Three SAP exports are combined. The SPINE is PR TO PO TO GRPO — the master PR list (one row per PR-item, including PRs not yet converted to a PO). It sets the dashboard's date span and is KPI 4's denominator.
PO.csv enriches it with the PO details that only it carries: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), the ETA, currency and unit price, joined on PO No.
LEAD TIME PR TO GR adds the goods-receipt detail: one row per GR with its date and quantity, plus the ordered PO quantity, last/current price and PR→PO days. This is what makes the quantity-aware completion possible.
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality), 6 (Substitution) and 7 (New Vendor) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR No | PR Date | Item Group | Item Code | Item | Last PO | Last Price | PO No | PO Date ▼ | ETA | Qty | Price | PR→PO | GRPO No | GRPO Date | PO→GRPO | Deadline | Realisasi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260400163 | 2026-04-13 | SPAREPART | 5012.0148 | SEAL TC 35.52.7 | 260400422 | 8,700 | 260400422 | 2026-04-22 | 2026-05-05 | 15 | 8,700 | 9 | – | – | – | 2026-05-12 | Overdue |
| 260400183 | 2026-04-15 | SPAREPART | 5013.0003 | SELANG ANGIN PU 8 x 12 mm | 260600230 | 12,800 | 260400419 | 2026-04-22 | 2026-05-02 | 200 | 12,800 | 7 | 260400918 | 2026-04-24 | 2 | 2026-05-09 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.02 | NFT00 40X40 KOBIN MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 50,400 | 435 | 7 | 260500096 | 2026-05-05 | 13 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 390 | 7 | 260401012 | 2026-04-28 | 6 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0201 | NFT00 40X40 KOBIN MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 44,100 | 357 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0201 | NFT00 40X40 KOBIN MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 50,400 | 390 | 7 | 260401168 | 2026-04-30 | 8 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0216 | NFT00 40X40 KOBIN MP2 KW-B 403X54 (BK150/125/125) | 260500031 | 363 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 390 | 7 | 260500096 | 2026-05-05 | 13 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0222 | NFT00 40X40 PARIS MP2 KW-A 403X54 (BK150/125/125) | 260500474 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 107,100 | 357 | 7 | 260500183 | 2026-05-07 | 15 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 88,200 | 357 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.02 | NFT00 40X40 KOBIN MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 50,400 | 435 | 7 | 260500004 | 2026-05-02 | 10 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 390 | 7 | 260401168 | 2026-04-30 | 8 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0221 | NFT00 40X40 PARIS MP1 KW-A 403X51 (BK150/125/125) | 260500474 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 107,100 | 409 | 7 | 260500183 | 2026-05-07 | 15 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.02 | NFT00 40X40 KOBIN MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 50,400 | 435 | 7 | 260401168 | 2026-04-30 | 8 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 88,200 | 357 | 7 | 260500279 | 2026-05-09 | 17 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0216 | NFT00 40X40 KOBIN MP2 KW-B 403X54 (BK150/125/125) | 260500031 | 363 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 390 | 7 | 260500004 | 2026-05-02 | 10 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0226 | NFT00 40X40 MY MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 81,900 | 357 | 7 | 260500312 | 2026-05-11 | 19 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0201 | NFT00 40X40 KOBIN MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 44,100 | 357 | 7 | 260500226 | 2026-05-08 | 16 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0201 | NFT00 40X40 KOBIN MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 50,400 | 390 | 7 | 260500096 | 2026-05-05 | 13 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.02 | NFT00 40X40 KOBIN MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 44,100 | 409 | 7 | 260500226 | 2026-05-08 | 16 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0223 | NFT00 40X40 PARIS MP1 KW-B 403X51 (BK150/125/125) | 260400412 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 25,200 | 409 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0224 | NFT00 40X40 PARIS MP2 KW-B 403X54 (BK150/125/125) | 260400412 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 25,200 | 357 | 7 | 260500385 | 2026-05-12 | 20 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0225 | NFT00 40X40 MY MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 81,900 | 409 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0226 | NFT00 40X40 MY MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 81,900 | 357 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0223 | NFT00 40X40 PARIS MP1 KW-B 403X51 (BK150/125/125) | 260400412 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 25,200 | 409 | 7 | 260500226 | 2026-05-08 | 16 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0224 | NFT00 40X40 PARIS MP2 KW-B 403X54 (BK150/125/125) | 260400412 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 25,200 | 357 | 7 | 260500226 | 2026-05-08 | 16 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0224 | NFT00 40X40 PARIS MP2 KW-B 403X54 (BK150/125/125) | 260400412 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 25,200 | 357 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0221 | NFT00 40X40 PARIS MP1 KW-A 403X51 (BK150/125/125) | 260500474 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 107,100 | 409 | 7 | 260500279 | 2026-05-09 | 17 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0222 | NFT00 40X40 PARIS MP2 KW-A 403X54 (BK150/125/125) | 260500474 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 107,100 | 357 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0221 | NFT00 40X40 PARIS MP1 KW-A 403X51 (BK150/125/125) | 260500474 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 107,100 | 409 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.022 | NFT00 40X40 JUPITER MP2 KW-B 403X54 (BK150/125/125) | 260400412 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 390 | 7 | 260500096 | 2026-05-05 | 13 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 88,200 | 409 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.022 | NFT00 40X40 JUPITER MP2 KW-B 403X54 (BK150/125/125) | 260400412 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 390 | 7 | 260500004 | 2026-05-02 | 10 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0223 | NFT00 40X40 PARIS MP1 KW-B 403X51 (BK150/125/125) | 260400412 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 25,200 | 409 | 7 | 260500385 | 2026-05-12 | 20 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0201 | NFT00 40X40 KOBIN MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 50,400 | 390 | 7 | 260500004 | 2026-05-02 | 10 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.02 | NFT00 40X40 KOBIN MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 44,100 | 409 | 7 | 260500426 | 2026-05-13 | 21 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 88,200 | 409 | 7 | 260500279 | 2026-05-09 | 17 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 435 | 7 | 260401012 | 2026-04-28 | 6 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 390 | 7 | 260500777 | 2026-05-23 | 31 | 2026-05-14 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0215 | NFT00 40X40 KOBIN MP1 KW-B 403X51 (BK150/125/125) | 260500031 | 412 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 435 | 7 | 260500004 | 2026-05-02 | 10 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0219 | NFT00 40X40 JUPITER MP1 KW-B 403X51 (BK150/125/125) | 260400412 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 435 | 7 | 260500004 | 2026-05-02 | 10 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 435 | 7 | 260500776 | 2026-05-23 | 31 | 2026-05-14 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0222 | NFT00 40X40 PARIS MP2 KW-A 403X54 (BK150/125/125) | 260500474 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 107,100 | 357 | 7 | 260500279 | 2026-05-09 | 17 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.023 | NFT00 40X40 KAISAR MP2 KW-A 403X54 (BK150/125/125) | 260400412 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 50,400 | 357 | 7 | 260500183 | 2026-05-07 | 15 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0219 | NFT00 40X40 JUPITER MP1 KW-B 403X51 (BK150/125/125) | 260400412 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 435 | 7 | 260500096 | 2026-05-05 | 13 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 435 | 7 | 260500777 | 2026-05-23 | 31 | 2026-05-14 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0225 | NFT00 40X40 MY MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 81,900 | 409 | 7 | 260500135 | 2026-05-06 | 14 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 390 | 7 | 260500776 | 2026-05-23 | 31 | 2026-05-14 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.022 | NFT00 40X40 JUPITER MP2 KW-B 403X54 (BK150/125/125) | 260400412 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 12,600 | 357 | 7 | 260500226 | 2026-05-08 | 16 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0226 | NFT00 40X40 MY MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400412 | 2026-04-22 | 2026-05-18 | 81,900 | 357 | 7 | 260500135 | 2026-05-06 | 14 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0219 | NFT00 40X40 JUPITER MP1 KW-B 403X51 (BK150/125/125) | 260400412 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 12,600 | 409 | 7 | 260500226 | 2026-05-08 | 16 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0225 | NFT00 40X40 MY MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 81,900 | 409 | 7 | 260500312 | 2026-05-11 | 19 | 2026-05-25 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400411 | 2026-04-22 | 2026-05-07 | 126,000 | 435 | 7 | 260401168 | 2026-04-30 | 8 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0215 | NFT00 40X40 KOBIN MP1 KW-B 403X51 (BK150/125/125) | 260500031 | 412 | 260400411 | 2026-04-22 | 2026-05-07 | 12,600 | 435 | 7 | 260500096 | 2026-05-05 | 13 | 2026-05-14 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0229 | NFT00 40X40 KAISAR MP1 KW-A 403X51 (BK150/125/125) | 260400412 | 409 | 260400412 | 2026-04-22 | 2026-05-18 | 50,400 | 409 | 7 | 260500183 | 2026-05-07 | 15 | 2026-05-25 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0048 | BOX KOBIN HITAM T.S KW 3 30X30 | 260500382 | 1,177 | 260400400 | 2026-04-22 | 2026-05-11 | 16,800 | 1,177 | 6 | 260500280 | 2026-05-09 | 17 | 2026-05-18 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0048 | BOX KOBIN HITAM T.S KW 3 30X30 | 260500382 | 1,177 | 260400400 | 2026-04-22 | 2026-05-11 | 16,800 | 1,177 | 6 | 260500100 | 2026-05-05 | 13 | 2026-05-18 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0139 | BOX PARIS HIJAU TS 30*30 KW 2 | 260500098 | 905 | 260400400 | 2026-04-22 | 2026-05-11 | 6,300 | 1,177 | 6 | 260500182 | 2026-05-07 | 15 | 2026-05-18 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0045 | BOX PARIS T.S KW 1 30X30 | 260500382 | 1,177 | 260400400 | 2026-04-22 | 2026-05-11 | 18,900 | 1,177 | 6 | 260500100 | 2026-05-05 | 13 | 2026-05-18 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0045 | BOX PARIS T.S KW 1 30X30 | 260500382 | 1,177 | 260400400 | 2026-04-22 | 2026-05-11 | 18,900 | 1,177 | 6 | 260500182 | 2026-05-07 | 15 | 2026-05-18 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0044 | BOX JUPITER T.S KW 1 30X30 | 260500382 | 1,177 | 260400400 | 2026-04-22 | 2026-05-11 | 6,300 | 1,177 | 6 | 260500182 | 2026-05-07 | 15 | 2026-05-18 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0043 | BOX KOBIN T.S KW 1 30X30 | 260400400 | 1,177 | 260400397 | 2026-04-22 | 2026-04-30 | 50,000 | 1,320 | 6 | 260401169 | 2026-04-30 | 8 | 2026-05-07 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0043 | BOX KOBIN T.S KW 1 30X30 | 260400400 | 1,177 | 260400400 | 2026-04-22 | 2026-05-11 | 26,600 | 1,177 | 6 | 260500100 | 2026-05-05 | 13 | 2026-05-18 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0043 | BOX KOBIN T.S KW 1 30X30 | 260400400 | 1,177 | 260400397 | 2026-04-22 | 2026-04-30 | 50,000 | 1,320 | 6 | 260401019 | 2026-04-28 | 6 | 2026-05-07 | On time |
| 260400242 | 2026-04-17 | PERSEDIAAN UMUM | 6030.2924 | SELANG ANGIN PU Ø12MM | 260610005 | 13,500 | 260400399 | 2026-04-22 | 2026-04-22 | 100 | 13,500 | 5 | 260400878 | 2026-04-23 | 1 | 2026-04-29 | On time |
| 260400242 | 2026-04-17 | PERSEDIAAN UMUM | 6030.2925 | SELANG ANGIN PU Ø10MM | 260610006 | 11,500 | 260400399 | 2026-04-22 | 2026-04-22 | 100 | 10,000 | 5 | 260400878 | 2026-04-23 | 1 | 2026-04-29 | On time |
| 260400242 | 2026-04-17 | PERSEDIAAN UMUM | 6030.2927 | SELANG ANGIN PU Ø8MM | 260610006 | 8,000 | 260400399 | 2026-04-22 | 2026-04-22 | 50 | 7,000 | 5 | 260400878 | 2026-04-23 | 1 | 2026-04-29 | On time |
| 260400245 | 2026-04-17 | PERSEDIAAN UMUM | 6030.0655 | METERAN ROL | 260400420 | 171,171.17 | 260400420 | 2026-04-22 | 2026-05-04 | 1 | 171,171.17 | 5 | 260401028 | 2026-04-28 | 6 | 2026-05-11 | On time |
| 260400263 | 2026-04-18 | SPAREPART | 5017.0304 | PHOTO SENSOR OMRON E3Z-T61 | 260400410 | 740,000 | 260400410 | 2026-04-22 | 2026-04-22 | 6 | 740,000 | 4 | 260401035 | 2026-04-28 | 6 | 2026-04-29 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400418 | 2026-04-22 | 2026-05-02 | 190,000 | 1,645 | 5 | – | – | – | 2026-05-09 | Overdue |
| 260400285 | 2026-04-20 | SPAREPART | 5021.0472 | V. BELT B - 156 | 260400423 | 124,500 | 260400423 | 2026-04-22 | 2026-05-10 | 10 | 124,500 | 2 | 260400984 | 2026-04-27 | 5 | 2026-05-17 | On time |
| 260400296 | 2026-04-18 | PERSEDIAAN UMUM | 6030.0004 | SEMEN GRESIK 40KG | 260500241 | 59,500 | 260400413 | 2026-04-22 | 2026-04-22 | 14 | 59,500 | 4 | 260400877 | 2026-04-23 | 1 | 2026-04-29 | On time |
| 260410008 | 2026-04-06 | PERSEDIAAN UMUM | 6050.0579 | CAT AVIAN KUNING ROAD LINE | 260600171 | 58,502.7 | 260410137 | 2026-04-22 | 2026-04-22 | 40 | 46,472.7 | 16 | 260510045 | 2026-05-06 | 14 | 2026-04-29 | Late |
| 260410008 | 2026-04-06 | PERSEDIAAN UMUM | 6050.1695 | GORDEN POLOS L=90 CM x T=160 CM | 260410131 | 195,000 | 260410131 | 2026-04-22 | 2026-04-22 | 18 | 195,000 | 16 | – | – | – | 2026-04-29 | Overdue |
| 260410010 | 2026-04-07 | SPAREPART | 5011.0099 | BEARING 6204 2RS | 260500469 | 22,100 | 260410140 | 2026-04-22 | 2026-04-30 | 100 | 6,045 | 15 | 260510082 | 2026-05-06 | 14 | 2026-05-07 | On time |
| 260410010 | 2026-04-07 | SPAREPART | 5011.0102 | BEARING 6206 2RS C3 | 260600227 | 35,300 | 260410139 | 2026-04-22 | 2026-04-30 | 200 | 38,500 | 15 | 260410542 | 2026-04-29 | 7 | 2026-05-07 | On time |
| 260410010 | 2026-04-07 | SPAREPART | 5011.0101 | BEARING 6205 2RS | 260410140 | 7,110 | 260410140 | 2026-04-22 | 2026-04-30 | 200 | 7,110 | 15 | 260510082 | 2026-05-06 | 14 | 2026-05-07 | On time |
| 260410010 | 2026-04-07 | SPAREPART | 5011.0068 | BEARING 6004 2RS | 260500149 | 21,100 | 260410140 | 2026-04-22 | 2026-04-30 | 500 | 4,930 | 15 | 260510082 | 2026-05-06 | 14 | 2026-05-07 | On time |
| 260410010 | 2026-04-07 | SPAREPART | 5011.0103 | BEARING 6207 2RS C3 | 260410140 | 53,940 | 260410140 | 2026-04-22 | 2026-04-30 | 100 | 53,940 | 15 | 260510082 | 2026-05-06 | 14 | 2026-05-07 | On time |
| 260410039 | 2026-04-16 | PROMOSI | 6010.0889 | KATALOG KERAMIK: Paris | 260400404 | 4,600 | 260400404 | 2026-04-22 | 2026-04-29 | 700 | 4,600 | 6 | 260500753 | 2026-05-22 | 30 | 2026-05-06 | Late |
| 260410039 | 2026-04-16 | PROMOSI | 6010.0682 | KATALOG GRANITE: Paris | 260400404 | 4,600 | 260400404 | 2026-04-22 | 2026-04-29 | 700 | 4,600 | 6 | 260500753 | 2026-05-22 | 30 | 2026-05-06 | Late |
| 260410042 | 2026-04-16 | PERSEDIAAN UMUM | 6030.0961 | MATA BOR BESI 8 MM | 260600267 | 58,450 | 260410130 | 2026-04-22 | 2026-05-01 | 1 | 80,000 | 6 | 260410580 | 2026-04-30 | 8 | 2026-05-08 | On time |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.1975 | CAT AVIAN DOVE GREY 911 | 260410133 | 1,291,581 | 260410133 | 2026-04-22 | 2026-04-22 | 5 | 1,291,581 | 5 | 260510431 | 2026-05-18 | 26 | 2026-04-29 | Late |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.1833 | CAT AVIAN ACEAN BLUE 733 | 260410133 | 1,291,581 | 260410133 | 2026-04-22 | 2026-04-22 | 2 | 1,291,581 | 5 | 260510431 | 2026-05-18 | 26 | 2026-04-29 | Late |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.2544 | CAT ZINCROMATE AVIAN 9720 | 260510035 | 1,260,842.38 | 260410133 | 2026-04-22 | 2026-04-22 | 10 | 1,137,591.96 | 5 | 260510431 | 2026-05-18 | 26 | 2026-04-29 | Late |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.1976 | CAT AVIAN PANDAN GREEN 652 | 260410133 | 1,291,581 | 260410133 | 2026-04-22 | 2026-04-22 | 5 | 1,291,581 | 5 | 260510431 | 2026-05-18 | 26 | 2026-04-29 | Late |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.2929 | THINER A AVIAN @5LITER | 260510035 | 59,454.17 | 260410134 | 2026-04-22 | 2026-04-22 | 300 | 37,110 | 5 | – | – | – | 2026-04-29 | Overdue |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.1978 | CAT AVIAN ORCHID VIOLET 197 | 260410133 | 1,291,581 | 260410133 | 2026-04-22 | 2026-04-22 | 10 | 1,291,581 | 5 | 260510431 | 2026-05-18 | 26 | 2026-04-29 | Late |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.1977 | CAT AVIAN PUMPKIN ORANGE 179 | 260410133 | 1,291,581 | 260410133 | 2026-04-22 | 2026-04-22 | 1 | 1,291,581 | 5 | 260510431 | 2026-05-18 | 26 | 2026-04-29 | Late |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.245 | BESI HOLLOW HITAM 40X40X2MM | 260510178 | 210,000 | 260410138 | 2026-04-22 | 2026-04-22 | 100 | 223,000 | 5 | 260410486 | 2026-04-25 | 3 | 2026-04-29 | On time |
| 260410048 | 2026-04-17 | PERSEDIAAN UMUM | 6050.0654 | KUNCI L 5MM | 260500383 | 8,800 | 260410130 | 2026-04-22 | 2026-05-01 | 2 | 25,000 | 5 | 260410580 | 2026-04-30 | 8 | 2026-05-08 | On time |
| 260410048 | 2026-04-17 | PERSEDIAAN UMUM | 6050.0654 | KUNCI L 5MM | 260500383 | 8,800 | 260410129 | 2026-04-22 | 2026-05-01 | 8 | 25,000 | 5 | 260410579 | 2026-04-30 | 8 | 2026-05-08 | On time |
| 260410048 | 2026-04-17 | PERSEDIAAN UMUM | 6050.0923 | KUNCI L 4 MM | 260410130 | 22,000 | 260410128 | 2026-04-22 | 2026-05-01 | 18 | 18,000 | 5 | 260410578 | 2026-04-30 | 8 | 2026-05-08 | On time |
| 260410048 | 2026-04-17 | PERSEDIAAN UMUM | 6050.0924 | KUNCI L 6 MM | 260410144 | 13,514 | 260410144 | 2026-04-22 | 2026-05-01 | 10 | 13,514 | 5 | 260410540 | 2026-04-29 | 7 | 2026-05-08 | On time |
| 260410048 | 2026-04-17 | PERSEDIAAN UMUM | 6050.0923 | KUNCI L 4 MM | 260410130 | 22,000 | 260410130 | 2026-04-22 | 2026-05-01 | 2 | 22,000 | 5 | 260410580 | 2026-04-30 | 8 | 2026-05-08 | On time |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510309 | 2026-05-15 | 24 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510942 | 2026-05-30 | 39 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | – | – | – | 2026-05-06 | Overdue |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510185 | 2026-05-09 | 18 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510318 | 2026-05-15 | 24 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510616 | 2026-05-22 | 31 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510941 | 2026-05-30 | 39 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510773 | 2026-05-25 | 34 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510314 | 2026-05-15 | 24 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510311 | 2026-05-15 | 24 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510775 | 2026-05-25 | 34 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | – | – | – | 2026-05-06 | Overdue |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | – | – | – | 2026-05-06 | Overdue |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | – | – | – | 2026-05-06 | Overdue |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510315 | 2026-05-15 | 24 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510197 | 2026-05-11 | 20 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | – | – | – | 2026-05-06 | Overdue |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510258 | 2026-05-12 | 21 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510259 | 2026-05-12 | 21 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510944 | 2026-05-30 | 39 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510774 | 2026-05-25 | 34 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510936 | 2026-05-30 | 39 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510631 | 2026-05-22 | 31 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510256 | 2026-05-12 | 21 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510196 | 2026-05-11 | 20 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | 260510943 | 2026-05-30 | 39 | 2026-05-06 | Late |
| 260110005 | 2026-01-05 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260410118 | 2026-04-21 | 2026-04-29 | 4,000 | 41,000 | 106 | – | – | – | 2026-05-06 | Overdue |
| 260110025 | 2026-01-13 | PERSEDIAAN UMUM | 6030.1737 | BESI SIKU 50X50X3MM | 260410125 | 202,500 | 260410125 | 2026-04-21 | 2026-04-21 | 5 | 202,500 | 98 | 260410485 | 2026-04-25 | 4 | 2026-04-28 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260401059 | 2026-04-29 | 8 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260401137 | 2026-04-30 | 9 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260401058 | 2026-04-29 | 8 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260401138 | 2026-04-30 | 9 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260401139 | 2026-04-30 | 9 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500015 | 2026-05-02 | 11 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500016 | 2026-05-02 | 11 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500036 | 2026-05-04 | 13 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500013 | 2026-05-02 | 11 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500014 | 2026-05-02 | 11 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500018 | 2026-05-02 | 11 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500017 | 2026-05-02 | 11 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500080 | 2026-05-05 | 14 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500038 | 2026-05-04 | 13 | 2026-05-09 | On time |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400381 | 2026-04-21 | 2026-05-02 | 540,000 | 1,645 | 27 | 260500037 | 2026-05-04 | 13 | 2026-05-09 | On time |
| 260300408 | 2026-03-24 | PERSEDIAAN UMUM | 6030.2838 | BAUT + RING + MUR M 4X10 | 260400383 | 150 | 260400383 | 2026-04-21 | 2026-04-21 | 420 | 150 | 28 | 260400834 | 2026-04-22 | 1 | 2026-04-28 | On time |
| 260310049 | 2026-03-27 | PERSEDIAAN UMUM | 6030.0152 | BESI SIKU 60X60X6000 MM | 260410122 | 354,400 | 260410122 | 2026-04-21 | 2026-04-21 | 10 | 354,400 | 25 | 260410487 | 2026-04-25 | 4 | 2026-04-28 | On time |
| 260310049 | 2026-03-27 | PERSEDIAAN UMUM | 6030.0898 | BESI UNP 100X50X5MM (@ 6000MM) SNI | 260610067 | 576,000 | 260410122 | 2026-04-21 | 2026-04-21 | 15 | 576,000 | 25 | 260410487 | 2026-04-25 | 4 | 2026-04-28 | On time |
| 260310049 | 2026-03-27 | PERSEDIAAN UMUM | 6030.284 | BESI UNP 120X55X6MM (@ 6000MM) | 260410122 | 745,600 | 260410122 | 2026-04-21 | 2026-04-21 | 20 | 745,600 | 25 | 260410487 | 2026-04-25 | 4 | 2026-04-28 | On time |
| 260400055 | 2026-04-06 | PERSEDIAAN UMUM | 6050.1694 | VACUUM CLEANER PORTABLE | 260400395 | 800,000 | 260400395 | 2026-04-21 | 2026-04-28 | 1 | 800,000 | 15 | 260400988 | 2026-04-27 | 6 | 2026-05-05 | On time |
| 260400079 | 2026-04-08 | SPAREPART | 5031.1033 | RUBBER KOPLING 6 JARI OD90 ID45 T=20MM | 260400391 | 195,000 | 260400391 | 2026-04-21 | 2026-05-10 | 10 | 195,000 | 13 | 260600020 | 2026-06-02 | 42 | 2026-05-17 | Late |
| 260400079 | 2026-04-08 | SPAREPART | 5031.1033 | RUBBER KOPLING 6 JARI OD90 ID45 T=20MM | 260400391 | 195,000 | 260400391 | 2026-04-21 | 2026-05-10 | 10 | 195,000 | 13 | 260500892 | 2026-05-28 | 37 | 2026-05-17 | Late |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0397 | V. BELT C - 7000 | 260400396 | 12.7 | 260400396 | 2026-04-21 | 2026-06-20 | 8 | 12.7 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0388 | V. BELT C - 4600 | 260400396 | 8.35 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 8.35 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0167 | V. BELT C - 5800 | 260400396 | 10.55 | 260400396 | 2026-04-21 | 2026-06-20 | 12 | 10.55 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0396 | V. BELT C - 3100 | 260400396 | 5.7 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 5.7 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0387 | TIMING BELT LIPUDA 20-HTD8M-7376-3300 12 APL | 260400396 | 46 | 260400396 | 2026-04-21 | 2026-06-20 | 8 | 46 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0399 | V. BELT C - 4100 | 260400396 | 7.5 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 7.5 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0392 | V. BELT C - 4280 | 260400396 | 7.9 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 7.9 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0402 | V. BELT C - 3900 | 260400396 | 7.1 | 260400396 | 2026-04-21 | 2026-06-20 | 8 | 7.1 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0394 | V. BELT C - 5650 | 260400396 | 10.2 | 260400396 | 2026-04-21 | 2026-06-20 | 8 | 10.2 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0393 | V. BELT C - 7100 | 260400396 | 13 | 260400396 | 2026-04-21 | 2026-06-20 | 40 | 13 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0395 | V. BELT C - 3800 | 260400396 | 7 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 7 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0391 | V. BELT C - 4200 | 260400396 | 7.6 | 260400396 | 2026-04-21 | 2026-06-20 | 8 | 7.6 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0389 | V. BELT C - 7800 | 260400396 | 14.5 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 14.5 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0398 | V. BELT C - 5600 | 260400396 | 10.2 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 10.2 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0164 | V. BELT C - 4000 | 260400396 | 7.3 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 7.3 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.0401 | V. BELT C - 2450 | 260400396 | 4.5 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 4.5 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400084 | 2026-04-08 | SPAREPART | 5021.04 | V. BELT C - 3400 | 260400396 | 6.2 | 260400396 | 2026-04-21 | 2026-06-20 | 4 | 6.2 | 13 | 260600540 | 2026-06-13 | 53 | 2026-06-27 | On time |
| 260400103 | 2026-04-08 | SPAREPART | 5030.0842 | CYLINDER SC50X25 | 260400394 | 380,000 | 260400394 | 2026-04-21 | 2026-04-28 | 6 | 380,000 | 13 | 260400919 | 2026-04-24 | 3 | 2026-05-05 | On time |
| 260400103 | 2026-04-08 | SPAREPART | 5030.0617 | VACUUM EJECTOR MVVA-20 | 260400461 | 460,750 | 260400394 | 2026-04-21 | 2026-04-28 | 6 | 460,750 | 13 | 260400919 | 2026-04-24 | 3 | 2026-05-05 | On time |
| 260400123 | 2026-04-10 | SPAREPART | 5017.0145 | TELE SELECTOR XB4 BD21 | 260600252 | 122,900 | 260400389 | 2026-04-21 | 2026-05-02 | 15 | 130,000 | 11 | – | – | – | 2026-05-09 | Overdue |
| 260400123 | 2026-04-10 | SPAREPART | 5017.0052 | SELENOID VALVE SPC 4V210-08/24 VDC | 260500011 | 140,000 | 260400389 | 2026-04-21 | 2026-05-02 | 15 | 140,000 | 11 | – | – | – | 2026-05-09 | Overdue |
| 260400125 | 2026-04-10 | SPAREPART | 5011.0197 | BEARING FCB - 25 | 260400386 | 129,950 | 260400386 | 2026-04-21 | 2026-05-04 | 10 | 129,950 | 11 | 260600330 | 2026-06-09 | 49 | 2026-05-11 | Late |
| 260400125 | 2026-04-10 | SPAREPART | 5011.0176 | BEARING 6403 2RS | 260400386 | 83,350 | 260400386 | 2026-04-21 | 2026-05-04 | 10 | 83,350 | 11 | – | – | – | 2026-05-11 | Overdue |
| 260400127 | 2026-04-10 | SPAREPART | 5017.0422 | FAN PANEL 12X12X3.8 CM 220 V | 260400393 | 90,000 | 260400393 | 2026-04-21 | 2026-04-28 | 5 | 90,000 | 11 | 260401184 | 2026-04-30 | 9 | 2026-05-05 | On time |
| 260400130 | 2026-04-10 | PERSEDIAAN UMUM | 6030.289 | BESI ST40 D 30MM X 6000MM | 260400385 | 560,000 | 260400385 | 2026-04-21 | 2026-05-02 | 3 | 560,000 | 11 | 260500242 | 2026-05-08 | 17 | 2026-05-09 | On time |
| 260400130 | 2026-04-10 | PERSEDIAAN UMUM | 6030.2839 | BESI ST40 D 40MM X 6000MM | 260400385 | 945,000 | 260400385 | 2026-04-21 | 2026-05-02 | 3 | 945,000 | 11 | 260500242 | 2026-05-08 | 17 | 2026-05-09 | On time |
| 260400153 | 2026-04-13 | SPAREPART | 5021.0047 | V. BELT A - 67 | 260400384 | 36,200 | 260400384 | 2026-04-21 | 2026-05-02 | 14 | 36,200 | 8 | 260400985 | 2026-04-27 | 6 | 2026-05-09 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400377 | 2026-04-21 | 2026-04-30 | 1,000 | 47,000 | 7 | 260401010 | 2026-04-28 | 7 | 2026-05-07 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400377 | 2026-04-21 | 2026-04-30 | 1,000 | 47,000 | 7 | 260400853 | 2026-04-23 | 2 | 2026-05-07 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260400379 | 2026-04-21 | 2026-05-04 | 1,000 | 53,000 | 7 | – | – | – | 2026-05-11 | Overdue |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400377 | 2026-04-21 | 2026-04-30 | 1,000 | 47,000 | 7 | 260500180 | 2026-05-07 | 16 | 2026-05-07 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400377 | 2026-04-21 | 2026-04-30 | 1,000 | 47,000 | 7 | 260401164 | 2026-04-30 | 9 | 2026-05-07 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400377 | 2026-04-21 | 2026-04-30 | 1,000 | 47,000 | 7 | 260500091 | 2026-05-05 | 14 | 2026-05-07 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400377 | 2026-04-21 | 2026-04-30 | 1,000 | 47,000 | 7 | 260400970 | 2026-04-27 | 6 | 2026-05-07 | On time |
| 260400183 | 2026-04-15 | SPAREPART | 5013.0002 | SELANG ANGIN PU 6,5 x 10 mm | 260600230 | 9,500 | 260400390 | 2026-04-21 | 2026-05-04 | 200 | 10,260 | 6 | 260400879 | 2026-04-23 | 2 | 2026-05-11 | On time |
| 260400199 | 2026-04-15 | SPAREPART | 5011.0572 | BEARING CT 52 A-1 | 260400388 | 116,200 | 260400388 | 2026-04-21 | 2026-05-05 | 3 | 116,200 | 6 | 260401108 | 2026-04-29 | 8 | 2026-05-12 | On time |
| 260400201 | 2026-04-15 | PERSEDIAAN UMUM | 6050.1745 | KUNCI SHOCK 50MM | 260400387 | 190,000 | 260400387 | 2026-04-21 | 2026-05-02 | 1 | 190,000 | 6 | 260500240 | 2026-05-08 | 17 | 2026-05-09 | On time |
| 260400201 | 2026-04-15 | PERSEDIAAN UMUM | 6050.0915 | KUNCI RING PASS 14 MM | 260610131 | 22,236 | 260400387 | 2026-04-21 | 2026-05-02 | 1 | 26,500 | 6 | 260400921 | 2026-04-24 | 3 | 2026-05-09 | On time |
| 260400232 | 2026-04-16 | PERSEDIAAN UMUM | 6030.2919 | AS DRAT STAINLESS M 18X1000 MM | 260400383 | 212,500 | 260400383 | 2026-04-21 | 2026-04-21 | 8 | 212,500 | 5 | 260400834 | 2026-04-22 | 1 | 2026-04-28 | On time |
| 260400236 | 2026-04-16 | BAHAN PACKING | 3011.0043 | BOX KOBIN T.S KW 1 30X30 | 260400400 | 1,177 | 260400361 | 2026-04-21 | 2026-04-27 | 20,000 | 1,320 | 5 | 260400975 | 2026-04-27 | 6 | 2026-05-04 | On time |
| 260400244 | 2026-04-17 | SPAREPART | 5017.034 | MOTOR PROTECTION SCHNEIDER TYPE GV2ME10 | 260500288 | 545,000 | 260400392 | 2026-04-21 | 2026-05-04 | 10 | 490,000 | 4 | 260401096 | 2026-04-29 | 8 | 2026-05-11 | On time |
| 260400244 | 2026-04-17 | SPAREPART | 5017.034 | MOTOR PROTECTION SCHNEIDER TYPE GV2ME10 | 260500288 | 545,000 | 260400392 | 2026-04-21 | 2026-05-04 | 10 | 490,000 | 4 | 260500053 | 2026-05-04 | 13 | 2026-05-11 | On time |
| 260400250 | 2026-04-17 | SPAREPART | 5012.0247 | SEAL TC 32.52.8 | 260400372 | 7,000 | 260400372 | 2026-04-21 | 2026-05-05 | 10 | 7,000 | 4 | 260401107 | 2026-04-29 | 8 | 2026-05-12 | On time |
| 260400250 | 2026-04-17 | SPAREPART | 5012.0246 | SEAL TC 22.40.7 | 260400372 | 5,000 | 260400372 | 2026-04-21 | 2026-05-05 | 10 | 5,000 | 4 | 260401107 | 2026-04-29 | 8 | 2026-05-12 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500266 | 2026-05-09 | 18 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500213 | 2026-05-08 | 17 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500082 | 2026-05-05 | 14 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500317 | 2026-05-11 | 20 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500117 | 2026-05-06 | 15 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500318 | 2026-05-11 | 20 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500576 | 2026-05-19 | 28 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500573 | 2026-05-19 | 28 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500466 | 2026-05-15 | 24 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500215 | 2026-05-08 | 17 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500166 | 2026-05-07 | 16 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500529 | 2026-05-18 | 27 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500530 | 2026-05-18 | 27 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500261 | 2026-05-09 | 18 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500081 | 2026-05-05 | 14 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500531 | 2026-05-18 | 27 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500120 | 2026-05-06 | 15 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500262 | 2026-05-09 | 18 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500319 | 2026-05-11 | 20 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500465 | 2026-05-15 | 24 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500211 | 2026-05-08 | 17 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500411 | 2026-05-13 | 22 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500355 | 2026-05-12 | 21 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500532 | 2026-05-18 | 27 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500165 | 2026-05-07 | 16 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500164 | 2026-05-07 | 16 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500167 | 2026-05-07 | 16 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500574 | 2026-05-19 | 28 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500409 | 2026-05-13 | 22 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500356 | 2026-05-12 | 21 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500354 | 2026-05-12 | 21 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500506 | 2026-05-16 | 25 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500504 | 2026-05-16 | 25 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500503 | 2026-05-16 | 25 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500408 | 2026-05-13 | 22 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500575 | 2026-05-19 | 28 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500316 | 2026-05-11 | 20 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500505 | 2026-05-16 | 25 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500119 | 2026-05-06 | 15 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500118 | 2026-05-06 | 15 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500463 | 2026-05-15 | 24 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500263 | 2026-05-09 | 18 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500464 | 2026-05-15 | 24 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500264 | 2026-05-09 | 18 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500353 | 2026-05-12 | 21 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500209 | 2026-05-08 | 17 | 2026-05-09 | On time |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500410 | 2026-05-13 | 22 | 2026-05-09 | Late |
| 260400270 | 2026-04-17 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260400380 | 2026-04-21 | 2026-05-02 | 1,710,000 | 1,645 | 4 | 260500265 | 2026-05-09 | 18 | 2026-05-09 | On time |
| 260400293 | 2026-04-20 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400382 | 2026-04-21 | 2026-05-04 | 1,000 | 74,000 | 1 | 260500790 | 2026-05-25 | 34 | 2026-05-11 | Late |
| 260400293 | 2026-04-20 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400382 | 2026-04-21 | 2026-05-04 | 1,000 | 74,000 | 1 | 260500541 | 2026-05-18 | 27 | 2026-05-11 | Late |
| 260400293 | 2026-04-20 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400382 | 2026-04-21 | 2026-05-04 | 1,000 | 74,000 | 1 | 260500584 | 2026-05-19 | 28 | 2026-05-11 | Late |
| 260400293 | 2026-04-20 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400382 | 2026-04-21 | 2026-05-04 | 1,000 | 74,000 | 1 | 260500875 | 2026-05-28 | 37 | 2026-05-11 | Late |
| 260400293 | 2026-04-20 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400382 | 2026-04-21 | 2026-05-04 | 1,000 | 74,000 | 1 | 260500728 | 2026-05-22 | 31 | 2026-05-11 | Late |
| 260400293 | 2026-04-20 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400382 | 2026-04-21 | 2026-05-04 | 1,000 | 74,000 | 1 | 260500422 | 2026-05-13 | 22 | 2026-05-11 | Late |
| 260400293 | 2026-04-20 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400382 | 2026-04-21 | 2026-05-04 | 1,000 | 74,000 | 1 | 260500471 | 2026-05-15 | 24 | 2026-05-11 | Late |
| 260410020 | 2026-04-08 | PERSEDIAAN UMUM | 6050.0405 | GERINDA TANGAN 4 INCH MAKITA M0900B | 260410119 | 337,837.84 | 260410119 | 2026-04-21 | 2026-04-21 | 2 | 337,837.84 | 13 | 260410433 | 2026-04-22 | 1 | 2026-04-28 | On time |
| 260410020 | 2026-04-08 | PERSEDIAAN UMUM | 6030.2884 | GERINDA TANGAN GA 7020 7INCH 2200W | 260410119 | 2,162,162.17 | 260410119 | 2026-04-21 | 2026-04-21 | 1 | 2,162,162.17 | 13 | 260410433 | 2026-04-22 | 1 | 2026-04-28 | On time |
| 260410020 | 2026-04-08 | PERSEDIAAN UMUM | 6050.1715 | CUTTING WHEEL 7 INC | 260410120 | 9,909.91 | 260410120 | 2026-04-21 | 2026-04-21 | 60 | 9,909.91 | 13 | 260410434 | 2026-04-22 | 1 | 2026-04-28 | On time |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.2283 | BESI BETON POLOS U24 10MM SNI | 260610095 | 92,000 | 260410126 | 2026-04-21 | 2026-04-21 | 20 | 72,000 | 4 | 260410572 | 2026-04-30 | 9 | 2026-04-28 | Late |
| 260410051 | 2026-04-20 | BAHAN BAKU BODY | 1010.0044 | FELDSPAR LP-1 CRUSHER max KA 10% | 260410230 | 510 | 260410127 | 2026-04-21 | 2026-04-21 | 35,000 | 330 | 1 | 260410504 | 2026-04-27 | 6 | 2026-04-28 | On time |
| 260410051 | 2026-04-20 | BAHAN BAKU BODY | 1010.0045 | FELDSPAR LP-7 BATU max KA 10% | 260410230 | 470 | 260410127 | 2026-04-21 | 2026-04-21 | 35,000 | 310 | 1 | 260410503 | 2026-04-27 | 6 | 2026-04-28 | On time |
| 260410051 | 2026-04-20 | BAHAN BAKU BODY | 1010.0046 | FELDSPAR LP-L LAPUKAN max KA 10% | 260410127 | 300 | 260410127 | 2026-04-21 | 2026-04-21 | 35,000 | 300 | 1 | 260410505 | 2026-04-27 | 6 | 2026-04-28 | On time |
| 260410052 | 2026-04-20 | BAHAN BAKU GLAZE | 1020.0027 | ENGOBE GLAZE KSE04 | 260610052 | 8,399.05 | 260410123 | 2026-04-21 | 2026-04-21 | 54,000 | 7,945.52 | 1 | – | – | – | 2026-04-28 | Overdue |
| 260410052 | 2026-04-20 | BAHAN BAKU GLAZE | 1030.0086 | TOP GLAZE KSG06 | 260610052 | 11,314.1 | 260410123 | 2026-04-21 | 2026-04-21 | 63,000 | 10,703.16 | 1 | – | – | – | 2026-04-28 | Overdue |
| 260300407 | 2026-03-27 | PERSEDIAAN UMUM | 6030.2827 | SEKAT URINOIR | 260400343 | 950,000 | 260400343 | 2026-04-20 | 2026-04-20 | 1 | 950,000 | 24 | 260500602 | 2026-05-19 | 29 | 2026-04-27 | Late |
| 260310014 | 2026-03-05 | SPAREPART | 5011.0566 | BEARING 7311ACM | 260410121 | 119,420 | 260410121 | 2026-04-20 | 2026-04-28 | 30 | 119,420 | 46 | – | – | – | 2026-05-05 | Overdue |
| 260310014 | 2026-03-05 | SPAREPART | 5011.0567 | BEARING NJ311EM | 260410121 | 1,013,370 | 260410121 | 2026-04-20 | 2026-04-28 | 20 | 1,013,370 | 46 | – | – | – | 2026-05-05 | Overdue |
| 260310018 | 2026-03-07 | PERSEDIAAN UMUM | 6050.0737 | LPG 12KG ( REFILL ) | 260610118 | 230,000 | 260410113 | 2026-04-20 | 2026-04-29 | 1 | 205,000 | 44 | 260410442 | 2026-04-22 | 2 | 2026-05-06 | On time |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0817 | KABEL N2XSY 1Cx95MM | 260410111 | 314,811 | 260410111 | 2026-04-20 | 2026-04-20 | 369 | 314,811 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0819 | KABEL NYY 1Cx185MM | 260410111 | 424,662 | 260410111 | 2026-04-20 | 2026-04-20 | 14,631 | 424,662 | 23 | 260510421 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0827 | KABEL NYY 4Cx4MM | 260410111 | 48,701 | 260410111 | 2026-04-20 | 2026-04-20 | 1,373 | 48,701 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0818 | KABEL NYY 1Cx300MM | 260410111 | 696,123 | 260410111 | 2026-04-20 | 2026-04-20 | 35,465 | 696,123 | 23 | 260610364 | 2026-06-12 | 53 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0819 | KABEL NYY 1Cx185MM | 260410111 | 424,662 | 260410111 | 2026-04-20 | 2026-04-20 | 14,631 | 424,662 | 23 | 260510395 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0823 | KABEL NYY 4Cx35MM | 260410111 | 354,324 | 260410111 | 2026-04-20 | 2026-04-20 | 1,357 | 354,324 | 23 | 260510393 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0825 | KABEL NYY 4Cx10MM | 260410111 | 108,829 | 260410111 | 2026-04-20 | 2026-04-20 | 3,745 | 108,829 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0824 | KABEL NYY 4Cx16MM | 260410111 | 169,117 | 260410111 | 2026-04-20 | 2026-04-20 | 124 | 169,117 | 23 | 260510393 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0854 | KABEL NYY 4Cx50MM | 260410111 | 470,378 | 260410111 | 2026-04-20 | 2026-04-20 | 826 | 470,378 | 23 | 260510393 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0829 | KABEL NYY 4Cx1.5MM | 260410111 | 21,086 | 260410111 | 2026-04-20 | 2026-04-20 | 1,441 | 21,086 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0853 | KABEL NYY 4Cx70MM | 260410111 | 667,225 | 260410111 | 2026-04-20 | 2026-04-20 | 819 | 667,225 | 23 | 260510393 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0828 | KABEL NYY 4Cx2.5MM | 260410111 | 32,445 | 260410111 | 2026-04-20 | 2026-04-20 | 228 | 32,445 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.082 | KABEL NYY 1Cx95MM | 260410111 | 222,419 | 260410111 | 2026-04-20 | 2026-04-20 | 7,711 | 222,419 | 23 | 260610366 | 2026-06-12 | 53 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.082 | KABEL NYY 1Cx95MM | 260410111 | 222,419 | 260410111 | 2026-04-20 | 2026-04-20 | 7,711 | 222,419 | 23 | 260510392 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0831 | KABEL NYYHY 4Cx10MM | 260410111 | 118,811 | 260410111 | 2026-04-20 | 2026-04-20 | 600 | 118,811 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.083 | KABEL NYY 3Cx2.5MM | 260410111 | 24,350 | 260410111 | 2026-04-20 | 2026-04-20 | 30,400 | 24,350 | 23 | 260510392 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.082 | KABEL NYY 1Cx95MM | 260410111 | 222,419 | 260410111 | 2026-04-20 | 2026-04-20 | 7,711 | 222,419 | 23 | 260610363 | 2026-06-12 | 53 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0819 | KABEL NYY 1Cx185MM | 260410111 | 424,662 | 260410111 | 2026-04-20 | 2026-04-20 | 14,631 | 424,662 | 23 | 260510392 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0818 | KABEL NYY 1Cx300MM | 260410111 | 696,123 | 260410111 | 2026-04-20 | 2026-04-20 | 35,465 | 696,123 | 23 | 260510421 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0818 | KABEL NYY 1Cx300MM | 260410111 | 696,123 | 260410111 | 2026-04-20 | 2026-04-20 | 35,465 | 696,123 | 23 | 260510395 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0852 | KABEL NYY 1Cx25MM | 260410111 | 62,989 | 260410111 | 2026-04-20 | 2026-04-20 | 520 | 62,989 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0822 | KABEL NYY 1Cx50MM | 260410111 | 113,284 | 260410111 | 2026-04-20 | 2026-04-20 | 1,122 | 113,284 | 23 | 260510392 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0654 | KABEL NYYHY 4X35 MM | 260410111 | 408,357 | 260410111 | 2026-04-20 | 2026-04-20 | 586 | 408,357 | 23 | – | – | – | 2026-04-27 | Overdue |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0858 | KABEL NYYHY 4X10 MM | 260410111 | 118,811 | 260410111 | 2026-04-20 | 2026-04-20 | 589 | 118,811 | 23 | 260510393 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0855 | KABEL NYMHY 1Cx120MM | 260410111 | 321,360 | 260410111 | 2026-04-20 | 2026-04-20 | 303 | 321,360 | 23 | 260510392 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.083 | KABEL NYY 3Cx2.5MM | 260410111 | 24,350 | 260410111 | 2026-04-20 | 2026-04-20 | 30,400 | 24,350 | 23 | 260510393 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0856 | KABEL NYMHY 1Cx70MM | 260410111 | 186,259 | 260410111 | 2026-04-20 | 2026-04-20 | 101 | 186,259 | 23 | 260510392 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0818 | KABEL NYY 1Cx300MM | 260410111 | 696,123 | 260410111 | 2026-04-20 | 2026-04-20 | 35,465 | 696,123 | 23 | 260610367 | 2026-06-12 | 53 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0818 | KABEL NYY 1Cx300MM | 260410111 | 696,123 | 260410111 | 2026-04-20 | 2026-04-20 | 35,465 | 696,123 | 23 | 260510392 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0821 | KABEL NYY 1Cx70MM | 260410111 | 161,395 | 260410111 | 2026-04-20 | 2026-04-20 | 2,303 | 161,395 | 23 | 260510395 | 2026-05-16 | 26 | 2026-04-27 | Late |
| 260310051 | 2026-03-28 | PERSEDIAAN UMUM | 6020.0819 | KABEL NYY 1Cx185MM | 260410111 | 424,662 | 260410111 | 2026-04-20 | 2026-04-20 | 14,631 | 424,662 | 23 | 260610363 | 2026-06-12 | 53 | 2026-04-27 | Late |
| 260310054 | 2026-03-27 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260410108 | 2026-04-20 | 2026-04-20 | 100,000 | 1,700 | 24 | 260410449 | 2026-04-23 | 3 | 2026-04-27 | On time |
| 260310054 | 2026-03-27 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260410108 | 2026-04-20 | 2026-04-20 | 100,000 | 1,700 | 24 | 260410451 | 2026-04-23 | 3 | 2026-04-27 | On time |
| 260310054 | 2026-03-27 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260410108 | 2026-04-20 | 2026-04-20 | 100,000 | 1,700 | 24 | 260410462 | 2026-04-24 | 4 | 2026-04-27 | On time |
| 260400015 | 2026-04-01 | PERSEDIAAN UMUM | 6020.0836 | BOX PANEL 150X175X40 CM | 260400375 | 9,900,000 | 260400375 | 2026-04-20 | 2026-04-20 | 1 | 9,900,000 | 19 | 260500103 | 2026-05-05 | 15 | 2026-04-27 | Late |
| 260400037 | 2026-04-06 | PERSEDIAAN UMUM | 6030.2867 | ROLLING DOOR PERFORATED & CHAIN BLOCK DRIVE TINGGI=4.5M X LEBAR=5M | 260400329 | 36,265,000 | 260400329 | 2026-04-20 | 2026-05-15 | 2 | 36,265,000 | 14 | 260500591 | 2026-05-19 | 29 | 2026-05-22 | On time |
| 260400037 | 2026-04-06 | PERSEDIAAN UMUM | 6030.2866 | ROLLING DOOR PERFORATED & CHAIN BLOCK DRIVE TINGGI=4.5M X LEBAR=4.88M | 260400329 | 37,475,600 | 260400329 | 2026-04-20 | 2026-05-15 | 2 | 37,475,600 | 14 | 260500591 | 2026-05-19 | 29 | 2026-05-22 | On time |
| 260400053 | 2026-04-01 | BAHAN BAKU GLAZE | 1030.0085 | POTASSIUM FELDSPAR P1 | 260400376 | 2,578.35 | 260400376 | 2026-04-20 | 2026-06-20 | 27,000 | 2,578.35 | 19 | – | – | – | 2026-06-27 | Outstanding |
| 260400122 | 2026-04-11 | SPAREPART | 5021.0116 | V. BELT B - 230 | 260600226 | 193,600 | 260400374 | 2026-04-20 | 2026-04-20 | 23 | 217,000 | 9 | 260400755 | 2026-04-21 | 1 | 2026-04-27 | On time |
| 260400167 | 2026-04-14 | PERSEDIAAN UMUM | 6030.2555 | DOUBLE NEPEL 3/4 INCH | 260400337 | 19,000 | 260400337 | 2026-04-20 | 2026-04-20 | 20 | 19,000 | 6 | 260400720 | 2026-04-20 | – | 2026-04-27 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0201 | NFT00 40X40 KOBIN MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400328 | 2026-04-20 | 2026-04-27 | 37,800 | 363 | 5 | 260400976 | 2026-04-27 | 7 | 2026-05-04 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0222 | NFT00 40X40 PARIS MP2 KW-A 403X54 (BK150/125/125) | 260500474 | 357 | 260400328 | 2026-04-20 | 2026-04-27 | 44,100 | 363 | 5 | 260401078 | 2026-04-29 | 9 | 2026-05-04 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400328 | 2026-04-20 | 2026-04-27 | 63,000 | 363 | 5 | 260500352 | 2026-05-11 | 21 | 2026-05-04 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260400328 | 2026-04-20 | 2026-04-27 | 63,000 | 363 | 5 | 260400976 | 2026-04-27 | 7 | 2026-05-04 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.02 | NFT00 40X40 KOBIN MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400328 | 2026-04-20 | 2026-04-27 | 37,800 | 412 | 5 | 260400976 | 2026-04-27 | 7 | 2026-05-04 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400328 | 2026-04-20 | 2026-04-27 | 63,000 | 412 | 5 | 260500352 | 2026-05-11 | 21 | 2026-05-04 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260400328 | 2026-04-20 | 2026-04-27 | 63,000 | 412 | 5 | 260400976 | 2026-04-27 | 7 | 2026-05-04 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.022 | NFT00 40X40 JUPITER MP2 KW-B 403X54 (BK150/125/125) | 260400412 | 357 | 260400328 | 2026-04-20 | 2026-04-27 | 31,500 | 363 | 5 | 260500352 | 2026-05-11 | 21 | 2026-05-04 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0219 | NFT00 40X40 JUPITER MP1 KW-B 403X51 (BK150/125/125) | 260400412 | 409 | 260400328 | 2026-04-20 | 2026-04-27 | 31,500 | 412 | 5 | 260500352 | 2026-05-11 | 21 | 2026-05-04 | Late |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0215 | NFT00 40X40 KOBIN MP1 KW-B 403X51 (BK150/125/125) | 260500031 | 412 | 260400328 | 2026-04-20 | 2026-04-27 | 12,600 | 412 | 5 | 260401078 | 2026-04-29 | 9 | 2026-05-04 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0216 | NFT00 40X40 KOBIN MP2 KW-B 403X54 (BK150/125/125) | 260500031 | 363 | 260400328 | 2026-04-20 | 2026-04-27 | 12,600 | 363 | 5 | 260401078 | 2026-04-29 | 9 | 2026-05-04 | On time |
| 260400222 | 2026-04-15 | BAHAN PACKING | 3011.0221 | NFT00 40X40 PARIS MP1 KW-A 403X51 (BK150/125/125) | 260500474 | 409 | 260400328 | 2026-04-20 | 2026-04-27 | 44,100 | 412 | 5 | 260401078 | 2026-04-29 | 9 | 2026-05-04 | On time |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.0248 | NFT00 60X60 KOBIN MP1 KW-A 606X45 (WK150/150/150) | 260400330 | 748 | 260400330 | 2026-04-20 | 2026-05-11 | 84,000 | 748 | 5 | – | – | – | 2026-05-18 | Overdue |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.0249 | NFT00 60X60 KOBIN MP2 KW-A 606X48 (WK150/150/150) | 260400330 | 682 | 260400330 | 2026-04-20 | 2026-05-11 | 84,000 | 682 | 5 | – | – | – | 2026-05-18 | Overdue |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.025 | NFT00 60X60 KOBIN MP1 KW-B 606X45 (BK150/150/150) | 260400330 | 641 | 260400330 | 2026-04-20 | 2026-05-11 | 8,400 | 641 | 5 | 260500133 | 2026-05-06 | 16 | 2026-05-18 | On time |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.0256 | NFT00 60X60 PARIS MP1 KW-A 606X45 (WK150/150/150) | 260400330 | 748 | 260400330 | 2026-04-20 | 2026-05-11 | 8,400 | 748 | 5 | – | – | – | 2026-05-18 | Overdue |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.0257 | NFT00 60X60 PARIS MP2 KW-A 606X48 (WK150/150/150) | 260400330 | 682 | 260400330 | 2026-04-20 | 2026-05-11 | 8,400 | 682 | 5 | – | – | – | 2026-05-18 | Overdue |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.0251 | NFT00 60X60 KOBIN MP2 KW-B 606X48 (WK150/150/150) | 260400330 | 682 | 260400330 | 2026-04-20 | 2026-05-11 | 8,400 | 682 | 5 | 260500133 | 2026-05-06 | 16 | 2026-05-18 | On time |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.0258 | NFT00 60X60 PARIS MP1 KW-B 606X45 (BK150/150/150) | 260400330 | 641 | 260400330 | 2026-04-20 | 2026-05-11 | 8,400 | 641 | 5 | 260500133 | 2026-05-06 | 16 | 2026-05-18 | On time |
| 260400223 | 2026-04-15 | BAHAN PACKING | 3011.0259 | NFT00 60X60 PARIS MP2 KW-B 606X48 (WK150/150/150) | 260400330 | 682 | 260400330 | 2026-04-20 | 2026-05-11 | 8,400 | 682 | 5 | 260500133 | 2026-05-06 | 16 | 2026-05-18 | On time |
| 260400226 | 2026-04-15 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260400330 | 2026-04-20 | 2026-05-11 | 58,800 | 1,275 | 5 | 260500098 | 2026-05-05 | 15 | 2026-05-18 | On time |
| 260400226 | 2026-04-15 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260400330 | 2026-04-20 | 2026-05-11 | 58,800 | 1,275 | 5 | 260500007 | 2026-05-02 | 12 | 2026-05-18 | On time |
| 260400226 | 2026-04-15 | BAHAN PACKING | 3011.003 | BOX JUPITER MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260400330 | 2026-04-20 | 2026-05-11 | 42,000 | 1,275 | 5 | 260500133 | 2026-05-06 | 16 | 2026-05-18 | On time |
| 260400226 | 2026-04-15 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260400330 | 2026-04-20 | 2026-05-11 | 58,800 | 1,275 | 5 | 260500007 | 2026-05-02 | 12 | 2026-05-18 | On time |
| 260400226 | 2026-04-15 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260400330 | 2026-04-20 | 2026-05-11 | 58,800 | 1,275 | 5 | 260500098 | 2026-05-05 | 15 | 2026-05-18 | On time |
| 260400246 | 2026-04-17 | BAHAN BAKAR | 4030.001 | DAPHNE SUPER HYDRO 46 (IDEMITSU) | 260600224 | 62,250 | 260400349 | 2026-04-20 | 2026-04-29 | 400 | 41,500 | 3 | 260400917 | 2026-04-24 | 4 | 2026-05-06 | On time |
| 260400246 | 2026-04-17 | BAHAN BAKAR | 4050.0014 | SUPER GEAR OIL DAPHNE SUPER GEAR OIL 320 (IDEMITSU) | 260600094 | 70,750 | 260400349 | 2026-04-20 | 2026-04-29 | 20 | 48,750 | 3 | – | – | – | 2026-05-06 | Overdue |
| 260400255 | 2026-04-17 | PERSEDIAAN UMUM | 6010.0792 | LOGO PS MARK 40X40 15X4 CM | 260400378 | 85 | 260400378 | 2026-04-20 | 2026-04-24 | 20,000 | 85 | 3 | 260401152 | 2026-04-30 | 10 | 2026-05-01 | On time |
| 260400260 | 2026-04-17 | PERSEDIAAN UMUM | 6030.0051 | KAWAT BENDRAT | 260610017 | 17,640 | 260400350 | 2026-04-20 | 2026-04-27 | 1 | 22,000 | 3 | 260400754 | 2026-04-21 | 1 | 2026-05-04 | On time |
| 260400282 | 2026-04-20 | PERSEDIAAN UMUM | 6010.0856 | Besi Pengait Rak Display S Bawah | 260400345 | 17,000 | 260400345 | 2026-04-20 | 2026-04-27 | 165 | 17,000 | – | 260500232 | 2026-05-08 | 18 | 2026-05-04 | Late |
| 260400282 | 2026-04-20 | PERSEDIAAN UMUM | 6010.0857 | Besi Pengait Rak Display J Atas | 260400345 | 17,000 | 260400345 | 2026-04-20 | 2026-04-27 | 265 | 17,000 | – | 260500232 | 2026-05-08 | 18 | 2026-05-04 | Late |
| 260400282 | 2026-04-20 | PERSEDIAAN UMUM | 6010.0864 | PENGUNCI RAK BAWAH (PLAT BAJA) | 260400345 | 15,000 | 260400345 | 2026-04-20 | 2026-04-27 | 165 | 15,000 | – | 260500232 | 2026-05-08 | 18 | 2026-05-04 | Late |
| 260410031 | 2026-04-13 | PERSEDIAAN UMUM | 6050.1736 | SOKLIN LANTAI 25 ML | 260410167 | 10,289 | 260410112 | 2026-04-20 | 2026-04-29 | 6 | 400 | 7 | 260410440 | 2026-04-22 | 2 | 2026-05-06 | On time |
| 260410031 | 2026-04-13 | PERSEDIAAN UMUM | 6050.1735 | KOPI HITAM 23 GR | 260410112 | 1,700 | 260410112 | 2026-04-20 | 2026-04-29 | 4 | 1,700 | 7 | 260410440 | 2026-04-22 | 2 | 2026-05-06 | On time |
| 260410042 | 2026-04-16 | PERSEDIAAN UMUM | 6030.0961 | MATA BOR BESI 8 MM | 260600267 | 58,450 | 260410114 | 2026-04-20 | 2026-04-29 | 4 | 65,000 | 4 | 260410441 | 2026-04-22 | 2 | 2026-05-06 | On time |
| 260410042 | 2026-04-16 | PERSEDIAAN UMUM | 6050.0654 | KUNCI L 5MM | 260500383 | 8,800 | 260410114 | 2026-04-20 | 2026-04-29 | 2 | 22,000 | 4 | 260410441 | 2026-04-22 | 2 | 2026-05-06 | On time |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0245 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260410109 | 2026-04-20 | 2026-04-20 | 72,000 | 690 | 4 | 260510039 | 2026-05-04 | 14 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0246 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWB 605X40 (K150/125/125) | 260410177 | 645 | 260410110 | 2026-04-20 | 2026-04-20 | 12,000 | 645 | 4 | – | – | – | 2026-04-27 | Overdue |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0247 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWB 605X38 (K150/125/125) | 260410177 | 610 | 260410110 | 2026-04-20 | 2026-04-20 | 12,000 | 610 | 4 | – | – | – | 2026-04-27 | Overdue |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0244 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260410109 | 2026-04-20 | 2026-04-20 | 72,000 | 735 | 4 | – | – | – | 2026-04-27 | Overdue |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0247 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWB 605X38 (K150/125/125) | 260410177 | 610 | 260410109 | 2026-04-20 | 2026-04-20 | 12,000 | 565 | 4 | 260510063 | 2026-05-06 | 16 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0246 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWB 605X40 (K150/125/125) | 260410177 | 645 | 260410109 | 2026-04-20 | 2026-04-20 | 12,000 | 640 | 4 | – | – | – | 2026-04-27 | Overdue |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0245 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260410110 | 2026-04-20 | 2026-04-20 | 128,000 | 659 | 4 | 260510186 | 2026-05-11 | 21 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0245 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260410110 | 2026-04-20 | 2026-04-20 | 128,000 | 659 | 4 | 260510176 | 2026-05-09 | 19 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0245 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260410109 | 2026-04-20 | 2026-04-20 | 72,000 | 690 | 4 | – | – | – | 2026-04-27 | Overdue |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0244 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260410110 | 2026-04-20 | 2026-04-20 | 128,000 | 696 | 4 | 260510186 | 2026-05-11 | 21 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0244 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260410110 | 2026-04-20 | 2026-04-20 | 128,000 | 696 | 4 | 260510176 | 2026-05-09 | 19 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0244 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260410109 | 2026-04-20 | 2026-04-20 | 72,000 | 735 | 4 | 260510039 | 2026-05-04 | 14 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0246 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWB 605X40 (K150/125/125) | 260410177 | 645 | 260410109 | 2026-04-20 | 2026-04-20 | 12,000 | 640 | 4 | 260510063 | 2026-05-06 | 16 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0244 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260410109 | 2026-04-20 | 2026-04-20 | 72,000 | 735 | 4 | 260510063 | 2026-05-06 | 16 | 2026-04-27 | Late |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0247 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWB 605X38 (K150/125/125) | 260410177 | 610 | 260410109 | 2026-04-20 | 2026-04-20 | 12,000 | 565 | 4 | – | – | – | 2026-04-27 | Overdue |
| 260410043 | 2026-04-16 | BAHAN PACKING | 3011.0245 | CARTON BOX SIDEWRAPS KAIO 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260410109 | 2026-04-20 | 2026-04-20 | 72,000 | 690 | 4 | 260510063 | 2026-05-06 | 16 | 2026-04-27 | Late |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6050.0737 | LPG 12KG ( REFILL ) | 260610118 | 230,000 | 260410113 | 2026-04-20 | 2026-04-29 | 2 | 205,000 | 3 | 260410442 | 2026-04-22 | 2 | 2026-05-06 | On time |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260510112 | 2026-05-07 | 17 | 2026-04-27 | Late |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260410365 | 2026-04-20 | – | 2026-04-27 | On time |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260410371 | 2026-04-20 | – | 2026-04-27 | On time |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260410368 | 2026-04-20 | – | 2026-04-27 | On time |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260410369 | 2026-04-20 | – | 2026-04-27 | On time |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260410366 | 2026-04-20 | – | 2026-04-27 | On time |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260410367 | 2026-04-20 | – | 2026-04-27 | On time |
| 260410047 | 2026-04-17 | BAHAN BAKU BODY | 1010.0039 | BENTONITE CBP | 260610144 | 385 | 260410107 | 2026-04-20 | 2026-04-20 | 237,260 | 385 | 3 | 260410370 | 2026-04-20 | – | 2026-04-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260600654 | 2026-06-17 | 60 | 2026-05-27 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260600261 | 2026-06-08 | 51 | 2026-05-27 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260600464 | 2026-06-12 | 55 | 2026-05-27 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500047 | 2026-05-04 | 16 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500873 | 2026-05-28 | 40 | 2026-05-27 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500667 | 2026-05-21 | 33 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500522 | 2026-05-16 | 28 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260600073 | 2026-06-03 | 46 | 2026-05-27 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500468 | 2026-05-15 | 27 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500797 | 2026-05-25 | 37 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500768 | 2026-05-23 | 35 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500178 | 2026-05-07 | 19 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260500425 | 2026-05-13 | 25 | 2026-05-27 | On time |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260400334 | 2026-04-18 | 2026-05-20 | 5,000 | 25,000 | 58 | 260600030 | 2026-06-02 | 45 | 2026-05-27 | Late |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400336 | 2026-04-18 | 2026-05-02 | 500 | 74,000 | 24 | 260500421 | 2026-05-13 | 25 | 2026-05-09 | Late |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400336 | 2026-04-18 | 2026-05-02 | 500 | 74,000 | 24 | 260500092 | 2026-05-05 | 17 | 2026-05-09 | On time |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400336 | 2026-04-18 | 2026-05-02 | 500 | 74,000 | 24 | 260500131 | 2026-05-06 | 18 | 2026-05-09 | On time |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400336 | 2026-04-18 | 2026-05-02 | 500 | 74,000 | 24 | 260500222 | 2026-05-08 | 20 | 2026-05-09 | On time |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400336 | 2026-04-18 | 2026-05-02 | 500 | 74,000 | 24 | – | – | – | 2026-05-09 | Overdue |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260400336 | 2026-04-18 | 2026-05-02 | 500 | 74,000 | 24 | 260500374 | 2026-05-12 | 24 | 2026-05-09 | Late |
| 260300407 | 2026-03-27 | PERSEDIAAN UMUM | 6030.2825 | LIST U ALUMINIUM 1X1 P=6M | 260500428 | 42,000 | 260400342 | 2026-04-18 | 2026-04-18 | 5 | 75,000 | 22 | – | – | – | 2026-04-25 | Overdue |
| 260400123 | 2026-04-10 | SPAREPART | 5017.0272 | LIMIT SWITCH OMRON (WLCA 12-2N-O) | 260400351 | 215,000 | 260400351 | 2026-04-18 | 2026-04-30 | 3 | 215,000 | 8 | 260400987 | 2026-04-27 | 9 | 2026-05-07 | On time |
| 260400163 | 2026-04-13 | SPAREPART | 5012.0118 | SEAL TC 45.62.9 | 260400353 | 9,000 | 260400353 | 2026-04-18 | 2026-04-28 | 15 | 9,000 | 5 | 260400821 | 2026-04-22 | 4 | 2026-05-05 | On time |
| 260400163 | 2026-04-13 | SPAREPART | 5012.01 | SEAL TC 35.62.7 | 260400530 | 9,000 | 260400353 | 2026-04-18 | 2026-04-28 | 15 | 9,000 | 5 | 260400821 | 2026-04-22 | 4 | 2026-05-05 | On time |
| 260400163 | 2026-04-13 | SPAREPART | 5012.0075 | SEAL TC 30.42.7 | 260400530 | 6,000 | 260400353 | 2026-04-18 | 2026-04-28 | 15 | 6,000 | 5 | 260400821 | 2026-04-22 | 4 | 2026-05-05 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400335 | 2026-04-18 | 2026-04-27 | 1,500 | 47,000 | 4 | 260600296 | 2026-06-09 | 52 | 2026-05-04 | Late |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400335 | 2026-04-18 | 2026-04-27 | 1,500 | 47,000 | 4 | 260400790 | 2026-04-22 | 4 | 2026-05-04 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400335 | 2026-04-18 | 2026-04-27 | 1,500 | 47,000 | 4 | 260401011 | 2026-04-28 | 10 | 2026-05-04 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400335 | 2026-04-18 | 2026-04-27 | 1,500 | 47,000 | 4 | 260400945 | 2026-04-25 | 7 | 2026-05-04 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400335 | 2026-04-18 | 2026-04-27 | 1,500 | 47,000 | 4 | 260400905 | 2026-04-24 | 6 | 2026-05-04 | On time |
| 260400178 | 2026-04-14 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260400335 | 2026-04-18 | 2026-04-27 | 1,500 | 47,000 | 4 | 260400850 | 2026-04-23 | 5 | 2026-05-04 | On time |
| 260400182 | 2026-04-15 | PERSEDIAAN UMUM | 6050.174 | GELAS UKUR PLASTIK 5000ML ( 5 LITER ) | 260400371 | 74,100 | 260400371 | 2026-04-18 | 2026-04-27 | 2 | 74,100 | 3 | 260400799 | 2026-04-22 | 4 | 2026-05-04 | On time |
| 260400185 | 2026-04-15 | PERSEDIAAN UMUM | 6050.0995 | SEPATU BOOTS SIZE 42 | 260400358 | 160,000 | 260400358 | 2026-04-18 | 2026-04-28 | 1 | 160,000 | 3 | 260400986 | 2026-04-27 | 9 | 2026-05-05 | On time |
| 260400185 | 2026-04-15 | PERSEDIAAN UMUM | 6050.0994 | SEPATU BOOTS SIZE 41 | 260400358 | 160,000 | 260400358 | 2026-04-18 | 2026-04-28 | 1 | 160,000 | 3 | 260400986 | 2026-04-27 | 9 | 2026-05-05 | On time |
| 260400195 | 2026-04-15 | SPAREPART | 5030.1839 | AUTONIC TEMPERATURE CONTROL TC4S-14R | 260400368 | 545,000 | 260400368 | 2026-04-18 | 2026-04-30 | 1 | 545,000 | 3 | – | – | – | 2026-05-07 | Overdue |
| 260400196 | 2026-04-15 | SPAREPART | 5019.0327 | GEAR REDUCER MNRV 050 RATIO 1:10 FLANGE 0.37KW B5 OUTPUT SHAFT 24MM | 260400357 | 3,062,500 | 260400357 | 2026-04-18 | 2026-05-02 | 1 | 3,062,500 | 3 | 260401086 | 2026-04-29 | 11 | 2026-05-09 | On time |
| 260400196 | 2026-04-15 | SPAREPART | 5019.0017 | GEAR REDUCER MNRV 050 RATIO 1:20 FLANGE 0.37KW B5 OUTPUT SHAFT 24MM | 260400357 | 3,062,500 | 260400357 | 2026-04-18 | 2026-05-02 | 1 | 3,062,500 | 3 | 260401086 | 2026-04-29 | 11 | 2026-05-09 | On time |
| 260400196 | 2026-04-15 | SPAREPART | 5019.0368 | GEAR REDUCER MNRV 050 RATIO 1:100 FLANGE 0.37KW B5 OUTPUT SHAFT 24MM | 260400357 | 3,062,500 | 260400357 | 2026-04-18 | 2026-05-02 | 1 | 3,062,500 | 3 | 260401086 | 2026-04-29 | 11 | 2026-05-09 | On time |
| 260400198 | 2026-04-15 | SPAREPART | 5032.0903 | OIL FILTER C-1153 | 260400348 | 59,500 | 260400348 | 2026-04-18 | 2026-04-30 | 7 | 59,500 | 3 | 260400874 | 2026-04-23 | 5 | 2026-05-07 | On time |
| 260400198 | 2026-04-15 | SPAREPART | 5032.1022 | FILTER FC 1707 | 260400348 | 88,300 | 260400348 | 2026-04-18 | 2026-04-30 | 7 | 88,300 | 3 | 260400874 | 2026-04-23 | 5 | 2026-05-07 | On time |
| 260400202 | 2026-04-15 | PERSEDIAAN UMUM | 6050.0568 | ACCU KERING 105 D 31 R/L | 260500333 | 2,350,000 | 260400354 | 2026-04-18 | 2026-04-29 | 2 | 2,350,000 | 3 | 260400827 | 2026-04-22 | 4 | 2026-05-06 | On time |
| 260400210 | 2026-04-15 | SPAREPART | 5030.1368 | REGULATOR ANGIN AR 2000 | 260400352 | 135,000 | 260400352 | 2026-04-18 | 2026-05-04 | 3 | 135,000 | 3 | 260400990 | 2026-04-27 | 9 | 2026-05-11 | On time |
| 260400217 | 2026-04-15 | SPAREPART | 5017.0448 | FAN PANEL 12X12 CM 24 VDC | 260400369 | 80,000 | 260400369 | 2026-04-18 | 2026-04-30 | 5 | 80,000 | 3 | 260401183 | 2026-04-30 | 12 | 2026-05-07 | On time |
| 260400230 | 2026-04-16 | PERSEDIAAN UMUM | 6050.1303 | REGULATOR ANGIN YAMATO | 260400341 | 157,657.66 | 260400341 | 2026-04-18 | 2026-04-18 | 10 | 157,657.66 | 2 | 260400829 | 2026-04-22 | 4 | 2026-04-25 | On time |
| 260400262 | 2026-04-17 | PERSEDIAAN UMUM | 6050.175 | STICKER FOTO DOFF A4 @100LEMBAR | 260600108 | 75,000 | 260400370 | 2026-04-18 | 2026-04-25 | 6 | 62,713.33 | 1 | 260400802 | 2026-04-22 | 4 | 2026-05-02 | On time |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6030.0613 | METERAN 5 MTR | 260510156 | 9,363 | 260410105 | 2026-04-18 | 2026-04-18 | 10 | 18,670 | 1 | 260410405 | 2026-04-21 | 3 | 2026-04-25 | On time |
| 260410045 | 2026-04-17 | PERSEDIAAN UMUM | 6050.0687 | OXYGEN /O2 (Refill, Capacity 6 m3/ 40L/ Pressure 150 bar industrial Grade Purity 99,6%) | 260610110 | 63,000 | 260410104 | 2026-04-18 | 2026-04-18 | 10 | 63,000 | 1 | 260410407 | 2026-04-21 | 3 | 2026-04-25 | On time |
| 260300082 | 2026-03-07 | SPAREPART | 5030.1808 | INVERTER YEC.CIPR-GA50X4004ABBA | 260400310 | 228 | 260400310 | 2026-04-17 | 2026-05-30 | 1 | 228 | 41 | – | – | – | 2026-06-06 | Overdue |
| 260300083 | 2026-03-07 | SPAREPART | 5030.1809 | INVERTER YEC.CIPR-GA50X4005ABBA | 260400310 | 242 | 260400310 | 2026-04-17 | 2026-05-30 | 1 | 242 | 41 | – | – | – | 2026-06-06 | Overdue |
| 260310003 | 2026-03-03 | SPAREPART | 5019.0365 | MOTOR 18.5KW, MODEL YE3-180M-4 | 260410116 | 510 | 260410116 | 2026-04-17 | 2026-04-17 | 2 | 510 | 45 | – | – | – | 2026-04-24 | Overdue |
| 260310003 | 2026-03-03 | SPAREPART | 5019.0362 | MOTOR 55KW, MODEL YE3-280M-6 | 260410116 | 1,460 | 260410116 | 2026-04-17 | 2026-04-17 | 1 | 1,460 | 45 | – | – | – | 2026-04-24 | Overdue |
| 260310003 | 2026-03-03 | SPAREPART | 5019.0364 | MOTOR 110KW, MODEL YE3-315L1-6 | 260410116 | 3,130 | 260410116 | 2026-04-17 | 2026-04-17 | 1 | 3,130 | 45 | – | – | – | 2026-04-24 | Overdue |
| 260310003 | 2026-03-03 | SPAREPART | 5019.0363 | MOTOR 132KW, MODEL YE3-315M-4 | 260410116 | 4,780 | 260410116 | 2026-04-17 | 2026-04-17 | 1 | 4,780 | 45 | – | – | – | 2026-04-24 | Overdue |
| 260310014 | 2026-03-05 | SPAREPART | 5019.0366 | LIGHT HORIZONTAL MULTISTAGE CENTRIFUGAL PUMP WITH MOTOR, PUMP MODEL CHL8_50LSWSC, MOTOR 2.2KW MODEL YE3_90L_2 | 260410115 | 300 | 260410115 | 2026-04-17 | 2026-04-17 | 2 | 300 | 43 | – | – | – | 2026-04-24 | Overdue |
| 260310014 | 2026-03-05 | SPAREPART | 5019.0367 | LIGHT HORIZONTAL MULTISTAGE CENTRIFUGAL PUMP WITH MOTOR, PUMP MODEL CHLF4_60LSWSC, MOTOR 1.1KW MODEL YE3-80M2_2 | 260410115 | 385 | 260410115 | 2026-04-17 | 2026-04-17 | 2 | 385 | 43 | – | – | – | 2026-04-24 | Overdue |
| 260310046 | 2026-03-26 | PERSEDIAAN UMUM | 6050.0687 | OXYGEN /O2 (Refill, Capacity 6 m3/ 40L/ Pressure 150 bar industrial Grade Purity 99,6%) | 260610110 | 63,000 | 260410103 | 2026-04-17 | 2026-04-28 | 5 | 63,000 | 22 | 260410406 | 2026-04-21 | 4 | 2026-05-05 | On time |
| 260400068 | 2026-04-07 | PERSEDIAAN UMUM | 6050.1187 | SEAL KARET UTOCLAVE | 260400359 | 35,000 | 260400359 | 2026-04-17 | 2026-04-29 | 20 | 35,000 | 10 | 260400801 | 2026-04-22 | 5 | 2026-05-06 | On time |
| 260400108 | 2026-04-09 | PERSEDIAAN UMUM | 6030.2886 | FITTING 3/4 INCH KE TUBING 12MM | 260400332 | 45,600 | 260400332 | 2026-04-17 | 2026-04-23 | 50 | 45,600 | 8 | 260400830 | 2026-04-22 | 5 | 2026-04-30 | On time |
| 260400110 | 2026-04-09 | SPAREPART | 5029.0402 | CERAMIC FIBER BLANKET DENSITY 128 KG/M3 TEMP 1260C SIZE 0,6M X 7,2M THK = 25MM | 260500289 | 475,000 | 260400314 | 2026-04-17 | 2026-04-17 | 50 | 440,000 | 8 | 260400704 | 2026-04-20 | 3 | 2026-04-24 | On time |
| 260400123 | 2026-04-10 | SPAREPART | 5017.0515 | SICK GRTE18-N2442 | 260500010 | 955,000 | 260400362 | 2026-04-17 | 2026-04-28 | 15 | 955,000 | 7 | 260600600 | 2026-06-15 | 59 | 2026-05-05 | Late |
| 260400123 | 2026-04-10 | SPAREPART | 5017.0515 | SICK GRTE18-N2442 | 260500010 | 955,000 | 260400362 | 2026-04-17 | 2026-04-28 | 15 | 955,000 | 7 | 260500129 | 2026-05-06 | 19 | 2026-05-05 | Late |
| 260400123 | 2026-04-10 | SPAREPART | 5017.0515 | SICK GRTE18-N2442 | 260500010 | 955,000 | 260400362 | 2026-04-17 | 2026-04-28 | 15 | 955,000 | 7 | – | – | – | 2026-05-05 | Overdue |
| 260400138 | 2026-04-11 | PERSEDIAAN UMUM | 6020.0145 | KABEL NYYHY 4X6 MM() | 260400325 | 73,243.24 | 260400325 | 2026-04-17 | 2026-04-17 | 150 | 73,243.24 | 6 | 260400926 | 2026-04-24 | 7 | 2026-04-24 | On time |
| 260400147 | 2026-04-13 | SPAREPART | 5028.0135 | PULLY C1-9 KONDE AS 30 MM (BORG M-10) | 260400364 | 295,000 | 260400364 | 2026-04-17 | 2026-04-30 | 10 | 295,000 | 4 | 260500150 | 2026-05-06 | 19 | 2026-05-07 | On time |
| 260400164 | 2026-04-14 | PERSEDIAAN UMUM | 6060.0037 | BAUT L M 5*120 | 260400339 | 6,886 | 260400339 | 2026-04-17 | 2026-04-17 | 8 | 6,886 | 3 | 260500148 | 2026-05-06 | 19 | 2026-04-24 | Late |
| 260400165 | 2026-04-14 | PERSEDIAAN UMUM | 6030.187 | BESI HOLLOW 40X60X2MMX6M | 260400315 | 235,135.14 | 260400315 | 2026-04-17 | 2026-04-17 | 15 | 235,135.14 | 3 | 260400876 | 2026-04-23 | 6 | 2026-04-24 | On time |
| 260400165 | 2026-04-14 | PERSEDIAAN UMUM | 6030.2907 | DR SONNE SOLID SHEET FLAT ST 3 MM, L = 1220 MM P = 13600 MM CLEAR | 260400323 | 5,452,252.25 | 260400323 | 2026-04-17 | 2026-04-17 | 1 | 5,452,252.25 | 3 | 260400701 | 2026-04-20 | 3 | 2026-04-24 | On time |
| 260400165 | 2026-04-14 | PERSEDIAAN UMUM | 6030.2906 | DR SONNE SOLID SHEET FLAT ST 3 MM, L = 1220 MM P = 10200 MM GREY | 260400323 | 4,089,189.19 | 260400323 | 2026-04-17 | 2026-04-17 | 1 | 4,089,189.19 | 3 | 260400701 | 2026-04-20 | 3 | 2026-04-24 | On time |
| 260400166 | 2026-04-14 | PERSEDIAAN UMUM | 6030.0643 | SELANG AIR 3/4 INCH | 260400331 | 11,500 | 260400331 | 2026-04-17 | 2026-04-17 | 50 | 11,500 | 3 | 260400825 | 2026-04-22 | 5 | 2026-04-24 | On time |
| 260400167 | 2026-04-14 | PERSEDIAAN UMUM | 6030.291 | FITTING PNEUMATIC DRAT 3/4 KE 10 MM | 260400332 | 42,600 | 260400332 | 2026-04-17 | 2026-04-23 | 25 | 42,600 | 3 | 260400830 | 2026-04-22 | 5 | 2026-04-30 | On time |
| 260400167 | 2026-04-14 | PERSEDIAAN UMUM | 6030.1307 | PIPA 1 INCH X 6000 MM ( GALVANISH ) | 260400315 | 299,729.73 | 260400315 | 2026-04-17 | 2026-04-17 | 50 | 299,729.73 | 3 | 260400703 | 2026-04-20 | 3 | 2026-04-24 | On time |
| 260400175 | 2026-04-06 | PERSEDIAAN UMUM | 6020.0845 | EXHAUST FAN PANASONIC 25 CM | 260400324 | 347,000 | 260400324 | 2026-04-17 | 2026-04-17 | 2 | 347,000 | 11 | 260400828 | 2026-04-22 | 5 | 2026-04-24 | On time |
| 260400184 | 2026-04-15 | PERSEDIAAN UMUM | 6050.1317 | GELAS UKUR PLASTIK 2000 ML ( 2 LITER ) | 260400373 | 47,800 | 260400373 | 2026-04-17 | 2026-04-22 | 2 | 47,800 | 2 | 260400800 | 2026-04-22 | 5 | 2026-04-29 | On time |
| 260400200 | 2026-04-15 | SPAREPART | 5011.0197 | BEARING FCB - 25 | 260400386 | 129,950 | 260400338 | 2026-04-17 | 2026-05-15 | 15 | 180,000 | 2 | 260600384 | 2026-06-10 | 54 | 2026-05-22 | Late |
| 260400200 | 2026-04-15 | SPAREPART | 5011.0197 | BEARING FCB - 25 | 260400386 | 129,950 | 260400338 | 2026-04-17 | 2026-05-15 | 15 | 180,000 | 2 | 260500198 | 2026-05-07 | 20 | 2026-05-22 | On time |
| 260400203 | 2026-04-15 | PERSEDIAAN UMUM | 6050.0156 | BATERAY 65D 26R NS70 | 260400367 | 1,224,000 | 260400367 | 2026-04-17 | 2026-04-30 | 2 | 1,224,000 | 2 | 260400873 | 2026-04-23 | 6 | 2026-05-07 | On time |
| 260400208 | 2026-04-15 | SPAREPART | 5011.0279 | BEARING UCP 206 | 260400546 | 120,300 | 260400356 | 2026-04-17 | 2026-04-30 | 6 | 127,000 | 2 | 260400809 | 2026-04-22 | 5 | 2026-05-07 | On time |
| 260400215 | 2026-04-15 | PERSEDIAAN UMUM | 6030.2918 | SOCK GALVANIS DRAT DALAM 1/2 INCH | 260400346 | 17,500 | 260400346 | 2026-04-17 | 2026-04-25 | 6 | 17,500 | 2 | 260400752 | 2026-04-21 | 4 | 2026-05-02 | On time |
| 260400215 | 2026-04-15 | PERSEDIAAN UMUM | 6030.0401 | ENGSEL 4 INCH | 260400363 | 17,500 | 260400363 | 2026-04-17 | 2026-04-24 | 2 | 17,500 | 2 | 260400804 | 2026-04-22 | 5 | 2026-05-01 | On time |
| 260400215 | 2026-04-15 | PERSEDIAAN UMUM | 6050.1746 | MATA BOR NACHI 2 MM | 260400346 | 20,000 | 260400346 | 2026-04-17 | 2026-04-25 | 3 | 20,000 | 2 | 260400752 | 2026-04-21 | 4 | 2026-05-02 | On time |
| 260400218 | 2026-04-15 | SPAREPART | 5017.014 | PUSH BOTTON TELE XB2 BA31 | 260500150 | 54,940 | 260400366 | 2026-04-17 | 2026-04-25 | 12 | 51,940 | 2 | – | – | – | 2026-05-02 | Overdue |
| 260400219 | 2026-04-15 | SPAREPART | 5011.003 | BEARING 30220 | 260600218 | 750,000 | 260400355 | 2026-04-17 | 2026-04-28 | 2 | 790,000 | 2 | 260400808 | 2026-04-22 | 5 | 2026-05-05 | On time |
| 260400219 | 2026-04-15 | SPAREPART | 5011.003 | BEARING 30220 | 260600218 | 750,000 | 260400355 | 2026-04-17 | 2026-04-28 | 2 | 790,000 | 2 | 260400810 | 2026-04-22 | 5 | 2026-05-05 | On time |
| 260400219 | 2026-04-15 | SPAREPART | 5011.0259 | BEARING UCF 205 | 260400355 | 90,000 | 260400355 | 2026-04-17 | 2026-04-28 | 8 | 90,000 | 2 | 260400808 | 2026-04-22 | 5 | 2026-05-05 | On time |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260400854 | 2026-04-23 | 6 | 2026-05-04 | On time |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260600070 | 2026-06-03 | 47 | 2026-05-04 | Late |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260500275 | 2026-05-09 | 22 | 2026-05-04 | Late |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260500386 | 2026-05-12 | 25 | 2026-05-04 | Late |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260401009 | 2026-04-28 | 11 | 2026-05-04 | On time |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260500845 | 2026-05-26 | 39 | 2026-05-04 | Late |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260500094 | 2026-05-05 | 18 | 2026-05-04 | Late |
| 260400224 | 2026-04-15 | BAHAN PEMBANTU | 2054.0003 | ANGLE BEAD 60X60XH35 MM | 260400327 | 24,000 | 260400327 | 2026-04-17 | 2026-04-27 | 5,000 | 24,000 | 2 | 260400943 | 2026-04-25 | 8 | 2026-05-04 | On time |
| 260400227 | 2026-04-17 | STATIONERY | 6010.0371 | POSTER | 260400304 | 2,150 | 260400304 | 2026-04-17 | 2026-04-18 | 1,750 | 2,150 | – | 260401155 | 2026-04-30 | 13 | 2026-04-25 | Late |
| 260400228 | 2026-04-16 | PERSEDIAAN UMUM | 6050.1747 | 3M ULTRAFIT EARPLUGS | 260600216 | 15,500 | 260400365 | 2026-04-17 | 2026-04-24 | 50 | 6,980 | 1 | 260400798 | 2026-04-22 | 5 | 2026-05-01 | On time |
| 260400231 | 2026-04-16 | SPAREPART | 5011.0259 | BEARING UCF 205 | 260400355 | 90,000 | 260400321 | 2026-04-17 | 2026-04-23 | 1 | 90,000 | 1 | 260400806 | 2026-04-22 | 5 | 2026-04-30 | On time |
| 260400232 | 2026-04-16 | PERSEDIAAN UMUM | 6030.0092 | TEE GALVANIS T 3/4 INCH | 260400322 | 20,000 | 260400322 | 2026-04-17 | 2026-04-17 | 20 | 20,000 | 1 | 260400619 | 2026-04-17 | – | 2026-04-24 | On time |
| 260400235 | 2026-04-17 | STATIONERY | 6010.037 | ROLL BANNER | 260400309 | 199,000 | 260400309 | 2026-04-17 | 2026-04-18 | 2 | 199,000 | – | 260401156 | 2026-04-30 | 13 | 2026-04-25 | Late |
| 260400240 | 2026-04-17 | PROMOSI | 6010.0891 | Papan Sample Kobin (UK 19x8 cm) | 260400326 | 4,400 | 260400326 | 2026-04-17 | 2026-04-24 | 1,000 | 4,400 | – | – | – | – | 2026-05-01 | Overdue |
| 260410020 | 2026-04-08 | PERSEDIAAN UMUM | 6020.079 | KIPAS MESIN LAS 24V DC 0,30А 4500RPM ORIGINAL 9 x 9 CM FAN HIGH SPEED | 260410102 | 50,500 | 260410102 | 2026-04-17 | 2026-04-17 | 2 | 50,500 | 9 | 260410404 | 2026-04-21 | 4 | 2026-04-24 | On time |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | 260610481 | 2026-06-17 | 61 | 2026-04-24 | Late |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | 260610426 | 2026-06-15 | 59 | 2026-04-24 | Late |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | 260510522 | 2026-05-19 | 32 | 2026-04-24 | Late |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | 260610477 | 2026-06-17 | 61 | 2026-04-24 | Late |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | – | – | – | 2026-04-24 | Overdue |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | 260510430 | 2026-05-18 | 31 | 2026-04-24 | Late |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | – | – | – | 2026-04-24 | Overdue |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | 260510434 | 2026-05-18 | 31 | 2026-04-24 | Late |
| 260410038 | 2026-04-15 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260410101 | 2026-04-17 | 2026-04-17 | 5,000,000 | 845 | 2 | 260610478 | 2026-06-17 | 61 | 2026-04-24 | Late |
| 260110011 | 2026-01-06 | PERSEDIAAN UMUM | 6030.224 | ERGENE CAT TAHAN PANAS 600° WARNA SILVER @5LITER/KALENG | 260410097 | 1,635,000 | 260410096 | 2026-04-16 | 2026-04-16 | 40 | 1,635,000 | 100 | 260410556 | 2026-04-29 | 13 | 2026-04-23 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.224 | ERGENE CAT TAHAN PANAS 600° WARNA SILVER @5LITER/KALENG | 260410097 | 1,635,000 | 260410097 | 2026-04-16 | 2026-04-16 | 20 | 1,635,000 | 70 | 260410557 | 2026-04-29 | 13 | 2026-04-23 | Late |
| 260300217 | 2026-03-12 | SPAREPART | 5022.0363 | HELICAL GEAR Z73(MAT=SCM-415 HARDEN) | 260600091 | 800,000 | 260400360 | 2026-04-16 | 2026-05-15 | 1 | 800,000 | 35 | 260500391 | 2026-05-12 | 26 | 2026-05-22 | On time |
| 260300217 | 2026-03-12 | SPAREPART | 5022.041 | PINION GEAR Z9 (MAT=SCM-415 HARDEN) | 260600091 | 354,000 | 260400360 | 2026-04-16 | 2026-05-15 | 1 | 354,000 | 35 | 260500391 | 2026-05-12 | 26 | 2026-05-22 | On time |
| 260300217 | 2026-03-12 | SPAREPART | 5029.0371 | HELICAL GEAR Z25 (MAT=SCM-415 HARDEN) | 260600091 | 363,000 | 260400360 | 2026-04-16 | 2026-05-15 | 1 | 363,000 | 35 | 260500391 | 2026-05-12 | 26 | 2026-05-22 | On time |
| 260300217 | 2026-03-12 | SPAREPART | 5022.0364 | HELICAL GEAR Z63 (MAT=SCM-415 HARDEN) | 260600091 | 827,000 | 260400360 | 2026-04-16 | 2026-05-15 | 1 | 827,000 | 35 | 260500391 | 2026-05-12 | 26 | 2026-05-22 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.1299 | PENDORONG AIR | 260400316 | 40,000 | 260400316 | 2026-04-16 | 2026-04-27 | 3 | 40,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0062 | KANEBO | 260610080 | 12,000 | 260400316 | 2026-04-16 | 2026-04-27 | 1 | 20,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0041 | PEL SUMBU | 260610080 | 22,000 | 260400316 | 2026-04-16 | 2026-04-27 | 4 | 45,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0038 | SAPU LANTAI | 260500421 | 17,000 | 260400316 | 2026-04-16 | 2026-04-27 | 72 | 16,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0067 | SAPU LIDI TONGKAT | 260500475 | 11,000 | 260400316 | 2026-04-16 | 2026-04-27 | 33 | 10,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0046 | KEMOCENG | 260610094 | 10,000 | 260400316 | 2026-04-16 | 2026-04-27 | 12 | 20,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0072 | SAPU DORONG 90 CM | 260500421 | 113,000 | 260400316 | 2026-04-16 | 2026-04-27 | 44 | 106,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0078 | REFILL SAPU DORONG | 260500421 | 68,000 | 260400316 | 2026-04-16 | 2026-04-27 | 16 | 65,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0039 | SAPU LIDI | 260610080 | 12,000 | 260400316 | 2026-04-16 | 2026-04-27 | 15 | 5,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.1665 | LAP KAIN MICROFIBER | 260400316 | 20,000 | 260400316 | 2026-04-16 | 2026-04-27 | 3 | 20,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.1298 | KIT PEMBERSIH MOTOR | 260400316 | 20,000 | 260400316 | 2026-04-16 | 2026-04-27 | 2 | 20,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0053 | CIKRAK PLASTIK | 260500421 | 17,000 | 260400316 | 2026-04-16 | 2026-04-27 | 11 | 15,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0044 | SIKAT KAMAR MANDI ( GAGANG PANJANG ) | 260400316 | 40,000 | 260400316 | 2026-04-16 | 2026-04-27 | 3 | 40,000 | 24 | 260400657 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260300437 | 2026-03-30 | PERSEDIAAN UMUM | 6050.1676 | T&J Labels WARNA (FLUORESCENT) 123 | 260400320 | 7,533.34 | 260400320 | 2026-04-16 | 2026-04-23 | 1 | 7,533.34 | 17 | 260500756 | 2026-05-22 | 36 | 2026-04-30 | Late |
| 260300437 | 2026-03-30 | PERSEDIAAN UMUM | 6050.1676 | T&J Labels WARNA (FLUORESCENT) 123 | 260400320 | 7,533.34 | 260400320 | 2026-04-16 | 2026-04-23 | 1 | 7,533.34 | 17 | 260500756 | 2026-05-22 | 36 | 2026-04-30 | Late |
| 260300437 | 2026-03-30 | PERSEDIAAN UMUM | 6050.1676 | T&J Labels WARNA (FLUORESCENT) 123 | 260400320 | 7,533.34 | 260400320 | 2026-04-16 | 2026-04-23 | 1 | 7,533.34 | 17 | 260500756 | 2026-05-22 | 36 | 2026-04-30 | Late |
| 260310029 | 2026-03-11 | PERSEDIAAN UMUM | 6020.0458 | KABEL TIES 30CM X 4.6MM | 260410099 | 17,436.6 | 260410099 | 2026-04-16 | 2026-04-16 | 30 | 17,436.6 | 36 | 260510072 | 2026-05-06 | 20 | 2026-04-23 | Late |
| 260400123 | 2026-04-10 | SPAREPART | 5017.0401 | KONEKTOR DB 15 MALE FEMALE | 260400317 | 9,800 | 260400317 | 2026-04-16 | 2026-04-27 | 5 | 9,800 | 6 | 260400594 | 2026-04-17 | 1 | 2026-05-04 | On time |
| 260400165 | 2026-04-14 | PERSEDIAAN UMUM | 6010.0338 | SILICON CLEAR | 260400313 | 26,126.13 | 260400313 | 2026-04-16 | 2026-04-16 | 4 | 26,126.13 | 2 | 260400697 | 2026-04-20 | 4 | 2026-04-23 | On time |
| 260400165 | 2026-04-14 | PERSEDIAAN UMUM | 6030.2908 | DR SONNE PROFILE H (4H) / SAMBUNGAN H POLICARBONATE @6METER | 260400312 | 102,342.34 | 260400312 | 2026-04-16 | 2026-04-16 | 8 | 102,342.34 | 2 | 260400761 | 2026-04-21 | 5 | 2026-04-23 | On time |
| 260400180 | 2026-04-15 | PERSEDIAAN UMUM | 6020.0056 | PENETRATING OIL ER 5711 | 260500455 | 54,500 | 260400318 | 2026-04-16 | 2026-04-27 | 48 | 49,500 | 1 | 260400700 | 2026-04-20 | 4 | 2026-05-04 | On time |
| 260400181 | 2026-04-15 | PERSEDIAAN UMUM | 6050.0378 | TANG KOMBINASI 7 INCH | 260500036 | 44,500 | 260400319 | 2026-04-16 | 2026-04-24 | 1 | 75,000 | 1 | 260400740 | 2026-04-21 | 5 | 2026-05-01 | On time |
| 260400214 | 2026-04-15 | PERSEDIAAN UMUM | 6030.2916 | DR SONNE SOLID SHEET FLAT ST 6 MM, L = 1220 MM P = 6000 MM CLEAR | 260400312 | 4,643,783.78 | 260400312 | 2026-04-16 | 2026-04-16 | 3 | 4,643,783.78 | 1 | 260400761 | 2026-04-21 | 5 | 2026-04-23 | On time |
| 260400214 | 2026-04-15 | PERSEDIAAN UMUM | 6030.2908 | DR SONNE PROFILE H (4H) / SAMBUNGAN H POLICARBONATE @6METER | 260400312 | 102,342.34 | 260400312 | 2026-04-16 | 2026-04-16 | 4 | 102,342.34 | 1 | 260400761 | 2026-04-21 | 5 | 2026-04-23 | On time |
| 260400220 | 2026-04-09 | PERSEDIAAN UMUM | 6050.0591 | PLAT CARBON STEEL 3MM X 1200MM X 2400MM | 260600189 | 781,981.98 | 260400311 | 2026-04-16 | 2026-04-16 | 200 | 783,783.78 | 7 | 260400706 | 2026-04-20 | 4 | 2026-04-23 | On time |
| 260400221 | 2026-04-15 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260400303 | 2026-04-16 | 2026-05-04 | 54,600 | 1,275 | 1 | 260400747 | 2026-04-21 | 5 | 2026-05-11 | On time |
| 260400221 | 2026-04-15 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260400303 | 2026-04-16 | 2026-05-04 | 54,600 | 1,275 | 1 | 260400793 | 2026-04-22 | 6 | 2026-05-11 | On time |
| 260400221 | 2026-04-15 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260400303 | 2026-04-16 | 2026-05-04 | 54,600 | 1,275 | 1 | 260400858 | 2026-04-23 | 7 | 2026-05-11 | On time |
| 260400221 | 2026-04-15 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260400303 | 2026-04-16 | 2026-05-04 | 54,600 | 1,275 | 1 | 260500006 | 2026-05-02 | 16 | 2026-05-11 | On time |