KKobin GroupProcurement KPI

Merged data

The merged procurement sheet (PR → PO → GRPO) with the realisasi status used by KPI 2/3 · 13,488 row(s)

Export CSV
How the three files are consolidated— click to expand

Three SAP exports are combined. The SPINE is PR TO PO TO GRPO — the master PR list (one row per PR-item, including PRs not yet converted to a PO). It sets the dashboard's date span and is KPI 4's denominator.

PO.csv enriches it with the PO details that only it carries: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), the ETA, currency and unit price, joined on PO No.

LEAD TIME PR TO GR adds the goods-receipt detail: one row per GR with its date and quantity, plus the ordered PO quantity, last/current price and PR→PO days. This is what makes the quantity-aware completion possible.

KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).

On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality), 6 (Substitution) and 7 (New Vendor) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.

Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.

PR NoPR DateItem GroupItem CodeItemLast POLast PricePO NoPO Date ▼ETAQtyPricePR→POGRPO NoGRPO DatePO→GRPODeadlineRealisasi
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222606000392026-06-02342026-06-04On time
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222606004292026-06-11432026-06-04Late
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222605009112026-05-28292026-06-04On time
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222605007412026-05-22232026-06-04On time
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222605009102026-05-28292026-06-04On time
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222606004302026-06-11432026-06-04Late
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222606001672026-06-05372026-06-04Late
2604000892026-04-07PERSEDIAAN UMUM6030.259PAVING BLOCK PERSEGI PANJANG 80X105X210 MM (K-400)2604004992,0002604004992026-04-292026-05-2840,0002,000222606001662026-06-05372026-06-04Late
2604001462026-04-13PERSEDIAAN UMUM6050.1723SELANG KOMPRESSOR SP-8 8.5X142604005152,400,0002604005152026-04-292026-05-0812,400,000162605000662026-05-0452026-05-15On time
2604001542026-04-13SPAREPART5010.0025FILTER OIL KAESER 6.3464.12604005091,140,0002604005092026-04-292026-06-1221,140,000162605008412026-05-26272026-06-19On time
2604001542026-04-13SPAREPART5010.0024FILTER UDARA KAESER 6.3564.02604005091,092,5002604005092026-04-292026-06-1231,092,500162605008412026-05-26272026-06-19On time
2604001542026-04-13SPAREPART5010.0021OIL SEPARATOR 6.3571.02605003933,510,9002604005092026-04-292026-06-1218,787,500162605008412026-05-26272026-06-19On time
2604001542026-04-13BAHAN BAKAR4040.0003OIL SIGMA LUBRICANT 9.5409.000202605003926,887,5002604005092026-04-292026-06-1246,887,500162605008412026-05-26272026-06-19On time
2604001572026-04-13SPAREPART5021.042V. BELT SPB 3150 LW X-POWER260400510205,0502604005102026-04-292026-05-076205,050162605004372026-05-13142026-05-14On time
2604001572026-04-13SPAREPART5021.0418V. BELT SPB 2419 LW / 5V950 X-POWER260400510165,7002604005102026-04-292026-05-076165,700162605004372026-05-13142026-05-14On time
2604001972026-04-15SPAREPART5025.01DRIVER INDEXER AP7 E590651005026040050658,383,8622604005062026-04-292026-05-10158,383,862142605001912026-05-0782026-05-17On time
2604002332026-04-16FIXED ASSETSAST02763POMPA SHIMIZU JET-400BIT (GLAZING LINE)2604004971,709,459.462604004972026-04-292026-05-0411,709,459.46132604011742026-04-3012026-05-11On time
2604002492026-04-17SPAREPART5030.0036PLATE EJECTOR D=60 LR=30 C8322162992260400505216,2952604005052026-04-292026-07-1530216,295122605001082026-05-0562026-07-22On time
2604002492026-04-17SPAREPART5030.0129DRIVING SHAFT C8111742000 / DD=20-25-30-17 L=229 2CL 22604005051,116,7382604005052026-04-292026-07-1521,116,738122026-07-22Outstanding
2604002492026-04-17SPAREPART5030.147PULLY 81121167012604005051,215,4812604005052026-04-292026-07-1561,215,481122605007022026-05-21222026-07-22On time
2604002492026-04-17SPAREPART5030.1848111742100 ALBERO SHAFT2604005051,281,3102604005052026-04-292026-07-1521,281,310122605001082026-05-0562026-07-22On time
2604002532026-04-17SPAREPART5021.047190005066 STACKER, VERTICAL TIMING BELT260400505909,8482604005052026-04-292026-07-1518909,848122605007032026-05-21222026-07-22On time
2604002662026-04-17BAHAN PEMBANTU20OT.0001PAC POWDER2604005079,0002604005072026-04-292026-05-044,0009,000122605000782026-05-0562026-05-11On time
2604002672026-04-17BAHAN PACKING3011.0306NFT01 50X50 REC KAISAR MP2 KW-A 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122606001202026-06-04362026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0293NFT01 50X50 REC JUPITER MP1 KW-A 503X43 (WK150/150/150)2605003906152604005162026-04-292026-05-1120,000615122605005452026-05-18192026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0294NFT01 50X50 REC JUPITER MP2 KW-A 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605005152026-05-16172026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0305NFT01 50X50 REC KAISAR MP1 KW-A 503X43 (WK150/150/150)2605003906152604005162026-04-292026-05-1120,000615122605007342026-05-22232026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0307NFT01 50X50 REC KAISAR MP1 KW-B 503X43 (BK150/150/150)2605003905522604005162026-04-292026-05-1120,000552122605007342026-05-22232026-05-18Late
2604002672026-04-17BAHAN PACKING3011.029NFT01 50X50 REC KOBIN MP2 KW-A 503X46 (WK150/150/150)2605004745322604005162026-04-292026-05-1120,000542122605004722026-05-15162026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0292NFT01 50X50 REC KOBIN MP2 KW-B 503X46 (WK150/150/150)2605004745322604005162026-04-292026-05-1120,000542122605005152026-05-16172026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0308NFT01 50X50 REC KAISAR MP2 KW-B 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605009482026-05-29302026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0291NFT01 50X50 REC KOBIN MP1 KW-B 503X43 (BK150/150/150)2605004745362604005162026-04-292026-05-1120,000552122605004722026-05-15162026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0304NFT01 50X50 REC MY MP2 KW-B 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605006312026-05-20212026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0289NFT01 50X50 REC KOBIN MP1 KW-A 503X43 (WK150/150/150)2605004746152604005162026-04-292026-05-1120,000615122605004722026-05-15162026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0294NFT01 50X50 REC JUPITER MP2 KW-A 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605005452026-05-18192026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0295NFT01 50X50 REC JUPITER MP1 KW-B 503X43 (BK150/150/150)2605003905522604005162026-04-292026-05-1120,000552122605004722026-05-15162026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0293NFT01 50X50 REC JUPITER MP1 KW-A 503X43 (WK150/150/150)2605003906152604005162026-04-292026-05-1120,000615122605005152026-05-16172026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0302NFT01 50X50 REC MY MP2 KW-A 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605007342026-05-22232026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0301NFT01 50X50 REC MY MP1 KW-A 503X43 (WK150/150/150)2605003906152604005162026-04-292026-05-1120,000615122605007342026-05-22232026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0303NFT01 50X50 REC MY MP1 KW-B 503X43 (BK150/150/150)2605003905522604005162026-04-292026-05-1120,000552122605006312026-05-20212026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0292NFT01 50X50 REC KOBIN MP2 KW-B 503X46 (WK150/150/150)2605004745322604005162026-04-292026-05-1120,000542122606002822026-06-08402026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0298NFT01 50X50 REC PARIS MP2 KW-A 503X46 (WK150/150/150)2605004745322604005162026-04-292026-05-1120,000542122606002252026-06-06382026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0296NFT01 50X50 REC JUPITER MP2 KW-B 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605005152026-05-16172026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0297NFT01 50X50 REC PARIS MP1 KW-A 503X43 (WK150/150/150)2605004746152604005162026-04-292026-05-1120,000615122606002252026-06-06382026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0291NFT01 50X50 REC KOBIN MP1 KW-B 503X43 (BK150/150/150)2605004745362604005162026-04-292026-05-1120,000552122606002822026-06-08402026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0299NFT01 50X50 REC PARIS MP1 KW-B 503X43 (BK150/150/150)2605003905522604005162026-04-292026-05-1120,000552122605008492026-05-26272026-05-18Late
2604002672026-04-17BAHAN PACKING3011.0296NFT01 50X50 REC JUPITER MP2 KW-B 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605005452026-05-18192026-05-18On time
2604002672026-04-17BAHAN PACKING3011.0295NFT01 50X50 REC JUPITER MP1 KW-B 503X43 (BK150/150/150)2605003905522604005162026-04-292026-05-1120,000552122605005452026-05-18192026-05-18On time
2604002672026-04-17BAHAN PACKING3011.03NFT01 50X50 REC PARIS MP2 KW-B 503X46 (WK150/150/150)2605003905422604005162026-04-292026-05-1120,000542122605008492026-05-26272026-05-18Late
2604002682026-04-17SPAREPART5026.0113DEGASSING DL-G6 90029635 EX.90018642 INCL. FILTER CAA10PN02 9680100025 & FILTER CAA20PN02 96801000262605004026,230,0002604005052026-04-292026-07-15176,230,000122605001082026-05-0562026-07-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606003542026-06-10422026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606003192026-06-09412026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605000832026-05-0562026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605000422026-05-0452026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605000432026-05-0452026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606000532026-06-03352026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606001512026-06-05372026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605008762026-05-28292026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605008512026-05-26272026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605001222026-05-0672026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605005122026-05-16172026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605005332026-05-18192026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606004532026-06-12442026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605004032026-05-13142026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605006192026-05-20212026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605003222026-05-11122026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605000442026-05-0452026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605000452026-05-0452026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606001022026-06-04362026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605009902026-05-30312026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606005082026-06-13452026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605006532026-05-21222026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605005812026-05-19202026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606004102026-06-11432026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605002182026-05-0892026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605002702026-05-09102026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606005602026-06-15472026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605003622026-05-12132026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605009442026-05-29302026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605001712026-05-0782026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606006232026-06-17492026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606002152026-06-06382026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606002462026-06-08402026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605004602026-05-15162026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605008072026-05-25262026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122606000052026-06-02342026-05-22Late
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605007192026-05-22232026-05-22On time
2604002782026-04-17BAHAN BAKU BODY1010.004PHIROPILIT CB (CALCIUM BUMI MAKMUR)2604005222202604005222026-04-292026-05-154,800,000220122605007792026-05-23242026-05-22Late
2604002862026-04-20PERSEDIAAN UMUM6030.2953SARUNG TANGAN LAS PANJANG260400523270,0002604005232026-04-292026-05-151270,00092605000592026-05-0452026-05-22On time
2604002942026-04-17PERSEDIAAN UMUM6050.0482AVO METER SANWA CD 800 A260400511560,0002604005112026-04-292026-05-111560,000122605003402026-05-11122026-05-18On time
2604002942026-04-17PERSEDIAAN UMUM6030.1346OBENG - 4 MM26040051216,8002604005122026-04-292026-05-08116,800122605000652026-05-0452026-05-15On time
2604002942026-04-17PERSEDIAAN UMUM6030.2646OBENG + 4 MM26040051216,8002604005122026-04-292026-05-08116,800122605000652026-05-0452026-05-15On time
2604002942026-04-17PERSEDIAAN UMUM6050.1171TANG CRIMPING RJ45260400514185,0002604005142026-04-292026-05-081185,000122605005932026-05-19202026-05-15Late
2604002942026-04-17PERSEDIAAN UMUM6030.1997TANG POTONG SERONG 6 INCH, SATA260400513142,5002604005132026-04-292026-05-081142,500122605003282026-05-11122026-05-15On time
2604003072026-04-20SPAREPART5012.0237SEAL TC 55.72.826040051910,8002604005192026-04-292026-05-151010,80092604011792026-04-3012026-05-22On time
2604003112026-04-20SPAREPART5011.0574BEARING UC 217260400529640,5002604005292026-04-292026-05-143640,50092605002022026-05-0782026-05-21On time
2604003112026-04-20SPAREPART5011.0575BEARING UCP 2172604005291,066,0002604005292026-04-292026-05-1441,066,00092605002022026-05-0782026-05-21On time
2604003142026-04-20PERSEDIAAN UMUM6060.0685LEM SUNPAT ECO 310 (CEMENT) + LEM SUNPAT ECO 305 (HARDENING AGENT)260400533485,0002604005332026-04-292026-05-154485,00092605004432026-05-13142026-05-22On time
2604100112026-04-07PERSEDIAAN UMUM6030.005PAKU 5 INCH26041020820,0002604102082026-04-292026-05-082020,000222605100652026-05-0672026-05-15On time
2604100202026-04-08PERSEDIAAN UMUM6050.1717DONGCHENG DZC04-28 MESIN BOR BOBOK BETON ROTARY HAMMER 28MM 3 MODE DZC 04-282604101871,100,0002604101872026-04-292026-04-2951,100,000212604105712026-04-3012026-05-06On time
← PrevPage 13 of 135Next →Rows per page:1020501005001000