06-10952026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-01-21Nanda Ayu PratiwiPCS4,258,649.20Net 60SPARE LOADER XG 07
2601005242026-02-09SPAREPART5030.1387CLAMP 832053140326030014310.212603001432026-03-072026-06-302026-06-301510.21262026-07-07OutstandingImporEURESSEPIENNE SRLS1077CLOSEDOPEN2026-02-12GitaPCS3,001,288.2115Net 30PACKING 1A, 1B, & 2A
2601005732026-02-10SPAREPART5030.0305RUBBER ROLL () (out) 55 mm * (in) 49 mm2603001571.12603001572026-03-072026-08-302026-08-302001.1252606004252026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-25GitaMTR3,714,9200Net 60OUTPUT KILN 1A & 1B
2601005732026-02-10SPAREPART5030.0305RUBBER ROLL () (out) 55 mm * (in) 49 mm2603001571.12603001572026-03-072026-08-302026-08-302001.1252026-09-06OutstandingImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-25GitaMTR3,714,9200Net 60OUTPUT KILN 1A & 1B
2601006142026-02-13SPAREPART5030.1795BATTERAI CSB HR 1234W F2 12V 34W260300143302603001432026-03-072026-06-302026-06-302230222026-07-07OutstandingImporEURESSEPIENNE SRLS1077CLOSEDOPEN2026-02-19GitaPCS12,934,05322Net 30PACKING NOUVAFIMA 2A & 2C
2601006972026-02-18BAHAN BAKU GLAZE1070.0005INK - CIK MA 5115 BROWN260600273145,5232603001582026-03-072026-03-272026-03-27654141,394172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG92,471,6760Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0004INK - CIK AZ 1111 BLUE260600273298,6292603001582026-03-072026-03-272026-03-27528274,423172603008582026-03-26192026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG144,895,3440Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0005INK - CIK MA 5115 BROWN260600273145,5232603001582026-03-072026-03-272026-03-27654141,394172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG92,471,6760Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0004INK - CIK AZ 1111 BLUE260600273298,6292603001582026-03-072026-03-272026-03-27528274,423172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG144,895,3440Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0004INK - CIK AZ 1111 BLUE260600273298,6292603001582026-03-072026-03-272026-03-27528274,423172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG144,895,3440Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0022INK - CIK RC 1116 SINKING260500301262,1882603001582026-03-072026-03-272026-03-27120260,682172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG31,281,8400Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0021INK - CIK NE 1170 BLACK260600284228,5322603001582026-03-072026-03-272026-03-27384203,328172603008582026-03-26192026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG78,077,9520Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0022INK - CIK RC 1116 SINKING260500301262,1882603001582026-03-072026-03-272026-03-27120260,682172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG31,281,8400Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0021INK - CIK NE 1170 BLACK260600284228,5322603001582026-03-072026-03-272026-03-27384203,328172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG78,077,9520Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0022INK - CIK RC 1116 SINKING260500301262,1882603001582026-03-072026-03-272026-03-27120260,682172603010202026-03-31242026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG31,281,8400Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0019INK - CIK AZ 1165 BLUE260600119228,3272603001582026-03-072026-03-272026-03-27192206,116172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG39,574,2720Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0019INK - CIK AZ 1165 BLUE260600119228,3272603001582026-03-072026-03-272026-03-27192206,116172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG39,574,2720Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0021INK - CIK NE 1170 BLACK260600284228,5322603001582026-03-072026-03-272026-03-27384203,328172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG78,077,9520Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0018INK - CIK AM 5456 YELLOW260400292144,9802603001582026-03-072026-03-272026-03-27654147,368172603008582026-03-26192026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG96,378,6720Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0018INK - CIK AM 5456 YELLOW260400292144,9802603001582026-03-072026-03-272026-03-27654147,368172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG96,378,6720Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0018INK - CIK AM 5456 YELLOW260400292144,9802603001582026-03-072026-03-272026-03-27654147,368172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG96,378,6720Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.002INK - CIK MA 5457 BROWN26060024697,9722603001582026-03-072026-03-272026-03-2761895,192172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG58,828,6560Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.002INK - CIK MA 5457 BROWN26060024697,9722603001582026-03-072026-03-272026-03-2761895,192172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG58,828,6560Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.002INK - CIK MA 5457 BROWN26060024697,9722603001582026-03-072026-03-272026-03-2761895,192172603008582026-03-26192026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG58,828,6560Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0015INK - CIK GL 1219 GLOSSY260600139256,2022603001582026-03-072026-03-272026-03-27144248,932172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG35,846,2080Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0019INK - CIK AZ 1165 BLUE260600119228,3272603001582026-03-072026-03-272026-03-27192206,116172603008582026-03-26192026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG39,574,2720Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0003INK - CIK BG 9154 BEIGE260500234151,6242603001582026-03-072026-03-272026-03-2712150,753172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG1,809,0362Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0001INK - CIK RO 4118 PINK260600030231,1962603001582026-03-072026-03-272026-03-2712224,636172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG2,695,6320Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0007INK - CIK RC 1151 SINKING260600273284,2812603001582026-03-072026-03-272026-03-27192276,215172603010202026-03-31242026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG53,033,2800Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0007INK - CIK RC 1151 SINKING260600273284,2812603001582026-03-072026-03-272026-03-27192276,215172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG53,033,2800Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0006INK - CIK NE 6153 BLACK260600246259,2762603001582026-03-072026-03-272026-03-27300231,806172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG69,541,8000Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0002INK - CIK AM 5118 YELLOW260600273179,3412603001582026-03-072026-03-272026-03-27360174,253172603006642026-03-1692026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG62,731,0800Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0002INK - CIK AM 5118 YELLOW260600273179,3412603001582026-03-072026-03-272026-03-27360174,253172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG62,731,0800Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0005INK - CIK MA 5115 BROWN260600273145,5232603001582026-03-072026-03-272026-03-27654141,394172603008582026-03-26192026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG92,471,6760Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0006INK - CIK NE 6153 BLACK260600246259,2762603001582026-03-072026-03-272026-03-27300231,806172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG69,541,8000Net 120
2601006972026-02-18BAHAN BAKU GLAZE1070.0007INK - CIK RC 1151 SINKING260600273284,2812603001582026-03-072026-03-272026-03-27192276,215172603005602026-03-1362026-04-03On timeLokalIDRESMALGLASS INDONESIA PT.S0007OPENOPEN2026-03-02QhadafyKG53,033,2800Net 120
2601007482026-02-20SPAREPART5032.1468PUMP ASM : MATER W/GASKET NO. 1 (A) 897028-5920260300157632603001572026-03-072026-08-302026-08-30263152606004242026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS2,127,6360Net 60SPARE FORKLIFT TAILIFT 18, 19, & HELI 01, 08
2601007482026-02-20SPAREPART5032.1468PUMP ASM : MATER W/GASKET NO. 1 (A) 897028-5920260300157632603001572026-03-072026-08-302026-08-30263152026-09-06OutstandingImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS2,127,6360Net 60SPARE FORKLIFT TAILIFT 18, 19, & HELI 01, 08
2601007492026-02-20SPAREPART5032.147DRIVE SHAFT ASSEM NO. 10 41C00712603001571552603001572026-03-072026-08-302026-08-302155152606004242026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS5,234,6600Net 60SPARE LOADER XG03 & XG07 (MODEL XG958 & XG95571)
2601007492026-02-20SPAREPART5032.147DRIVE SHAFT ASSEM NO. 10 41C00712603001571552603001572026-03-072026-08-302026-08-302155152026-09-06OutstandingImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS5,234,6600Net 60SPARE LOADER XG03 & XG07 (MODEL XG958 & XG95571)
2601007492026-02-20SPAREPART5032.1469DRIVE SHAFT ASSEM NO. 7 51C00682603001571112603001572026-03-072026-08-302026-08-302111152606004242026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS3,748,6920Net 60SPARE LOADER XG03 & XG07 (MODEL XG958 & XG95571)
2601007492026-02-20SPAREPART5032.1471DRIVE SHAFT ASSEM NO. 13 51C00672603001571522603001572026-03-072026-08-302026-08-302152152606004242026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS5,133,3440Net 60SPARE LOADER XG03 & XG07 (MODEL XG958 & XG95571)
2601007492026-02-20SPAREPART5032.1469DRIVE SHAFT ASSEM NO. 7 51C00682603001571112603001572026-03-072026-08-302026-08-302111152026-09-06OutstandingImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS3,748,6920Net 60SPARE LOADER XG03 & XG07 (MODEL XG958 & XG95571)
2601007492026-02-20SPAREPART5032.1471DRIVE SHAFT ASSEM NO. 13 51C00672603001571522603001572026-03-072026-08-302026-08-302152152026-09-06OutstandingImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS5,133,3440Net 60SPARE LOADER XG03 & XG07 (MODEL XG958 & XG95571)
2601007502026-02-20SPAREPART5032.1473COMPRESSOR ENGINE2603001572252603001572026-03-072026-08-302026-08-301225152026-09-06OutstandingImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS3,799,3500Net 60BRAKE LOADER XG955H & XG958
2601007502026-02-20SPAREPART5032.1473COMPRESSOR ENGINE2603001572252603001572026-03-072026-08-302026-08-301225152606004242026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS3,799,3500Net 60BRAKE LOADER XG955H & XG958
2601007502026-02-20SPAREPART5032.1472WATER PUMP C20AB20AB601+G2606000581682603001572026-03-072026-08-302026-08-301168152026-09-06OutstandingImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS2,836,8480Net 60BRAKE LOADER XG955H & XG958
2601007502026-02-20SPAREPART5032.1472WATER PUMP C20AB20AB601+G2606000581682603001572026-03-072026-08-302026-08-301168152606004242026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-02-28GitaPCS2,836,8480Net 60BRAKE LOADER XG955H & XG958
2601007552026-02-20PERSEDIAAN UMUM6030.1895ELBOW LAS BESI 2 INCH26030014419,369.372603001442026-03-072026-03-072026-03-07219,369.37152603004502026-03-1142026-03-14On timeLokalIDRSUMBER ABADI CVS0665OPENCLOSED2026-02-25GitaPCS38,738.740Net 30KOMPRESOR BARU PN1 / GUDANG 92
2601007692026-02-21SPAREPART5029.0497RUBBER ROLL ( OUT ) 71 MM * ( IN ) 65 MM2603001571.52603001572026-03-072026-08-302026-08-303501.5142606004252026-06-11962026-09-06On timeImporUSDSHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD.S0583CLOSEDCLOSED2026-03-10GitaMTR8,865,1500Net 60ROLL OUTPUT KILN 1C