Merged data
The merged procurement sheet (PR → PO → GRPO) with the realisasi status used by KPI 2/3 · 13,488 row(s)
How the three files are consolidated— click to expand
Three SAP exports are combined. The SPINE is PR TO PO TO GRPO — the master PR list (one row per PR-item, including PRs not yet converted to a PO). It sets the dashboard's date span and is KPI 4's denominator.
PO.csv enriches it with the PO details that only it carries: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), the ETA, currency and unit price, joined on PO No.
LEAD TIME PR TO GR adds the goods-receipt detail: one row per GR with its date and quantity, plus the ordered PO quantity, last/current price and PR→PO days. This is what makes the quantity-aware completion possible.
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality), 6 (Substitution) and 7 (New Vendor) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR No | PR Date | Item Group | Item Code | Item | Last PO | Last Price | PO No | PO Date ▼ | ETA | Qty | Price | PR→PO | GRPO No | GRPO Date | PO→GRPO | Deadline | Realisasi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260100677 | 2026-02-13 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260101107 | 2026-02-28 | 2026-03-20 | 1,100,000 | 140 | 15 | 260300037 | 2026-03-03 | 3 | 2026-03-27 | On time |
| 260100677 | 2026-02-13 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260101107 | 2026-02-28 | 2026-03-20 | 1,100,000 | 140 | 15 | – | – | – | 2026-03-27 | Overdue |
| 260100677 | 2026-02-13 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260101107 | 2026-02-28 | 2026-03-20 | 1,100,000 | 140 | 15 | 260300189 | 2026-03-05 | 5 | 2026-03-27 | On time |
| 260100678 | 2026-02-13 | BAHAN BAKU BODY | 1010.0006 | PHIROPILIT (GUNUNG BALE) | 260600007 | 220 | 260101111 | 2026-02-28 | 2026-03-20 | 2,200,000 | 205 | 15 | 260300970 | 2026-03-31 | 31 | 2026-03-27 | Late |
| 260100678 | 2026-02-13 | BAHAN BAKU BODY | 1010.0006 | PHIROPILIT (GUNUNG BALE) | 260600007 | 220 | 260101111 | 2026-02-28 | 2026-03-20 | 2,200,000 | 205 | 15 | 260400007 | 2026-04-01 | 32 | 2026-03-27 | Late |
| 260100678 | 2026-02-13 | BAHAN BAKU BODY | 1010.0006 | PHIROPILIT (GUNUNG BALE) | 260600007 | 220 | 260101111 | 2026-02-28 | 2026-03-20 | 2,200,000 | 205 | 15 | 260300226 | 2026-03-06 | 6 | 2026-03-27 | On time |
| 260100678 | 2026-02-13 | BAHAN BAKU BODY | 1010.0006 | PHIROPILIT (GUNUNG BALE) | 260600007 | 220 | 260101111 | 2026-02-28 | 2026-03-20 | 2,200,000 | 205 | 15 | 260300549 | 2026-03-13 | 13 | 2026-03-27 | On time |
| 260100679 | 2026-02-13 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260101108 | 2026-02-28 | 2026-03-20 | 1,800,000 | 196 | 15 | – | – | – | 2026-03-27 | Overdue |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400375 | 2026-04-11 | 42 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260401061 | 2026-04-29 | 60 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400249 | 2026-04-09 | 40 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400540 | 2026-04-16 | 47 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400497 | 2026-04-15 | 46 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400773 | 2026-04-22 | 53 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400122 | 2026-04-06 | 37 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400192 | 2026-04-08 | 39 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400310 | 2026-04-10 | 41 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400845 | 2026-04-23 | 54 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400410 | 2026-04-13 | 44 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400670 | 2026-04-20 | 51 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260401142 | 2026-04-30 | 61 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400451 | 2026-04-14 | 45 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400900 | 2026-04-24 | 55 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260500022 | 2026-05-02 | 63 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260401006 | 2026-04-28 | 59 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400980 | 2026-04-27 | 58 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400932 | 2026-04-25 | 56 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400732 | 2026-04-21 | 52 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400051 | 2026-04-02 | 33 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260500041 | 2026-05-04 | 65 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400220 | 2026-04-08 | 39 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400584 | 2026-04-17 | 48 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400636 | 2026-04-17 | 48 | 2026-03-27 | Late |
| 260100680 | 2026-02-13 | BAHAN BAKU BODY | 1010.0002 | FELDSPAR (MK-5) | 260600008 | 150 | 260101109 | 2026-02-28 | 2026-03-20 | 5,400,000 | 140 | 15 | 260400104 | 2026-04-04 | 35 | 2026-03-27 | Late |
| 260100681 | 2026-02-13 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260101110 | 2026-02-28 | 2026-03-20 | 2,400,000 | 269 | 15 | – | – | – | 2026-03-27 | Overdue |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6030.1936 | CAT BESI AVIAN MAROON | 260101159 | 57,472.5 | 260101159 | 2026-02-28 | 2026-02-28 | 5 | 57,472.5 | 10 | 260300140 | 2026-03-04 | 4 | 2026-03-07 | On time |
| 260100693 | 2026-02-18 | PERSEDIAAN UMUM | 6030.002 | PLAT BESI 10X1200X2400MM | 260300278 | 2,285,585.59 | 260101163 | 2026-02-28 | 2026-02-28 | 6 | 2,193,558.56 | 10 | 260300063 | 2026-03-04 | 4 | 2026-03-07 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300865 | 2026-03-26 | 26 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300643 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300646 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300644 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300647 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300648 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300649 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300645 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300640 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300906 | 2026-03-28 | 28 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300905 | 2026-03-28 | 28 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300218 | 2026-03-06 | 6 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300282 | 2026-03-07 | 7 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300281 | 2026-03-07 | 7 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300280 | 2026-03-07 | 7 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300904 | 2026-03-28 | 28 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300321 | 2026-03-09 | 9 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300320 | 2026-03-09 | 9 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300555 | 2026-03-13 | 13 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300502 | 2026-03-12 | 12 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300556 | 2026-03-13 | 13 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300642 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300594 | 2026-03-14 | 14 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300438 | 2026-03-10 | 10 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300866 | 2026-03-26 | 26 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300366 | 2026-03-10 | 10 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300322 | 2026-03-09 | 9 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300903 | 2026-03-28 | 28 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300778 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300706 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | – | – | – | 2026-03-17 | Overdue |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300704 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300705 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300703 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300650 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300863 | 2026-03-26 | 26 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300781 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300780 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300595 | 2026-03-14 | 14 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300864 | 2026-03-26 | 26 | 2026-03-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300779 | 2026-03-17 | 17 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300651 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101103 | 2026-02-28 | 2026-03-10 | 1,500,000 | 1,530 | 10 | 260300641 | 2026-03-16 | 16 | 2026-03-17 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0015 | INK - CIK GL 1219 GLOSSY | 260600139 | 256,202 | 260101152 | 2026-02-28 | 2026-03-02 | 72 | 246,788 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0002 | INK - CIK AM 5118 YELLOW | 260600273 | 179,341 | 260101152 | 2026-02-28 | 2026-03-02 | 360 | 172,752 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0001 | INK - CIK RO 4118 PINK | 260600030 | 231,196 | 260101152 | 2026-02-28 | 2026-03-02 | 24 | 222,701 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.002 | INK - CIK MA 5457 BROWN | 260600246 | 97,972 | 260101152 | 2026-02-28 | 2026-03-02 | 216 | 94,372 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0005 | INK - CIK MA 5115 BROWN | 260600273 | 145,523 | 260101152 | 2026-02-28 | 2026-03-02 | 96 | 140,176 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0018 | INK - CIK AM 5456 YELLOW | 260400292 | 144,980 | 260101152 | 2026-02-28 | 2026-03-02 | 192 | 146,098 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0019 | INK - CIK AZ 1165 BLUE | 260600119 | 228,327 | 260101152 | 2026-02-28 | 2026-03-02 | 192 | 204,340 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0022 | INK - CIK RC 1116 SINKING | 260500301 | 262,188 | 260101152 | 2026-02-28 | 2026-03-02 | 72 | 258,436 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0007 | INK - CIK RC 1151 SINKING | 260600273 | 284,281 | 260101152 | 2026-02-28 | 2026-03-02 | 120 | 273,836 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0006 | INK - CIK NE 6153 BLACK | 260600246 | 259,276 | 260101152 | 2026-02-28 | 2026-03-02 | 96 | 229,809 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0004 | INK - CIK AZ 1111 BLUE | 260600273 | 298,629 | 260101152 | 2026-02-28 | 2026-03-02 | 192 | 272,059 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0003 | INK - CIK BG 9154 BEIGE | 260500234 | 151,624 | 260101152 | 2026-02-28 | 2026-03-02 | 20 | 149,455 | 10 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100706 | 2026-02-18 | BAHAN PEMBANTU | 2033.0003 | FLUORESCENT LIQUID MARKER (TRANSPARENT) | 260500268 | 32,500 | 260101189 | 2026-02-28 | 2026-03-06 | 120 | 31,000 | 10 | 260300397 | 2026-03-10 | 10 | 2026-03-13 | On time |
| 260100707 | 2026-02-18 | BAHAN PEMBANTU | 2033.0002 | BLACK INK | 260600033 | 75,024.6 | 260101190 | 2026-02-28 | 2026-03-05 | 100 | 70,383.6 | 10 | 260300109 | 2026-03-04 | 4 | 2026-03-12 | On time |
| 260100708 | 2026-02-18 | BAHAN PEMBANTU | 2033.0001 | YELLOW INK | 260500268 | 81,500 | 260101188 | 2026-02-28 | 2026-03-06 | 60 | 80,000 | 10 | 260300399 | 2026-03-10 | 10 | 2026-03-13 | On time |
| 260100710 | 2026-02-18 | BAHAN PEMBANTU | 2022.0003 | PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR | 260600221 | 350,000 | 260101129 | 2026-02-28 | 2026-03-12 | 380 | 350,000 | 10 | 260300767 | 2026-03-17 | 17 | 2026-03-19 | On time |
| 260100710 | 2026-02-18 | BAHAN PEMBANTU | 2022.0003 | PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR | 260600221 | 350,000 | 260101129 | 2026-02-28 | 2026-03-12 | 380 | 350,000 | 10 | 260300196 | 2026-03-05 | 5 | 2026-03-19 | On time |
| 260100710 | 2026-02-18 | BAHAN PEMBANTU | 2022.0003 | PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR | 260600221 | 350,000 | 260101129 | 2026-02-28 | 2026-03-12 | 380 | 350,000 | 10 | 260300845 | 2026-03-25 | 25 | 2026-03-19 | Late |
| 260100710 | 2026-02-18 | BAHAN PEMBANTU | 2022.0003 | PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR | 260600221 | 350,000 | 260101129 | 2026-02-28 | 2026-03-12 | 380 | 350,000 | 10 | 260300343 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100726 | 2026-02-19 | PERSEDIAAN UMUM | 6050.1373 | MIKROSKOP KAMERA PONSEL AB66 | 260500170 | 39,874.25 | 260101186 | 2026-02-28 | 2026-03-12 | 3 | 47,566.67 | 9 | 260300211 | 2026-03-05 | 5 | 2026-03-19 | On time |
| 260100735 | 2026-02-19 | BAHAN PEMBANTU | 20MO.0649 | LOWER PUNCH 40X40 (416.75X416.75X26) | 260101154 | 2,450,000 | 260101154 | 2026-02-28 | 2026-02-28 | 20 | 2,450,000 | 9 | 260400884 | 2026-04-23 | 54 | 2026-03-07 | Late |
| 260100736 | 2026-02-19 | BAHAN PEMBANTU | 20MO.0637 | LOWER PUNCH 50 X 50 (522,10X522,10) T=26MM | 260101154 | 3,600,000 | 260101154 | 2026-02-28 | 2026-02-28 | 16 | 3,600,000 | 9 | 260400884 | 2026-04-23 | 54 | 2026-03-07 | Late |
| 260100741 | 2026-02-20 | SPAREPART | 5031.0017 | BALLVALVE 3 INCH ONDA | 260500482 | 2,106,000 | 260101169 | 2026-02-28 | 2026-03-12 | 7 | 1,980,000 | 8 | 260300310 | 2026-03-07 | 7 | 2026-03-19 | On time |
| 260100751 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0492 | TALI TAMPAR 10 MM | 260101170 | 5,000 | 260101170 | 2026-02-28 | 2026-03-07 | 10 | 5,000 | 8 | 260300067 | 2026-03-04 | 4 | 2026-03-14 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6060.0423 | DOUBLE NEPLE GALVANIS 3 INCH | 260101161 | 110,000 | 260101161 | 2026-02-28 | 2026-02-28 | 10 | 110,000 | 8 | 260300059 | 2026-03-03 | 3 | 2026-03-07 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2188 | WATER MUR GALVANIS 3 INCH | 260300227 | 243,513.51 | 260101161 | 2026-02-28 | 2026-02-28 | 5 | 296,500 | 8 | 260300059 | 2026-03-03 | 3 | 2026-03-07 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0072 | SAPU DORONG 90 CM | 260500421 | 113,000 | 260101183 | 2026-02-28 | 2026-03-10 | 42 | 106,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0015 | PEMBERSIH LANTAI | 260500421 | 16,000 | 260101183 | 2026-02-28 | 2026-03-10 | 24 | 16,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0873 | KEMOCENG | 260101183 | 20,000 | 260101183 | 2026-02-28 | 2026-03-10 | 1 | 20,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0038 | SAPU LANTAI | 260500421 | 17,000 | 260101183 | 2026-02-28 | 2026-03-10 | 60 | 16,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0078 | REFILL SAPU DORONG | 260500421 | 68,000 | 260101183 | 2026-02-28 | 2026-03-10 | 14 | 65,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0041 | PEL SUMBU | 260610080 | 22,000 | 260101183 | 2026-02-28 | 2026-03-10 | 5 | 45,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0067 | SAPU LIDI TONGKAT | 260500475 | 11,000 | 260101183 | 2026-02-28 | 2026-03-10 | 42 | 10,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0039 | SAPU LIDI | 260610080 | 12,000 | 260101183 | 2026-02-28 | 2026-03-10 | 10 | 5,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.104 | LAP MICROFIBER | 260610083 | 4,100 | 260101183 | 2026-02-28 | 2026-03-10 | 4 | 20,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0497 | ALAT PEMBERSIH KACA | 260610080 | 13,000 | 260101183 | 2026-02-28 | 2026-03-10 | 2 | 20,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0017 | KAPUR BARUS TOILET | 260500421 | 28,000 | 260101183 | 2026-02-28 | 2026-03-10 | 1 | 27,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0151 | KANTONG KRESEK JUMBO | 260500421 | 40,000 | 260101183 | 2026-02-28 | 2026-03-10 | 1 | 38,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | STATIONERY | 6010.0322 | KESET TEBAL | 260101183 | 40,000 | 260101183 | 2026-02-28 | 2026-03-10 | 1 | 40,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | STATIONERY | 6010.0323 | KESET MERAH | 260500082 | 40,000 | 260101183 | 2026-02-28 | 2026-03-10 | 6 | 25,000 | 8 | 260300142 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100759 | 2026-02-20 | SPAREPART | 5019.036 | GEARBOX NMRV 050 RATIO 1:15 INPUT SHAFT 19 OUTPUT SHAFT 25 | 260101166 | 3,062,500 | 260101166 | 2026-02-28 | 2026-03-11 | 2 | 3,062,500 | 8 | 260300147 | 2026-03-04 | 4 | 2026-03-18 | On time |
| 260100760 | 2026-02-21 | SPAREPART | 5031.0597 | SEAT,CHECK BALL NO 34 | 260101165 | 180,000 | 260101165 | 2026-02-28 | 2026-03-16 | 30 | 180,000 | 7 | 260400076 | 2026-04-04 | 35 | 2026-03-23 | Late |
| 260100760 | 2026-02-21 | SPAREPART | 5031.0597 | SEAT,CHECK BALL NO 34 | 260101165 | 180,000 | 260101165 | 2026-02-28 | 2026-03-16 | 30 | 180,000 | 7 | 260300279 | 2026-03-07 | 7 | 2026-03-23 | On time |
| 260100761 | 2026-02-21 | PERSEDIAAN UMUM | 6020.028 | KOMPOR LISTRIK 1 TUNGKU 300/600 W | 260101181 | 132,828.83 | 260101181 | 2026-02-28 | 2026-03-12 | 2 | 132,828.83 | 7 | 260300115 | 2026-03-04 | 4 | 2026-03-19 | On time |
| 260100766 | 2026-02-21 | SPAREPART | 5019.0361 | GEARBOX NMRV 075 RATIO 1:60MM 90 B5 + MOTOR 1.5KW 1500RPM 380VOLT | 260300356 | 7,812,500 | 260101134 | 2026-02-28 | 2026-03-16 | 2 | 7,812,500 | 7 | 260300237 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100767 | 2026-02-21 | SPAREPART | 5022.0406 | GEAR SPROKET 06 B1 Z18 | 260101178 | 135,000 | 260101178 | 2026-02-28 | 2026-03-28 | 8 | 135,000 | 7 | 260400712 | 2026-04-20 | 51 | 2026-04-04 | Late |
| 260100772 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0017 | KAOLIN POWDER MESH 325 | 260600190 | 1,897 | 260101123 | 2026-02-28 | 2026-04-02 | 50,000 | 1,575 | 8 | 260500717 | 2026-05-22 | 83 | 2026-04-09 | Late |
| 260100772 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0017 | KAOLIN POWDER MESH 325 | 260600190 | 1,897 | 260101123 | 2026-02-28 | 2026-04-02 | 50,000 | 1,575 | 8 | 260500642 | 2026-05-21 | 82 | 2026-04-09 | Late |
| 260100774 | 2026-02-20 | BAHAN BAKU GLAZE | 1098.0014 | STPP (Sodium Tripolyphospate) | 260600045 | 25,700 | 260101124 | 2026-02-28 | 2026-03-04 | 7,500 | 23,000 | 8 | 260300833 | 2026-03-22 | 22 | 2026-03-11 | Late |
| 260100774 | 2026-02-20 | BAHAN BAKU GLAZE | 1098.0014 | STPP (Sodium Tripolyphospate) | 260600045 | 25,700 | 260101124 | 2026-02-28 | 2026-03-04 | 7,500 | 23,000 | 8 | 260300893 | 2026-03-27 | 27 | 2026-03-11 | Late |
| 260100775 | 2026-02-20 | BAHAN BAKU GLAZE | 1098.0004 | CMC C-20 | 260600049 | 85,475.6 | 260101125 | 2026-02-28 | 2026-03-03 | 2,000 | 82,413.1 | 8 | 260300105 | 2026-03-04 | 4 | 2026-03-10 | On time |
| 260100776 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0024 | ALUMINA A-10 | 260600048 | 12,036.36 | 260101126 | 2026-02-28 | 2026-03-03 | 4,000 | 11,605.11 | 8 | 260300106 | 2026-03-04 | 4 | 2026-03-10 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260400118 | 2026-04-06 | 37 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260300104 | 2026-03-04 | 4 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260300373 | 2026-03-10 | 10 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260300634 | 2026-03-14 | 14 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260300227 | 2026-03-06 | 6 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260300633 | 2026-03-14 | 14 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | – | – | – | 2026-04-06 | Overdue |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260300496 | 2026-03-12 | 12 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260400186 | 2026-04-08 | 39 | 2026-04-06 | Late |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260300437 | 2026-03-10 | 10 | 2026-04-06 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260101130 | 2026-02-28 | 2026-03-30 | 375,000 | 7,453.75 | 8 | 260400213 | 2026-04-08 | 39 | 2026-04-06 | Late |
| 260100778 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0027 | SODIUM FELDSPAR 325 MESH | 260400405 | 2,468.45 | 260101135 | 2026-02-28 | 2026-03-30 | 50,000 | 2,312.6 | 8 | 260300635 | 2026-03-16 | 16 | 2026-04-06 | On time |
| 260100778 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0027 | SODIUM FELDSPAR 325 MESH | 260400405 | 2,468.45 | 260101135 | 2026-02-28 | 2026-03-30 | 50,000 | 2,312.6 | 8 | 260500011 | 2026-05-02 | 63 | 2026-04-06 | Late |
| 260100779 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260101136 | 2026-02-28 | 2026-03-31 | 96,000 | 1,225 | 8 | 260300557 | 2026-03-13 | 13 | 2026-04-07 | On time |
| 260100779 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260101136 | 2026-02-28 | 2026-03-31 | 96,000 | 1,225 | 8 | 260300179 | 2026-03-05 | 5 | 2026-04-07 | On time |
| 260100779 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260101136 | 2026-02-28 | 2026-03-31 | 96,000 | 1,225 | 8 | 260300287 | 2026-03-07 | 7 | 2026-04-07 | On time |
| 260100779 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260101136 | 2026-02-28 | 2026-03-31 | 96,000 | 1,225 | 8 | 260300367 | 2026-03-10 | 10 | 2026-04-07 | On time |
| 260100780 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0026 | POTASSIUM FELDSPAR POWDER KN-200 | 260500316 | 2,720.56 | 260101148 | 2026-02-28 | 2026-04-01 | 135,000 | 2,463.43 | 8 | 260500009 | 2026-05-02 | 63 | 2026-04-08 | Late |
| 260100780 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0026 | POTASSIUM FELDSPAR POWDER KN-200 | 260500316 | 2,720.56 | 260101148 | 2026-02-28 | 2026-04-01 | 135,000 | 2,463.43 | 8 | 260401017 | 2026-04-28 | 59 | 2026-04-08 | Late |
| 260100780 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0026 | POTASSIUM FELDSPAR POWDER KN-200 | 260500316 | 2,720.56 | 260101148 | 2026-02-28 | 2026-04-01 | 135,000 | 2,463.43 | 8 | 260500315 | 2026-05-11 | 72 | 2026-04-08 | Late |
| 260100780 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0026 | POTASSIUM FELDSPAR POWDER KN-200 | 260500316 | 2,720.56 | 260101148 | 2026-02-28 | 2026-04-01 | 135,000 | 2,463.43 | 8 | 260401054 | 2026-04-29 | 60 | 2026-04-08 | Late |
| 260100780 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0026 | POTASSIUM FELDSPAR POWDER KN-200 | 260500316 | 2,720.56 | 260101148 | 2026-02-28 | 2026-04-01 | 135,000 | 2,463.43 | 8 | 260500259 | 2026-05-09 | 70 | 2026-04-08 | Late |
| 260100780 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0026 | POTASSIUM FELDSPAR POWDER KN-200 | 260500316 | 2,720.56 | 260101148 | 2026-02-28 | 2026-04-01 | 135,000 | 2,463.43 | 8 | 260500008 | 2026-05-02 | 63 | 2026-04-08 | Late |
| 260100781 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.005 | COMPOUND FRIT UC 3025 | 260600035 | 8,574.24 | 260101137 | 2026-02-28 | 2026-03-09 | 7,000 | 8,043.84 | 8 | 260300369 | 2026-03-10 | 10 | 2026-03-16 | On time |
| 260100782 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260101139 | 2026-02-28 | 2026-03-30 | 160,000 | 10,091.4 | 8 | 260300372 | 2026-03-10 | 10 | 2026-04-06 | On time |
| 260100782 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260101139 | 2026-02-28 | 2026-03-30 | 160,000 | 10,091.4 | 8 | 260300285 | 2026-03-07 | 7 | 2026-04-06 | On time |
| 260100782 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260101139 | 2026-02-28 | 2026-03-30 | 160,000 | 10,091.4 | 8 | 260300283 | 2026-03-07 | 7 | 2026-04-06 | On time |
| 260100782 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260101139 | 2026-02-28 | 2026-03-30 | 160,000 | 10,091.4 | 8 | 260300284 | 2026-03-07 | 7 | 2026-04-06 | On time |
| 260100782 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260101139 | 2026-02-28 | 2026-03-30 | 160,000 | 10,091.4 | 8 | 260300609 | 2026-03-14 | 14 | 2026-04-06 | On time |
| 260100783 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260101138 | 2026-02-28 | 2026-03-31 | 50,000 | 2,500 | 8 | – | – | – | 2026-04-07 | Overdue |
| 260100783 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260101138 | 2026-02-28 | 2026-03-31 | 50,000 | 2,500 | 8 | 260300317 | 2026-03-09 | 9 | 2026-04-07 | On time |
| 260100783 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260101138 | 2026-02-28 | 2026-03-31 | 50,000 | 2,500 | 8 | 260400379 | 2026-04-11 | 42 | 2026-04-07 | Late |
| 260100784 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.001 | TRANSPARENT FRIT XIT-6315 | 260600052 | 6,541.5 | 260101142 | 2026-02-28 | 2026-03-14 | 25,000 | 6,307.13 | 8 | 260300229 | 2026-03-06 | 6 | 2026-03-21 | On time |
| 260100784 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.001 | TRANSPARENT FRIT XIT-6315 | 260600052 | 6,541.5 | 260101142 | 2026-02-28 | 2026-03-14 | 25,000 | 6,307.13 | 8 | 260300370 | 2026-03-10 | 10 | 2026-03-21 | On time |
| 260100785 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0023 | BENTONITE LGI | 260300141 | 6,750 | 260101147 | 2026-02-28 | 2026-03-11 | 3,000 | 6,750 | 8 | 260300501 | 2026-03-12 | 12 | 2026-03-18 | On time |
| 260100786 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260101140 | 2026-02-28 | 2026-03-31 | 110,000 | 7,736.74 | 8 | 260300371 | 2026-03-10 | 10 | 2026-04-07 | On time |
| 260100786 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260101140 | 2026-02-28 | 2026-03-31 | 110,000 | 7,736.74 | 8 | 260300596 | 2026-03-14 | 14 | 2026-04-07 | On time |
| 260100786 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260101140 | 2026-02-28 | 2026-03-31 | 110,000 | 7,736.74 | 8 | 260300599 | 2026-03-14 | 14 | 2026-04-07 | On time |
| 260100787 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260101127 | 2026-02-28 | 2026-03-30 | 135,000 | 7,989.03 | 8 | 260300107 | 2026-03-04 | 4 | 2026-04-06 | On time |
| 260100787 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260101127 | 2026-02-28 | 2026-03-30 | 135,000 | 7,989.03 | 8 | 260300499 | 2026-03-12 | 12 | 2026-04-06 | On time |
| 260100787 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260101127 | 2026-02-28 | 2026-03-30 | 135,000 | 7,989.03 | 8 | 260300022 | 2026-03-02 | 2 | 2026-04-06 | On time |
| 260100787 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260101127 | 2026-02-28 | 2026-03-30 | 135,000 | 7,989.03 | 8 | 260300498 | 2026-03-12 | 12 | 2026-04-06 | On time |
| 260100787 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260101127 | 2026-02-28 | 2026-03-30 | 135,000 | 7,989.03 | 8 | 260300231 | 2026-03-06 | 6 | 2026-04-06 | On time |
| 260100788 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0059 | TITANIUM DIOXIDE ANASTASE DHA-100 | 260600046 | 42,692.57 | 260101141 | 2026-02-28 | 2026-03-12 | 6,000 | 34,521.48 | 8 | 260300652 | 2026-03-16 | 16 | 2026-03-19 | On time |
| 260100789 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0056 | TRANSPARENT FRIT YGC 00029 | 260101143 | 8,208 | 260101143 | 2026-02-28 | 2026-03-05 | 20,000 | 8,208 | 8 | 260300230 | 2026-03-06 | 6 | 2026-03-12 | On time |
| 260100790 | 2026-02-20 | BAHAN BAKU GLAZE | 1020.0019 | OPACIFIER U-10 | 260600040 | 28,580.8 | 260101144 | 2026-02-28 | 2026-03-31 | 50,000 | 26,812.8 | 8 | 260300559 | 2026-03-13 | 13 | 2026-04-07 | On time |
| 260100790 | 2026-02-20 | BAHAN BAKU GLAZE | 1020.0019 | OPACIFIER U-10 | 260600040 | 28,580.8 | 260101144 | 2026-02-28 | 2026-03-31 | 50,000 | 26,812.8 | 8 | 260300232 | 2026-03-06 | 6 | 2026-04-07 | On time |
| 260100791 | 2026-02-20 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260101132 | 2026-02-28 | 2026-03-30 | 100,000 | 9,463.75 | 8 | 260301016 | 2026-03-31 | 31 | 2026-04-06 | On time |
| 260100791 | 2026-02-20 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260101132 | 2026-02-28 | 2026-03-30 | 100,000 | 9,463.75 | 8 | 260300892 | 2026-03-27 | 27 | 2026-04-06 | On time |
| 260100791 | 2026-02-20 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260101132 | 2026-02-28 | 2026-03-30 | 100,000 | 9,463.75 | 8 | 260300558 | 2026-03-13 | 13 | 2026-04-06 | On time |
| 260100792 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0064 | TRANSPARENT FRIT AR 273 | 260500269 | 9,010.44 | 260101145 | 2026-02-28 | 2026-03-04 | 30,000 | 8,630.37 | 8 | 260300182 | 2026-03-05 | 5 | 2026-03-11 | On time |
| 260100793 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0063 | TRANSPARENT FRIT FJ 9828 B | 260600080 | 9,333 | 260101146 | 2026-02-28 | 2026-03-12 | 15,000 | 8,998 | 8 | 260300854 | 2026-03-26 | 26 | 2026-03-19 | Late |
| 260100793 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0063 | TRANSPARENT FRIT FJ 9828 B | 260600080 | 9,333 | 260101146 | 2026-02-28 | 2026-03-12 | 15,000 | 8,998 | 8 | 260300318 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100794 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0062 | TRANSPARENT FRIT K 0248 | 260600043 | 8,786.25 | 260101133 | 2026-02-28 | 2026-03-13 | 25,000 | 8,291.25 | 8 | 260300316 | 2026-03-09 | 9 | 2026-03-20 | On time |
| 260100799 | 2026-02-23 | PERSEDIAAN UMUM | 6050.1374 | PELAMPUNG SOLAR 3/4 INCH | 260101171 | 82,000 | 260101171 | 2026-02-28 | 2026-03-16 | 2 | 82,000 | 5 | 260300060 | 2026-03-04 | 4 | 2026-03-23 | On time |
| 260100801 | 2026-02-23 | SPAREPART | 5019.0096 | GEAR REDUCER MNRV 063 1:20 | 260300406 | 4,500,000 | 260101131 | 2026-02-28 | 2026-03-16 | 2 | 4,500,000 | 5 | 260300234 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100801 | 2026-02-23 | SPAREPART | 5019.0111 | GEAR REDUCER MNRV 063 R 1:30 (FLANGE 0.75 KW B14) | 260500193 | 4,500,000 | 260101131 | 2026-02-28 | 2026-03-16 | 3 | 4,500,000 | 5 | 260300234 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0041 | V. BELT B - 60 | 260101176 | 43,600 | 260101176 | 2026-02-28 | 2026-03-16 | 6 | 43,600 | 5 | 260300266 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0044 | V. BELT B - 64 | 260500468 | 51,050 | 260101176 | 2026-02-28 | 2026-03-16 | 4 | 46,500 | 5 | 260300266 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0036 | V. BELT B - 50 | 260500209 | 39,900 | 260101176 | 2026-02-28 | 2026-03-16 | 4 | 36,300 | 5 | 260300266 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0145 | V. BELT C - 177 | 260101176 | 238,600 | 260101176 | 2026-02-28 | 2026-03-16 | 4 | 238,600 | 5 | 260300266 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0143 | V. BELT C - 150 | 260101176 | 202,200 | 260101176 | 2026-02-28 | 2026-03-16 | 3 | 202,200 | 5 | 260300266 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0332 | V. BELT C - 236 | 260101176 | 328,500 | 260101176 | 2026-02-28 | 2026-03-16 | 6 | 328,500 | 5 | 260300266 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0037 | V. BELT B - 53 | 260101176 | 38,500 | 260101176 | 2026-02-28 | 2026-03-16 | 4 | 38,500 | 5 | 260300266 | 2026-03-06 | 6 | 2026-03-23 | On time |
| 260100808 | 2026-02-23 | PERSEDIAAN UMUM | 6050.1378 | FOOT KLEP FULL KUNINGAN | 260101177 | 709,459.46 | 260101177 | 2026-02-28 | 2026-03-12 | 5 | 709,459.46 | 5 | 260300135 | 2026-03-04 | 4 | 2026-03-19 | On time |
| 260100808 | 2026-02-23 | PERSEDIAAN UMUM | 6050.1378 | FOOT KLEP FULL KUNINGAN | 260101177 | 709,459.46 | 260101177 | 2026-02-28 | 2026-03-12 | 5 | 709,459.46 | 5 | 260300696 | 2026-03-16 | 16 | 2026-03-19 | On time |
| 260100810 | 2026-02-24 | SPAREPART | 5017.0469 | CONTAC AUXILARY SIEMENS NC 3RH 2911 - 1HA22 | 260101104 | 127,000 | 260101104 | 2026-02-28 | 2026-03-05 | 20 | 127,000 | 4 | 260300108 | 2026-03-04 | 4 | 2026-03-12 | On time |
| 260100810 | 2026-02-24 | SPAREPART | 5017.047 | CONTACTOR SIEMENS 3RT2023 - 1BB40 | 260101104 | 678,000 | 260101104 | 2026-02-28 | 2026-03-05 | 20 | 678,000 | 4 | 260300108 | 2026-03-04 | 4 | 2026-03-12 | On time |
| 260100811 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2564 | PLAT BAJA STRIP 9.8X5.8X5400 MM | 260101168 | 252,252.25 | 260101168 | 2026-02-28 | 2026-03-09 | 1 | 252,252.25 | 4 | 260300246 | 2026-03-06 | 6 | 2026-03-16 | On time |
| 260100836 | 2026-02-24 | PERSEDIAAN UMUM | 6020.0371 | SAKLAR SERI SCHNEIDER VIVACE | 260101158 | 125,000 | 260101158 | 2026-02-28 | 2026-02-28 | 5 | 125,000 | 4 | 260300258 | 2026-03-06 | 6 | 2026-03-07 | On time |
| 260100838 | 2026-02-24 | BAHAN PEMBANTU | 20OT.0001 | PAC POWDER | 260400507 | 9,000 | 260101151 | 2026-02-28 | 2026-03-06 | 4,000 | 9,000 | 4 | 260300180 | 2026-03-05 | 5 | 2026-03-13 | On time |
| 260100838 | 2026-02-24 | BAHAN PEMBANTU | 20OT.0001 | PAC POWDER | 260400507 | 9,000 | 260101151 | 2026-02-28 | 2026-03-06 | 4,000 | 9,000 | 4 | 260300495 | 2026-03-12 | 12 | 2026-03-13 | On time |
| 260100840 | 2026-02-24 | BAHAN BAKU GLAZE | 1099.0007 | ENGOBE UNDER TILE WE-80 | 260600082 | 3,400 | 260101149 | 2026-02-28 | 2026-03-04 | 10,000 | 3,400 | 4 | 260300178 | 2026-03-05 | 5 | 2026-03-11 | On time |
| 260100841 | 2026-02-24 | BAHAN BAKU GLAZE | 1098.0006 | PS-8000 | 260600276 | 20,060.6 | 260101150 | 2026-02-28 | 2026-03-05 | 5,000 | 18,500.9 | 4 | 260300110 | 2026-03-04 | 4 | 2026-03-12 | On time |
| 260100844 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0004 | SEMEN GRESIK 40KG | 260500241 | 59,500 | 260101156 | 2026-02-28 | 2026-02-28 | 30 | 58,000 | 3 | 260300066 | 2026-03-04 | 4 | 2026-03-07 | On time |
| 260100852 | 2026-02-25 | SPAREPART | 5019.0006 | MOTOR 0.37KW 0.5HP 1460 RPM 380V FLANGE B5 | 260500136 | 875,000 | 260101167 | 2026-02-28 | 2026-03-11 | 2 | 875,000 | 3 | 260300141 | 2026-03-04 | 4 | 2026-03-18 | On time |
| 260100853 | 2026-02-25 | SPAREPART | 5025.0014 | SELENOID VALVE UNI D 220V | 260400291 | 355,000 | 260101114 | 2026-02-28 | 2026-03-12 | 8 | 355,000 | 3 | 260300079 | 2026-03-04 | 4 | 2026-03-19 | On time |
| 260100856 | 2026-02-25 | SPAREPART | 5020.0007 | ADAPTER H-2315 | 260101122 | 100,000 | 260101122 | 2026-02-28 | 2026-03-11 | 5 | 100,000 | 3 | 260300155 | 2026-03-04 | 4 | 2026-03-18 | On time |
| 260100857 | 2026-02-25 | SPAREPART | 5012.0202 | SEAL TC 45.65.7 | 260101117 | 9,000 | 260101117 | 2026-02-28 | 2026-03-12 | 15 | 9,000 | 3 | 260300267 | 2026-03-06 | 6 | 2026-03-19 | On time |
| 260100858 | 2026-02-25 | PERSEDIAAN UMUM | 6060.021 | MUR M 14 | 260500464 | 1,050 | 260101173 | 2026-02-28 | 2026-03-12 | 100 | 975 | 3 | 260300360 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100858 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0208 | MUR M 10 | 260500464 | 450 | 260101173 | 2026-02-28 | 2026-03-12 | 50 | 425 | 3 | 260300360 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100858 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0206 | MUR M 6 | 260500464 | 95 | 260101173 | 2026-02-28 | 2026-03-12 | 100 | 95 | 3 | 260300360 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100858 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0207 | MUR M 8 | 260500464 | 150 | 260101173 | 2026-02-28 | 2026-03-12 | 100 | 145 | 3 | 260300360 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100858 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0211 | MUR M 16 | 260500464 | 1,400 | 260101173 | 2026-02-28 | 2026-03-12 | 100 | 1,330 | 3 | 260300360 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100858 | 2026-02-25 | PERSEDIAAN UMUM | 6060.022 | MUR M 5 | 260400531 | 45 | 260101173 | 2026-02-28 | 2026-03-12 | 100 | 45 | 3 | 260300360 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100858 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0145 | MUR M 22 | 260300185 | 3,415 | 260101173 | 2026-02-28 | 2026-03-12 | 50 | 3,415 | 3 | 260300360 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100859 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0236 | RING PLAT M-10 | 260500464 | 145 | 260101174 | 2026-02-28 | 2026-03-12 | 150 | 145 | 3 | 260300359 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100859 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0235 | RING PLAT M-8 | 260500464 | 90 | 260101174 | 2026-02-28 | 2026-03-12 | 150 | 90 | 3 | 260300359 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100859 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0232 | RING PLAT M-4 | 260400531 | 60 | 260101174 | 2026-02-28 | 2026-03-12 | 100 | 60 | 3 | 260300359 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100859 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0234 | RING PLAT M-6 | 260500464 | 90 | 260101174 | 2026-02-28 | 2026-03-12 | 100 | 90 | 3 | 260300359 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100859 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0237 | RING PLAT M 12 | 260500464 | 260 | 260101174 | 2026-02-28 | 2026-03-12 | 150 | 260 | 3 | 260300359 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100859 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0239 | RING PLAT M-16 | 260500464 | 605 | 260101174 | 2026-02-28 | 2026-03-12 | 100 | 605 | 3 | 260300359 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100859 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0244 | RING PLAT M-20 | 260600169 | 1,210 | 260101174 | 2026-02-28 | 2026-03-12 | 50 | 1,210 | 3 | 260300359 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100860 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0027 | BAUT M-16*70 | 260101172 | 3,250 | 260101172 | 2026-02-28 | 2026-03-12 | 50 | 3,250 | 3 | 260300361 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100860 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0652 | BAUT M 8X20 | 260101172 | 315 | 260101172 | 2026-02-28 | 2026-03-12 | 100 | 315 | 3 | 260300361 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100860 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0087 | BAUT M 16 X 60 | 260600061 | 3,680 | 260101172 | 2026-02-28 | 2026-03-12 | 50 | 2,965 | 3 | 260300361 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100860 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0075 | BAUT M 6X20 | 260500465 | 215 | 260101172 | 2026-02-28 | 2026-03-12 | 100 | 175 | 3 | 260300361 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100860 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0008 | BAUT M-6*30 | 260500465 | 255 | 260101172 | 2026-02-28 | 2026-03-12 | 100 | 210 | 3 | 260300361 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100861 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0054 | BAUT L M 12*50 | 260400300 | 3,250 | 260101121 | 2026-02-28 | 2026-03-12 | 50 | 3,250 | 3 | 260300363 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100861 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0053 | BAUT L M 12X20 | 260400525 | 2,200 | 260101121 | 2026-02-28 | 2026-03-12 | 50 | 2,200 | 3 | 260300363 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100861 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0441 | BAUT L M 5X20 | 260600169 | 320 | 260101121 | 2026-02-28 | 2026-03-12 | 50 | 355 | 3 | 260300363 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100861 | 2026-02-25 | PERSEDIAAN UMUM | 6060.005 | BAUT L M 10X40 | 260500465 | 1,640 | 260101121 | 2026-02-28 | 2026-03-12 | 50 | 2,000 | 3 | 260300363 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100861 | 2026-02-25 | PERSEDIAAN UMUM | 6060.012 | BAUT L M 8X25 | 260400525 | 900 | 260101121 | 2026-02-28 | 2026-03-12 | 30 | 900 | 3 | 260300363 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100861 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0045 | BAUT L M 8*30 | 260400525 | 985 | 260101121 | 2026-02-28 | 2026-03-12 | 30 | 985 | 3 | 260300363 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100869 | 2026-02-25 | PERSEDIAAN UMUM | 6060.034 | SPEI 8 | 260400530 | 9,000 | 260101118 | 2026-02-28 | 2026-03-11 | 10 | 9,000 | 3 | 260300272 | 2026-03-06 | 6 | 2026-03-18 | On time |
| 260100872 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0056 | PENETRATING OIL ER 5711 | 260500455 | 54,500 | 260101119 | 2026-02-28 | 2026-03-07 | 36 | 49,500 | 3 | – | – | – | 2026-03-14 | Overdue |
| 260100872 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0056 | PENETRATING OIL ER 5711 | 260500455 | 54,500 | 260101119 | 2026-02-28 | 2026-03-07 | 36 | 49,500 | 3 | 260300087 | 2026-03-04 | 4 | 2026-03-14 | On time |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.1846 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=2,10 M | 260300097 | 179,200 | 260101157 | 2026-02-28 | 2026-02-28 | 8 | 179,200 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.1847 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=1,7 M | 260101157 | 145,066.67 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 145,066.67 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2757 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=0.9 M | 260101157 | 76,800 | 260101157 | 2026-02-28 | 2026-02-28 | 3 | 76,800 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2758 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=1.2 M | 260101157 | 102,400 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 102,400 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2759 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=1.5 M | 260101157 | 128,000 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 128,000 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.276 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=2 M | 260101157 | 170,666.67 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 170,666.67 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.1851 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=3,4 M | 260101157 | 290,133.33 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 290,133.33 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2678 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE= 1050 MM P= 2,6 M | 260101157 | 221,866.67 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 221,866.67 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.185 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=2,9 M | 260600067 | 338,137.39 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 247,466.67 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2761 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=2.3 M | 260101157 | 196,266.67 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 196,266.67 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2762 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=3.1 M | 260600067 | 361,457.21 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 264,533.33 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100879 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2763 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=3.6 M | 260101157 | 307,200 | 260101157 | 2026-02-28 | 2026-02-28 | 2 | 307,200 | 3 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100880 | 2026-02-25 | PERSEDIAAN UMUM | 6050.0298 | CHAIN LUBE | 260600169 | 39,100 | 260101120 | 2026-02-28 | 2026-03-12 | 8 | 39,100 | 3 | 260300362 | 2026-03-09 | 9 | 2026-03-19 | On time |
| 260100881 | 2026-02-25 | BAHAN BAKU GLAZE | 1070.0017 | SOLVENT (HARD) - CIK PL 0101 | 260300494 | 118,890 | 260101152 | 2026-02-28 | 2026-03-02 | 32 | 117,866 | 3 | 260300194 | 2026-03-05 | 5 | 2026-03-09 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300031 | 2026-03-03 | 3 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300544 | 2026-03-13 | 13 | 2026-03-12 | Late |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300376 | 2026-03-10 | 10 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300223 | 2026-03-06 | 6 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300445 | 2026-03-10 | 10 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300085 | 2026-03-04 | 4 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300329 | 2026-03-09 | 9 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300032 | 2026-03-03 | 3 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300183 | 2026-03-05 | 5 | 2026-03-12 | On time |
| 260100882 | 2026-02-26 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260101102 | 2026-02-28 | 2026-03-05 | 1,800,000 | 196 | 2 | 260300288 | 2026-03-07 | 7 | 2026-03-12 | On time |
| 260100885 | 2026-02-26 | SPAREPART | 5010.0054 | CLEANER HESCO 665 MOTOR CLEANER | 260101187 | 3,150,000 | 260101187 | 2026-02-28 | 2026-03-12 | 1 | 3,150,000 | 2 | 260300128 | 2026-03-04 | 4 | 2026-03-19 | On time |
| 260100885 | 2026-02-26 | SPAREPART | 5031.013 | LEM TIP TOP SC 2000 | 260300146 | 572,072.07 | 260101175 | 2026-02-28 | 2026-03-13 | 3 | 572,072.07 | 2 | 260300114 | 2026-03-04 | 4 | 2026-03-20 | On time |
| 260100887 | 2026-02-26 | PERSEDIAAN UMUM | 6030.0985 | BESI CNP 125 X 50 X 2.3 X 6000 MM | 260410178 | 328,828.83 | 260101155 | 2026-02-28 | 2026-02-28 | 20 | 315,315.32 | 2 | 260300213 | 2026-03-05 | 5 | 2026-03-07 | On time |
| 260100888 | 2026-02-26 | PERSEDIAAN UMUM | 6030.2767 | DR HOUZ LIST PLAFON COKLAT | 260101157 | 33,693.69 | 260101157 | 2026-02-28 | 2026-02-28 | 14 | 33,693.69 | 2 | 260300335 | 2026-03-09 | 9 | 2026-03-07 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101128 | 2026-02-28 | 2026-03-10 | 700 | 53,000 | 3 | 260400679 | 2026-04-20 | 51 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101128 | 2026-02-28 | 2026-03-10 | 700 | 53,000 | 3 | 260401161 | 2026-04-30 | 61 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101128 | 2026-02-28 | 2026-03-10 | 700 | 53,000 | 3 | 260300012 | 2026-03-02 | 2 | 2026-03-17 | On time |
| 260100897 | 2026-02-26 | BAHAN BAKAR | 4040.0002 | MEDITRAN S40 SAE 40 | 260600220 | 37,070.56 | 260101116 | 2026-02-28 | 2026-03-07 | 418 | 27,655.5 | 2 | 260300081 | 2026-03-04 | 4 | 2026-03-14 | On time |
| 260100897 | 2026-02-26 | BAHAN BAKAR | 4040.0002 | MEDITRAN S40 SAE 40 | 260600220 | 37,070.56 | 260101116 | 2026-02-28 | 2026-03-07 | 418 | 27,655.5 | 2 | – | – | – | 2026-03-14 | Overdue |
| 260100899 | 2026-02-26 | SPAREPART | 5011.0565 | BEARING 30209 | 260101113 | 140,000 | 260101113 | 2026-02-28 | 2026-03-10 | 4 | 140,000 | 2 | 260300149 | 2026-03-04 | 4 | 2026-03-17 | On time |
| 260100900 | 2026-02-26 | PERSEDIAAN UMUM | 6010.0361 | AIR MINERAL BOTOL 330 ML | 260101101 | 33,783.78 | 260101101 | 2026-02-28 | 2026-03-05 | 35 | 33,783.78 | 2 | 260102098 | 2026-02-28 | – | 2026-03-12 | On time |
| 260110093 | 2026-02-09 | FIXED ASSETS | AST02656 | LEMARI ARSIP/ DOKUMEN BESI FILLING CABINET | 260101100 | 2,720,000 | 260101100 | 2026-02-27 | 2026-03-09 | 1 | 2,720,000 | 18 | 260310224 | 2026-03-12 | 13 | 2026-03-16 | On time |
| 260110093 | 2026-02-09 | FIXED ASSETS | AST02657 | SAPPORO LOCKER KOLN 15 DOORS LIGHT TRAFFIC | 260101100 | 4,175,000 | 260101100 | 2026-02-27 | 2026-03-09 | 1 | 4,175,000 | 18 | 260310224 | 2026-03-12 | 13 | 2026-03-16 | On time |
| 260110132 | 2026-02-27 | FIXED ASSETS | AST02663 | ADD 1BAR WITH 11 PH TYPE MC FOR INFINITY SN DZ2500003 | 260110460 | 1,245,756,276 | 260110460 | 2026-02-27 | 2026-04-20 | 1 | 1,245,756,276 | – | 260510243 | 2026-05-12 | 74 | 2026-04-27 | Late |
| 251200016 | 2025-12-01 | SPAREPART | 5032.0863 | SWITCH NO 106 M371X-B3571 / 24V | 260101071 | 2,527,000 | 260101071 | 2026-02-26 | 2026-03-05 | 2 | 2,527,000 | 87 | 260501012 | 2026-05-30 | 93 | 2026-03-12 | Late |
| 251200016 | 2025-12-01 | SPAREPART | 5032.0863 | SWITCH NO 106 M371X-B3571 / 24V | 260101071 | 2,527,000 | 260101071 | 2026-02-26 | 2026-03-05 | 2 | 2,527,000 | 87 | 260300118 | 2026-03-04 | 6 | 2026-03-12 | On time |
| 251200016 | 2025-12-01 | SPAREPART | 5032.0604 | STATER ASSY NO () 32B66-00202 | 260101071 | 8,550,000 | 260101071 | 2026-02-26 | 2026-03-05 | 1 | 8,550,000 | 87 | 260300118 | 2026-03-04 | 6 | 2026-03-12 | On time |
| 251200129 | 2025-12-06 | FIXED ASSETS | AST02667 | AIR POWER PUMP | 260101091 | 7,200 | 260101091 | 2026-02-26 | 2026-05-30 | 2 | 7,200 | 82 | – | – | – | 2026-06-06 | Overdue |
| 260100571 | 2026-02-10 | PERSEDIAAN UMUM | 6010.0831 | REFIL TONER CATRIDGE DNA CB435A PRINTER HP P1006 | 260101072 | 1,500,000 | 260101072 | 2026-02-26 | 2026-03-05 | 2 | 1,500,000 | 16 | 260300097 | 2026-03-04 | 6 | 2026-03-12 | On time |
| 260100601 | 2026-02-12 | PERSEDIAAN UMUM | 6050.1353 | BATERAI LITIUM 2000MAH 24VOLT | 260400458 | 427,500 | 260101099 | 2026-02-26 | 2026-03-12 | 1 | 427,500 | 14 | 260300307 | 2026-03-07 | 9 | 2026-03-19 | On time |
| 260100601 | 2026-02-12 | PERSEDIAAN UMUM | 6050.1354 | BATTERAI UPS 12VOLT 9AH | 260101099 | 225,000 | 260101099 | 2026-02-26 | 2026-03-12 | 60 | 225,000 | 14 | 260300307 | 2026-03-07 | 9 | 2026-03-19 | On time |
| 260100615 | 2026-02-13 | PERSEDIAAN UMUM | 6020.0367 | CONVERTER HDMI TO VGA | 260101073 | 50,000 | 260101073 | 2026-02-26 | 2026-03-05 | 4 | 50,000 | 13 | 260300476 | 2026-03-11 | 13 | 2026-03-12 | On time |
| 260100615 | 2026-02-13 | PERSEDIAAN UMUM | 6020.0059 | MOUSE KOMPUTER | 260300511 | 54,054.05 | 260101073 | 2026-02-26 | 2026-03-05 | 3 | 55,000 | 13 | 260300476 | 2026-03-11 | 13 | 2026-03-12 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101086 | 2026-02-26 | 2026-03-05 | 100,000 | 1,550 | 8 | 260300113 | 2026-03-04 | 6 | 2026-03-12 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260101086 | 2026-02-26 | 2026-03-05 | 100,000 | 1,550 | 8 | 260300319 | 2026-03-09 | 11 | 2026-03-12 | On time |
| 260100742 | 2026-02-20 | SPAREPART | 5011.0563 | BEARING SKF 62201 2RS C3 | 260101094 | 129,000 | 260101094 | 2026-02-26 | 2026-03-09 | 20 | 129,000 | 6 | – | – | – | 2026-03-16 | Overdue |
| 260100742 | 2026-02-20 | SPAREPART | 5011.0563 | BEARING SKF 62201 2RS C3 | 260101094 | 129,000 | 260101094 | 2026-02-26 | 2026-03-09 | 20 | 129,000 | 6 | 260300546 | 2026-03-13 | 15 | 2026-03-16 | On time |
| 260100754 | 2026-02-20 | SPAREPART | 5029.0494 | GATE VALVE 1 1/4 INCH | 260101096 | 369,369.37 | 260101096 | 2026-02-26 | 2026-02-26 | 10 | 369,369.37 | 6 | 260300092 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100754 | 2026-02-20 | SPAREPART | 5029.0494 | GATE VALVE 1 1/4 INCH | 260101096 | 369,369.37 | 260101096 | 2026-02-26 | 2026-02-26 | 10 | 369,369.37 | 6 | – | – | – | 2026-03-05 | Overdue |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2737 | NEPEL SELANG 3/4X1/2 INCH | 260101096 | 42,252.25 | 260101096 | 2026-02-26 | 2026-02-26 | 50 | 42,252.25 | 6 | 260300092 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2737 | NEPEL SELANG 3/4X1/2 INCH | 260101096 | 42,252.25 | 260101096 | 2026-02-26 | 2026-02-26 | 50 | 42,252.25 | 6 | – | – | – | 2026-03-05 | Overdue |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2733 | STANG BLANDER POTONG MK-100 RRT | 260101096 | 765,765.77 | 260101096 | 2026-02-26 | 2026-02-26 | 2 | 765,765.77 | 6 | – | – | – | 2026-03-05 | Overdue |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2733 | STANG BLANDER POTONG MK-100 RRT | 260101096 | 765,765.77 | 260101096 | 2026-02-26 | 2026-02-26 | 2 | 765,765.77 | 6 | 260300092 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2736 | KAWAT LAS MIG Ø 1.2 MM | 260300069 | 24,324.32 | 260101096 | 2026-02-26 | 2026-02-26 | 120 | 24,324.32 | 6 | 260300092 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2736 | KAWAT LAS MIG Ø 1.2 MM | 260300069 | 24,324.32 | 260101096 | 2026-02-26 | 2026-02-26 | 120 | 24,324.32 | 6 | – | – | – | 2026-03-05 | Overdue |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2736 | KAWAT LAS MIG Ø 1.2 MM | 260300069 | 24,324.32 | 260101096 | 2026-02-26 | 2026-02-26 | 120 | 24,324.32 | 6 | 260102071 | 2026-02-27 | 1 | 2026-03-05 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2732 | RESIBON TEBAL 7 INCH 180X6X22 | 260101096 | 28,783.78 | 260101096 | 2026-02-26 | 2026-02-26 | 25 | 28,783.78 | 6 | 260300136 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100771 | 2026-02-23 | FIXED ASSETS | AST02670 | LAPTOP LENOVO I3 RAM 8GB SSD 512 GB | 260101055 | 6,950,000 | 260101055 | 2026-02-26 | 2026-03-05 | 1 | 6,950,000 | 3 | 260300890 | 2026-03-27 | 29 | 2026-03-12 | Late |
| 260100771 | 2026-02-23 | FIXED ASSETS | AST02668 | LAPTOP LENOVO I3 RAM 8GB SSD 512 GB | 260101055 | 6,750,000 | 260101055 | 2026-02-26 | 2026-03-05 | 1 | 6,750,000 | 3 | 260300890 | 2026-03-27 | 29 | 2026-03-12 | Late |
| 260100771 | 2026-02-23 | FIXED ASSETS | AST02669 | LAPTOP LENOVO I3 RAM 8GB SSD 512 GB | 260101055 | 6,950,000 | 260101055 | 2026-02-26 | 2026-03-05 | 1 | 6,950,000 | 3 | 260300890 | 2026-03-27 | 29 | 2026-03-12 | Late |
| 260100771 | 2026-02-23 | FIXED ASSETS | AST02672 | LAPTOP LENOVO I3 RAM 8GB SSD 512 GB | 260101055 | 6,850,000 | 260101055 | 2026-02-26 | 2026-03-05 | 1 | 6,850,000 | 3 | 260300890 | 2026-03-27 | 29 | 2026-03-12 | Late |
| 260100771 | 2026-02-23 | FIXED ASSETS | AST02671 | LAPTOP LENOVO I3 RAM 8GB SSD 512 GB | 260101074 | 6,400,000 | 260101074 | 2026-02-26 | 2026-03-05 | 1 | 6,400,000 | 3 | 260300840 | 2026-03-22 | 24 | 2026-03-12 | Late |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 69,300 | 1,118 | 6 | 260300387 | 2026-03-10 | 12 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 69,300 | 1,118 | 6 | 260401103 | 2026-04-29 | 62 | 2026-04-10 | Late |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 50,400 | 1,118 | 6 | 260300772 | 2026-03-17 | 19 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 18,900 | 1,118 | 6 | 260300509 | 2026-03-12 | 14 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 69,300 | 1,118 | 6 | 260300772 | 2026-03-17 | 19 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 50,400 | 1,118 | 6 | 260300387 | 2026-03-10 | 12 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 50,400 | 1,118 | 6 | 260300460 | 2026-03-11 | 13 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0036 | BOX KOBIN HITAM TS 40*40 KW III | 260600120 | 1,275 | 260101077 | 2026-02-26 | 2026-03-13 | 39,900 | 1,150 | 6 | 260300390 | 2026-03-10 | 12 | 2026-03-20 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0036 | BOX KOBIN HITAM TS 40*40 KW III | 260600120 | 1,275 | 260101077 | 2026-02-26 | 2026-03-13 | 39,900 | 1,150 | 6 | 260300301 | 2026-03-07 | 9 | 2026-03-20 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0036 | BOX KOBIN HITAM TS 40*40 KW III | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 6,300 | 1,118 | 6 | 260300615 | 2026-03-14 | 16 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0028 | BOX KOBIN HIJAU TS 40*40 KW II | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 10,500 | 1,118 | 6 | 260300615 | 2026-03-14 | 16 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0071 | BOX MY TS 40*40 KW 1 | 260500474 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 52,500 | 1,118 | 6 | 260300690 | 2026-03-16 | 18 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0071 | BOX MY TS 40*40 KW 1 | 260500474 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 52,500 | 1,118 | 6 | 260300509 | 2026-03-12 | 14 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0032 | BOX PARIS MERAH TS 40*40 KW I | 260500474 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 29,400 | 1,118 | 6 | 260300509 | 2026-03-12 | 14 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.003 | BOX JUPITER MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260101077 | 2026-02-26 | 2026-03-13 | 21,000 | 1,150 | 6 | 260300965 | 2026-03-30 | 32 | 2026-03-20 | Late |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0032 | BOX PARIS MERAH TS 40*40 KW I | 260500474 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 29,400 | 1,118 | 6 | 260300772 | 2026-03-17 | 19 | 2026-04-10 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.003 | BOX JUPITER MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260101077 | 2026-02-26 | 2026-03-13 | 21,000 | 1,150 | 6 | 260300390 | 2026-03-10 | 12 | 2026-03-20 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.003 | BOX JUPITER MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260101056 | 2026-02-26 | 2026-04-03 | 18,900 | 1,118 | 6 | 260300463 | 2026-03-11 | 13 | 2026-04-10 | On time |
| 260100798 | 2026-02-23 | FIXED ASSETS | AST02329 | REFLECTOR AC UK 29.5*120CM VOZA LT28 | 260101098 | 460,000 | 260101098 | 2026-02-26 | 2026-03-12 | 2 | 460,000 | 3 | – | – | – | 2026-03-19 | Overdue |
| 260100800 | 2026-02-20 | SPAREPART | 5017.0519 | LAMPU PHILIPS BRP 132 LED 140 W | 260500216 | 2,400,000 | 260101089 | 2026-02-26 | 2026-02-26 | 27 | 2,400,000 | 6 | 260300157 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100800 | 2026-02-20 | SPAREPART | 5017.0519 | LAMPU PHILIPS BRP 132 LED 140 W | 260500216 | 2,400,000 | 260101089 | 2026-02-26 | 2026-02-26 | 27 | 2,400,000 | 6 | – | – | – | 2026-03-05 | Overdue |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0044 | V. BELT B - 64 | 260500468 | 51,050 | 260101095 | 2026-02-26 | 2026-03-09 | 6 | 46,500 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0041 | V. BELT B - 60 | 260101176 | 43,600 | 260101095 | 2026-02-26 | 2026-03-09 | 6 | 43,600 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0104 | V. BELT B - 196 | 260101095 | 142,300 | 260101095 | 2026-02-26 | 2026-03-09 | 10 | 142,300 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0036 | V. BELT B - 50 | 260500209 | 39,900 | 260101095 | 2026-02-26 | 2026-03-09 | 6 | 36,300 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0104 | V. BELT B - 196 | 260101095 | 142,300 | 260101095 | 2026-02-26 | 2026-03-09 | 10 | 142,300 | 3 | 260300521 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0037 | V. BELT B - 53 | 260101176 | 38,500 | 260101095 | 2026-02-26 | 2026-03-09 | 6 | 38,500 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0127 | V. BELT B - 270 | 260300499 | 206,500 | 260101095 | 2026-02-26 | 2026-03-09 | 16 | 206,500 | 3 | 260400812 | 2026-04-22 | 55 | 2026-03-16 | Late |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0138 | V. BELT C - 122 | 260101095 | 164,400 | 260101095 | 2026-02-26 | 2026-03-09 | 8 | 164,400 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0127 | V. BELT B - 270 | 260300499 | 206,500 | 260101095 | 2026-02-26 | 2026-03-09 | 16 | 206,500 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0125 | V. BELT B - 260 | 260101095 | 198,800 | 260101095 | 2026-02-26 | 2026-03-09 | 12 | 198,800 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0125 | V. BELT B - 260 | 260101095 | 198,800 | 260101095 | 2026-02-26 | 2026-03-09 | 12 | 198,800 | 3 | 260400812 | 2026-04-22 | 55 | 2026-03-16 | Late |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0145 | V. BELT C - 177 | 260101176 | 238,600 | 260101095 | 2026-02-26 | 2026-03-09 | 4 | 238,600 | 3 | 260300521 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260100804 | 2026-02-23 | SPAREPART | 5021.0143 | V. BELT C - 150 | 260101176 | 202,200 | 260101095 | 2026-02-26 | 2026-03-09 | 8 | 202,200 | 3 | 260300153 | 2026-03-04 | 6 | 2026-03-16 | On time |
| 260100835 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2747 | STOP KONTAK 3 PHASA LEGRAND 16 A | 260500277 | 651,000 | 260101085 | 2026-02-26 | 2026-02-26 | 25 | 651,000 | 2 | 260102052 | 2026-02-27 | 1 | 2026-03-05 | On time |
| 260100842 | 2026-02-25 | FIXED ASSETS | AST02329 | REFLECTOR AC UK 29.5*120CM VOZA LT28 | 260101098 | 460,000 | 260101098 | 2026-02-26 | 2026-03-12 | 1 | 460,000 | 1 | – | – | – | 2026-03-19 | Overdue |
| 260100876 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0804 | AVIAN CLING SYNTHETIC 91 - KERAK ABU | 260300369 | 45,905.25 | 260101097 | 2026-02-26 | 2026-02-26 | 10 | 45,905.41 | 1 | 260300139 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100876 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0917 | THINER A BIASA | 260500403 | 63,500 | 260101097 | 2026-02-26 | 2026-02-26 | 10 | 26,505.05 | 1 | 260300139 | 2026-03-04 | 6 | 2026-03-05 | On time |
| 260100881 | 2026-02-25 | BAHAN BAKU GLAZE | 1070.0017 | SOLVENT (HARD) - CIK PL 0101 | 260300494 | 118,890 | 260101075 | 2026-02-26 | 2026-02-27 | 32 | 117,866 | 1 | 260102058 | 2026-02-27 | 1 | 2026-03-06 | On time |
| 260100884 | 2026-02-26 | BAHAN BAKAR | 4030.001 | DAPHNE SUPER HYDRO 46 (IDEMITSU) | 260600224 | 62,250 | 260101088 | 2026-02-26 | 2026-03-06 | 400 | 41,500 | – | 260102061 | 2026-02-27 | 1 | 2026-03-13 | On time |
| 260100884 | 2026-02-26 | BAHAN BAKAR | 4050.0014 | SUPER GEAR OIL DAPHNE SUPER GEAR OIL 320 (IDEMITSU) | 260600094 | 70,750 | 260101088 | 2026-02-26 | 2026-03-06 | 200 | 48,750 | – | 260102061 | 2026-02-27 | 1 | 2026-03-13 | On time |
| 260100886 | 2026-02-26 | PERSEDIAAN UMUM | 6050.0133 | REFIL PEMADAM 6 KG DCP | 260101093 | 150,000 | 260101093 | 2026-02-26 | 2026-03-06 | 37 | 150,000 | – | 260300888 | 2026-03-27 | 29 | 2026-03-13 | Late |
| 260100886 | 2026-02-26 | PERSEDIAAN UMUM | 6050.0132 | REFIL PEMADAM 4.5 KG DCP | 260101093 | 100,000 | 260101093 | 2026-02-26 | 2026-03-06 | 22 | 100,000 | – | 260300888 | 2026-03-27 | 29 | 2026-03-13 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101092 | 2026-02-26 | 2026-03-10 | 700 | 58,000 | 1 | 260400969 | 2026-04-27 | 60 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101092 | 2026-02-26 | 2026-03-10 | 700 | 58,000 | 1 | 260400744 | 2026-04-21 | 54 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101092 | 2026-02-26 | 2026-03-10 | 700 | 58,000 | 1 | 260400653 | 2026-04-18 | 51 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101092 | 2026-02-26 | 2026-03-10 | 700 | 58,000 | 1 | 260400297 | 2026-04-09 | 42 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101092 | 2026-02-26 | 2026-03-10 | 700 | 58,000 | 1 | 260400395 | 2026-04-11 | 44 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101087 | 2026-02-26 | 2026-03-10 | 600 | 53,000 | 1 | 260600295 | 2026-06-09 | 103 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101087 | 2026-02-26 | 2026-03-10 | 600 | 53,000 | 1 | 260400947 | 2026-04-25 | 58 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101087 | 2026-02-26 | 2026-03-10 | 600 | 53,000 | 1 | 260400167 | 2026-04-07 | 40 | 2026-03-17 | Late |
| 260100889 | 2026-02-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260101087 | 2026-02-26 | 2026-03-10 | 600 | 53,000 | 1 | 260600221 | 2026-06-06 | 100 | 2026-03-17 | Late |
| 260110004 | 2026-01-05 | PERSEDIAAN UMUM | 6050.1258 | TAMBANG DADUNG 13MM | 260110453 | 11,547.97 | 260110453 | 2026-02-26 | 2026-03-09 | 100 | 11,547.97 | 52 | 260310218 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260110004 | 2026-01-05 | PERSEDIAAN UMUM | 6050.1243 | SELANG BLENDER | 260510224 | 17,500 | 260110454 | 2026-02-26 | 2026-03-09 | 200 | 18,450 | 52 | 260310217 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260110035 | 2026-01-19 | PERSEDIAAN UMUM | 6030.2587 | SIPATAN TAJIMA | 260110452 | 280,000 | 260110452 | 2026-02-26 | 2026-03-09 | 5 | 280,000 | 38 | 260310216 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260110035 | 2026-01-19 | PERSEDIAAN UMUM | 6050.0692 | CUTTING DISC 14 INCH | 260110458 | 896,675 | 260110458 | 2026-02-26 | 2026-03-09 | 3 | 896,675 | 38 | 260310220 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260110035 | 2026-01-19 | PERSEDIAAN UMUM | 6060.0105 | BAUT DYNA BOLT() M 16X100 MM | 260110456 | 8,550 | 260110456 | 2026-02-26 | 2026-03-09 | 100 | 8,550 | 38 | 260310215 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260110077 | 2026-02-04 | SPAREPART | 5023.152 | RUBBER CONVEYOR BELT B1000 X 6 LAYERS X 10MM THICK | 260110446 | 442,000 | 260110446 | 2026-02-26 | 2026-03-07 | 19 | 442,000 | 22 | 260111182 | 2026-02-27 | 1 | 2026-03-14 | On time |
| 260110079 | 2026-02-04 | PERSEDIAAN UMUM | 6050.1329 | WHEEL CHOCK RUBBER BESAR TRUCK ANTI SLIP 40 TON | 260110455 | 252,502 | 260110455 | 2026-02-26 | 2026-03-09 | 4 | 252,502 | 22 | 260310219 | 2026-03-12 | 14 | 2026-03-16 | On time |
| 260110096 | 2026-02-10 | SPAREPART | 5027.0462 | WATERJET NOZZLE 0.36 | 260110461 | 0 | 260110461 | 2026-02-26 | 2026-03-16 | 10 | 0 | 16 | – | – | – | 2026-03-23 | Overdue |
| 260110096 | 2026-02-10 | SPAREPART | 5027.0419 | WATERJET NOZZLE 0.52 | 260110461 | 0 | 260110461 | 2026-02-26 | 2026-03-16 | 15 | 0 | 16 | – | – | – | 2026-03-23 | Overdue |
| 260110096 | 2026-02-10 | SPAREPART | 5027.0461 | WATERJET NOZZLE 0.62 | 260110461 | 0 | 260110461 | 2026-02-26 | 2026-03-16 | 10 | 0 | 16 | – | – | – | 2026-03-23 | Overdue |
| 260110096 | 2026-02-10 | SPAREPART | 5027.0418 | WATERJET NOZZLE 0.43 | 260110461 | 0 | 260110461 | 2026-02-26 | 2026-03-16 | 15 | 0 | 16 | – | – | – | 2026-03-23 | Overdue |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0274 | CARTON BOX DLG NEW DESIGN PARIS 60X60 MP2 KWA 605X38 (BK150/125/125) | 260110459 | 531 | 260110459 | 2026-02-26 | 2026-02-26 | 121,800 | 531 | 3 | 260310150 | 2026-03-09 | 11 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0273 | CARTON BOX DLG NEW DESIGN PARIS 60X60 MP1 KWA 605X40 (BK150/125/125) | 260110459 | 557 | 260110459 | 2026-02-26 | 2026-02-26 | 121,800 | 557 | 3 | 260310150 | 2026-03-09 | 11 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0273 | CARTON BOX DLG NEW DESIGN PARIS 60X60 MP1 KWA 605X40 (BK150/125/125) | 260110459 | 557 | 260110459 | 2026-02-26 | 2026-02-26 | 121,800 | 557 | 3 | 260310151 | 2026-03-09 | 11 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0273 | CARTON BOX DLG NEW DESIGN PARIS 60X60 MP1 KWA 605X40 (BK150/125/125) | 260110459 | 557 | 260110459 | 2026-02-26 | 2026-02-26 | 121,800 | 557 | 3 | 260310152 | 2026-03-09 | 11 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260510225 | 580 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 531 | 3 | 260310188 | 2026-03-11 | 13 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260510225 | 580 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 531 | 3 | 260310246 | 2026-03-12 | 14 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0274 | CARTON BOX DLG NEW DESIGN PARIS 60X60 MP2 KWA 605X38 (BK150/125/125) | 260110459 | 531 | 260110459 | 2026-02-26 | 2026-02-26 | 121,800 | 531 | 3 | 260310151 | 2026-03-09 | 11 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0274 | CARTON BOX DLG NEW DESIGN PARIS 60X60 MP2 KWA 605X38 (BK150/125/125) | 260110459 | 531 | 260110459 | 2026-02-26 | 2026-02-26 | 121,800 | 531 | 3 | 260310152 | 2026-03-09 | 11 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260510225 | 610 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 557 | 3 | 260310187 | 2026-03-11 | 13 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260510225 | 580 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 531 | 3 | 260310247 | 2026-03-12 | 14 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260510225 | 580 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 531 | 3 | 260410267 | 2026-04-15 | 48 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260510225 | 580 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 531 | 3 | 260310187 | 2026-03-11 | 13 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260510225 | 610 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 557 | 3 | 260310247 | 2026-03-12 | 14 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260510225 | 610 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 557 | 3 | 260310262 | 2026-03-13 | 15 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260510225 | 610 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 557 | 3 | 260310246 | 2026-03-12 | 14 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260510225 | 610 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 557 | 3 | 260310188 | 2026-03-11 | 13 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260510225 | 610 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 557 | 3 | 260410267 | 2026-04-15 | 48 | 2026-03-05 | Late |
| 260110126 | 2026-02-23 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260510225 | 580 | 260110459 | 2026-02-26 | 2026-02-26 | 205,800 | 531 | 3 | 260310262 | 2026-03-13 | 15 | 2026-03-05 | Late |
| 260110127 | 2026-02-24 | PERSEDIAAN UMUM | 6020.0035 | BATERAI AA | 260110450 | 5,500 | 260110450 | 2026-02-26 | 2026-03-09 | 24 | 5,500 | 2 | 260310071 | 2026-03-05 | 7 | 2026-03-16 | On time |
| 260110127 | 2026-02-24 | PERSEDIAAN UMUM | 6050.0045 | MAJUN WARNA | 260500441 | 8,200 | 260110451 | 2026-02-26 | 2026-03-09 | 200 | 5,800 | 2 | 260310070 | 2026-03-05 | 7 | 2026-03-16 | On time |
| 260110127 | 2026-02-24 | PERSEDIAAN UMUM | 6050.0938 | LEM AICA AIBON (KEMASAN 300GRAM) | 260510179 | 56,000 | 260110451 | 2026-02-26 | 2026-03-09 | 10 | 49,000 | 2 | 260310070 | 2026-03-05 | 7 | 2026-03-16 | On time |
| 260110128 | 2026-02-24 | PERSEDIAAN UMUM | 6050.1156 | SABUN CUCI PIRING @5KG | 260610116 | 81,700 | 260110457 | 2026-02-26 | 2026-02-26 | 4 | 55,100 | 2 | 260310034 | 2026-03-03 | 5 | 2026-03-05 | On time |
| 251100385 | 2025-11-25 | SPAREPART | 5026.0242 | PRINT HEAD CLEANER | 260101054 | 5,000 | 260101054 | 2026-02-25 | 2026-03-30 | 1 | 5,000 | 92 | 260500755 | 2026-05-22 | 86 | 2026-04-06 | Late |
| 251100385 | 2025-11-25 | SPAREPART | 5026.0241 | PRINT HEAD TESTER COMPATIBLE WITH DIMATIX 1024 | 260101054 | 12,688 | 260101054 | 2026-02-25 | 2026-03-30 | 1 | 12,688 | 92 | 260500755 | 2026-05-22 | 86 | 2026-04-06 | Late |
| 251200379 | 2025-12-22 | PERSEDIAAN UMUM | 6030.2673 | PIPA GALVANIS 3 INCH SNI MEDIUM A SPINDO | 260500076 | 515,315.32 | 260101040 | 2026-02-25 | 2026-03-11 | 30 | 1,009,009.01 | 65 | 260102099 | 2026-02-28 | 3 | 2026-03-18 | On time |
| 260100296 | 2026-01-23 | SPAREPART | 5031.0573 | GLAZE VIBRATING SIEVE OD 1200 MM | 260101076 | 1,160 | 260101076 | 2026-02-25 | 2026-03-30 | 1 | 1,160 | 33 | 260400962 | 2026-04-25 | 59 | 2026-04-06 | Late |
| 260100402 | 2026-01-28 | SPAREPART | 5030.1367 | KARET VACUM PUTIH T 20 MM OD 30 MM LUBANG ANGIN 8 MM | 260101043 | 40,000 | 260101043 | 2026-02-25 | 2026-03-20 | 50 | 40,000 | 28 | 260500888 | 2026-05-28 | 92 | 2026-03-27 | Late |
| 260100495 | 2026-02-04 | PERSEDIAAN UMUM | 6030.2143 | SQUATING TOILET CE 7 | 260500354 | 241,000 | 260101081 | 2026-02-25 | 2026-02-25 | 1 | 241,000 | 21 | 260300400 | 2026-03-10 | 13 | 2026-03-04 | Late |
| 260100528 | 2026-02-09 | SPAREPART | 5019.0013 | GEAR REDUCER MNRV 040 RATIO 1:10 FLANGE B14 | 260101044 | 2,312,500 | 260101044 | 2026-02-25 | 2026-03-10 | 2 | 2,312,500 | 16 | 260102073 | 2026-02-27 | 2 | 2026-03-17 | On time |
| 260100528 | 2026-02-09 | SPAREPART | 5022.0117 | GEAR REDUCER MNRV 050 RATIO 1:7.5 B5 DAYA 0.37 KW | 260101044 | 3,062,500 | 260101044 | 2026-02-25 | 2026-03-10 | 2 | 3,062,500 | 16 | 260102073 | 2026-02-27 | 2 | 2026-03-17 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0011 | PARAMEX | 260500081 | 750 | 260101065 | 2026-02-25 | 2026-03-11 | 24 | 750 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0008 | MINYAK KAYU PUTIH | 260600176 | 24,500 | 260101065 | 2026-02-25 | 2026-03-11 | 6 | 24,500 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.001 | INSTO | 260500081 | 17,000 | 260101065 | 2026-02-25 | 2026-03-11 | 6 | 17,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0002 | BETADINE | 260600176 | 19,000 | 260101065 | 2026-02-25 | 2026-03-11 | 3 | 19,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0041 | HANSAPLAST ROLL 1.25 CM X 5 M | 260600176 | 16,000 | 260101065 | 2026-02-25 | 2026-03-11 | 3 | 16,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0004 | HANSAPLAST (ok) | 260600176 | 40,000 | 260101065 | 2026-02-25 | 2026-03-11 | 1 | 40,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0001 | BALSEM | 260500081 | 12,000 | 260101065 | 2026-02-25 | 2026-03-11 | 2 | 12,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0009 | MINYAK TAWON | 260500081 | 28,000 | 260101065 | 2026-02-25 | 2026-03-11 | 2 | 28,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0025 | NEOZEP | 260500081 | 1,000 | 260101065 | 2026-02-25 | 2026-03-11 | 24 | 1,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | PERSEDIAAN UMUM | 6040.0058 | IMBOOST | 260101065 | 44,000 | 260101065 | 2026-02-25 | 2026-03-11 | 12 | 44,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | PERSEDIAAN UMUM | 6040.0057 | VITAMIN C | 260500081 | 3,000 | 260101065 | 2026-02-25 | 2026-03-11 | 12 | 3,000 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0021 | PARACETAMOL | 260600176 | 3,500 | 260101065 | 2026-02-25 | 2026-03-11 | 20 | 3,500 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0024 | ULTRAFLU | 260500081 | 1,125 | 260101065 | 2026-02-25 | 2026-03-11 | 24 | 1,125 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0018 | KOMIX | 260500081 | 2,333.33 | 260101065 | 2026-02-25 | 2026-03-11 | 30 | 2,333.33 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0013 | ANTANGIN | 260500081 | 3,916.67 | 260101065 | 2026-02-25 | 2026-03-11 | 36 | 3,916.67 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0042 | ASAM MEFENAMAT | 260500081 | 400 | 260101065 | 2026-02-25 | 2026-03-11 | 20 | 400 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0032 | PANADOL BIRU | 260500081 | 1,400 | 260101065 | 2026-02-25 | 2026-03-11 | 60 | 1,400 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100558 | 2026-02-06 | SUPPLIES | 6040.0015 | PROMAG | 260600176 | 1,050 | 260101065 | 2026-02-25 | 2026-03-11 | 30 | 1,050 | 19 | 260300539 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100564 | 2026-02-09 | SPAREPART | 5026.0071 | POMPA A DOPPIA MEMBRANA KNF PM26301-NMP 850.1.2 || 9663000107 | 260101053 | 432.8 | 260101053 | 2026-02-25 | 2026-06-30 | 3 | 432.8 | 16 | – | – | – | 2026-07-07 | Outstanding |
| 260100564 | 2026-02-09 | SPAREPART | 5027.0281 | POMPA (REFILL PUMP) PL 8514-NF 60 KTDC B 4 FILI 9680020083 | 260400064 | 15,070,089 | 260101053 | 2026-02-25 | 2026-06-30 | 3 | 445.1 | 16 | – | – | – | 2026-07-07 | Outstanding |
| 260100564 | 2026-02-09 | SPAREPART | 5026.0105 | HYDRAULIC PUMP PM35077-815 KNF 9680020084 | 260101053 | 363 | 260101053 | 2026-02-25 | 2026-06-30 | 1 | 363 | 16 | – | – | – | 2026-07-07 | Outstanding |
| 260100613 | 2026-02-12 | PERSEDIAAN UMUM | 6030.1756 | PLASTIK COR | 260101080 | 50,000 | 260101080 | 2026-02-25 | 2026-02-25 | 7 | 50,000 | 13 | 260102068 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100617 | 2026-02-13 | PERSEDIAAN UMUM | 6030.0894 | BAUT MUR M 10X50 MM | 260300535 | 1,100 | 260101038 | 2026-02-25 | 2026-02-25 | 180 | 1,000 | 12 | 260300353 | 2026-03-09 | 12 | 2026-03-04 | Late |
| 260100623 | 2026-02-13 | PERSEDIAAN UMUM | 6030.2719 | ELBOW 90 CARBON STELL 10 INCH SCH 40 | 260300227 | 990,990.99 | 260101039 | 2026-02-25 | 2026-02-25 | 6 | 990,990.99 | 12 | 260300093 | 2026-03-04 | 7 | 2026-03-04 | On time |
| 260100623 | 2026-02-13 | PERSEDIAAN UMUM | 6030.2719 | ELBOW 90 CARBON STELL 10 INCH SCH 40 | 260300227 | 990,990.99 | 260101039 | 2026-02-25 | 2026-02-25 | 6 | 990,990.99 | 12 | – | – | – | 2026-03-04 | Overdue |
| 260100624 | 2026-02-13 | SPAREPART | 5021.0262 | T. BELT 1345 H | 260101066 | 222,300 | 260101066 | 2026-02-25 | 2026-03-11 | 10 | 222,300 | 12 | 260300850 | 2026-03-26 | 29 | 2026-03-18 | Late |
| 260100653 | 2026-02-16 | SPAREPART | 5019.0014 | MOTOR 0.37 KW 220 V/380V FLANGE MOUNTING B14 | 260500136 | 875,000 | 260101047 | 2026-02-25 | 2026-03-16 | 2 | 875,000 | 9 | 260300146 | 2026-03-04 | 7 | 2026-03-23 | On time |
| 260100653 | 2026-02-16 | SPAREPART | 5019.0045 | MOTOR 3 PHASE B5 0.75 KW 1HP 1460 RPM 220/380 V FLANGE MOUNTING | 260101047 | 1,187,500 | 260101047 | 2026-02-25 | 2026-03-16 | 2 | 1,187,500 | 9 | 260300146 | 2026-03-04 | 7 | 2026-03-23 | On time |
| 260100653 | 2026-02-16 | SPAREPART | 5030.067 | MOTOR 0.75 KW 1 HP 1460 RPM 380 V B14 | 260500136 | 1,187,500 | 260101047 | 2026-02-25 | 2026-03-16 | 2 | 1,187,500 | 9 | 260300146 | 2026-03-04 | 7 | 2026-03-23 | On time |
| 260100653 | 2026-02-16 | SPAREPART | 5019.0072 | GEAR REDUCER MNRV 050 RATIO 1:15 FLANGE 0.37KW B.5 | 260500193 | 3,062,500 | 260101047 | 2026-02-25 | 2026-03-16 | 2 | 3,062,500 | 9 | 260300146 | 2026-03-04 | 7 | 2026-03-23 | On time |
| 260100653 | 2026-02-16 | SPAREPART | 5019.0111 | GEAR REDUCER MNRV 063 R 1:30 (FLANGE 0.75 KW B14) | 260500193 | 4,500,000 | 260101047 | 2026-02-25 | 2026-03-16 | 2 | 4,500,000 | 9 | 260300146 | 2026-03-04 | 7 | 2026-03-23 | On time |
| 260100662 | 2026-02-16 | SPAREPART | 5011.0562 | BEARING 6412 RS | 260101064 | 678,500 | 260101064 | 2026-02-25 | 2026-03-11 | 4 | 678,500 | 9 | 260300150 | 2026-03-04 | 7 | 2026-03-18 | On time |
| 260100672 | 2026-02-16 | SPAREPART | 5014.0027 | MESH 250 | 260101042 | 200,000 | 260101042 | 2026-02-25 | 2026-03-16 | 4 | 200,000 | 9 | 260300519 | 2026-03-12 | 15 | 2026-03-23 | On time |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6060.0239 | RING PLAT M-16 | 260500464 | 605 | 260101038 | 2026-02-25 | 2026-02-25 | 100 | 605 | 7 | 260300353 | 2026-03-09 | 12 | 2026-03-04 | Late |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6060.0504 | BAUT M16X70MM FULL DRAT (BAUT BAJA/HITAM) | 260101038 | 5,000 | 260101038 | 2026-02-25 | 2026-02-25 | 100 | 5,000 | 7 | 260300353 | 2026-03-09 | 12 | 2026-03-04 | Late |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6030.2158 | ELBOW 1/2 INCH X 10MM | 260101038 | 26,500 | 260101038 | 2026-02-25 | 2026-02-25 | 10 | 26,500 | 7 | 260300353 | 2026-03-09 | 12 | 2026-03-04 | Late |
| 260100722 | 2026-02-19 | SPAREPART | 5030.052 | REED SWITCH SMC D-A93 | 260101067 | 221,000 | 260101067 | 2026-02-25 | 2026-03-14 | 10 | 221,000 | 6 | 260300202 | 2026-03-05 | 8 | 2026-03-21 | On time |
| 260100740 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0243 | ACCU / BATTERAY N-120 | 260300048 | 2,230,000 | 260101063 | 2026-02-25 | 2026-03-07 | 1 | 2,230,000 | 5 | 260400526 | 2026-04-15 | 49 | 2026-03-14 | Late |
| 260100746 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0174 | GEMBOK 30MM | 260101062 | 15,000 | 260101062 | 2026-02-25 | 2026-03-02 | 3 | 15,000 | 5 | 260102070 | 2026-02-27 | 2 | 2026-03-09 | On time |
| 260100747 | 2026-02-20 | SPAREPART | 5032.0022 | DISC CLUTH FL MITSUBISHI EX CLUTCH DISK NO 2 91821-05102 | 260400258 | 650,000 | 260101070 | 2026-02-25 | 2026-03-10 | 2 | 800,000 | 5 | 260500478 | 2026-05-15 | 79 | 2026-03-17 | Late |
| 260100752 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2572 | DR SONNE ST 375 MILKY CLEAR L= 375 MM P= 5 M | 260101049 | 294,234.23 | 260101049 | 2026-02-25 | 2026-02-25 | 1 | 294,234.23 | 5 | 260400383 | 2026-04-11 | 45 | 2026-03-04 | Late |
| 260100752 | 2026-02-20 | PERSEDIAAN UMUM | 6030.1697 | DR SHIELD SHEET SINGLE WALL RF1050 LE=1050MM P=1.027 M | 260101049 | 85,333.33 | 260101049 | 2026-02-25 | 2026-02-25 | 88 | 85,333.33 | 5 | 260400384 | 2026-04-11 | 45 | 2026-03-04 | Late |
| 260100752 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2716 | ATAP UPVC DR SHIELD TWIN WALL RF 1065MM X 8000MM | 260101049 | 864,864.87 | 260101049 | 2026-02-25 | 2026-02-25 | 23 | 864,864.87 | 5 | 260400383 | 2026-04-11 | 45 | 2026-03-04 | Late |
| 260100752 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2731 | DR SHIELD SHEET SINGLE WALL RF1050 LE=1050MM P=0.8 M | 260101049 | 68,266.67 | 260101049 | 2026-02-25 | 2026-02-25 | 58 | 68,266.67 | 5 | 260400384 | 2026-04-11 | 45 | 2026-03-04 | Late |
| 260100753 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2717 | ATAP UPVC DR SHIELD TWIN WALL RF 1065MM X 12000MM | 260101050 | 1,297,297.3 | 260101050 | 2026-02-25 | 2026-02-25 | 50 | 1,297,297.3 | 5 | 260300314 | 2026-03-07 | 10 | 2026-03-04 | Late |
| 260100756 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0109 | PLASTIK KANTONG 1/2 KG | 260500213 | 15,000 | 260101061 | 2026-02-25 | 2026-03-09 | 10 | 12,000 | 5 | 260400153 | 2026-04-07 | 41 | 2026-03-16 | Late |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0045 | MAJUN WARNA | 260500441 | 8,200 | 260101045 | 2026-02-25 | 2026-03-10 | 308 | 7,200 | 5 | – | – | – | 2026-03-17 | Overdue |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0045 | MAJUN WARNA | 260500441 | 8,200 | 260101045 | 2026-02-25 | 2026-03-10 | 308 | 7,200 | 5 | 260300086 | 2026-03-04 | 7 | 2026-03-17 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0162 | SEKROP | 260600087 | 50,000 | 260101051 | 2026-02-25 | 2026-03-10 | 12 | 50,000 | 5 | 260102069 | 2026-02-27 | 2 | 2026-03-17 | On time |
| 260100762 | 2026-02-21 | SPAREPART | 5027.0174 | REL VANBELT B (BESI) 20X20X3000 MM | 260101041 | 500,000 | 260101041 | 2026-02-25 | 2026-03-28 | 50 | 500,000 | 4 | 260500894 | 2026-05-28 | 92 | 2026-04-04 | Late |
| 260100762 | 2026-02-21 | SPAREPART | 5027.0174 | REL VANBELT B (BESI) 20X20X3000 MM | 260101041 | 500,000 | 260101041 | 2026-02-25 | 2026-03-28 | 50 | 500,000 | 4 | 260600288 | 2026-06-09 | 104 | 2026-04-04 | Late |
| 260100767 | 2026-02-21 | SPAREPART | 5011.0564 | BEARING 628 RS | 260101068 | 32,000 | 260101068 | 2026-02-25 | 2026-03-11 | 8 | 32,000 | 4 | 260300154 | 2026-03-04 | 7 | 2026-03-18 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101033 | 2026-02-25 | 2026-03-11 | 31,500 | 1,150 | 5 | 260400418 | 2026-04-13 | 47 | 2026-03-18 | Late |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260101033 | 2026-02-25 | 2026-03-11 | 21,000 | 1,150 | 5 | 260400555 | 2026-04-16 | 50 | 2026-03-18 | Late |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260101033 | 2026-02-25 | 2026-03-11 | 21,000 | 1,150 | 5 | 260300252 | 2026-03-06 | 9 | 2026-03-18 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260101033 | 2026-02-25 | 2026-03-11 | 31,500 | 1,150 | 5 | 260300057 | 2026-03-03 | 6 | 2026-03-18 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0071 | BOX MY TS 40*40 KW 1 | 260500474 | 1,275 | 260101033 | 2026-02-25 | 2026-03-11 | 73,500 | 1,150 | 5 | 260300300 | 2026-03-07 | 10 | 2026-03-18 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0071 | BOX MY TS 40*40 KW 1 | 260500474 | 1,275 | 260101033 | 2026-02-25 | 2026-03-11 | 73,500 | 1,150 | 5 | 260300392 | 2026-03-10 | 13 | 2026-03-18 | On time |
| 260100795 | 2026-02-20 | BAHAN PACKING | 3011.0071 | BOX MY TS 40*40 KW 1 | 260500474 | 1,275 | 260101033 | 2026-02-25 | 2026-03-11 | 73,500 | 1,150 | 5 | 260300511 | 2026-03-12 | 15 | 2026-03-18 | On time |
| 260100796 | 2026-02-20 | BAHAN PACKING | 3011.0064 | BOX PARIS MERAH TS 20*40 KW I | 260101046 | 1,116 | 260101046 | 2026-02-25 | 2026-03-16 | 33,250 | 1,116 | 5 | 260300510 | 2026-03-12 | 15 | 2026-03-23 | On time |
| 260100796 | 2026-02-20 | BAHAN PACKING | 3011.0064 | BOX PARIS MERAH TS 20*40 KW I | 260101046 | 1,116 | 260101046 | 2026-02-25 | 2026-03-16 | 33,250 | 1,116 | 5 | 260300295 | 2026-03-07 | 10 | 2026-03-23 | On time |
| 260100806 | 2026-02-23 | PERSEDIAAN UMUM | 6030.2624 | GAS CNG | 260101078 | 8,451 | 260101078 | 2026-02-25 | 2026-02-25 | 607.3 | 8,451 | 2 | – | – | – | 2026-03-04 | Overdue |
| 260100809 | 2026-02-24 | SPAREPART | 5027.0375 | SELENOID VALVE DSG-01-3C3-A240-51T YUKEN | 260101069 | 1,450,000 | 260101069 | 2026-02-25 | 2026-03-10 | 2 | 1,450,000 | 1 | 260102060 | 2026-02-27 | 2 | 2026-03-17 | On time |
| 260100812 | 2026-02-24 | SPAREPART | 5011.0411 | BEARING RN 307 NTN | 260300230 | 175,000 | 260101057 | 2026-02-25 | 2026-03-11 | 10 | 175,000 | 1 | 260300263 | 2026-03-06 | 9 | 2026-03-18 | On time |
| 260100813 | 2026-02-24 | PERSEDIAAN UMUM | 6030.0004 | SEMEN GRESIK 40KG | 260500241 | 59,500 | 260101080 | 2026-02-25 | 2026-02-25 | 10 | 58,000 | 1 | 260102068 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100813 | 2026-02-24 | PERSEDIAAN UMUM | 6060.0672 | BAUT DRILLING M 8X25 MM | 260500423 | 242.79 | 260101084 | 2026-02-25 | 2026-02-25 | 3,000 | 221.261 | 1 | 260102063 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100813 | 2026-02-24 | PERSEDIAAN UMUM | 6060.0672 | BAUT DRILLING M 8X25 MM | 260500423 | 242.79 | 260101084 | 2026-02-25 | 2026-02-25 | 3,000 | 221.261 | 1 | 260300449 | 2026-03-11 | 14 | 2026-03-04 | Late |
| 260100813 | 2026-02-24 | PERSEDIAAN UMUM | 6060.0672 | BAUT DRILLING M 8X25 MM | 260500423 | 242.79 | 260101084 | 2026-02-25 | 2026-02-25 | 3,000 | 221.261 | 1 | 260300814 | 2026-03-18 | 21 | 2026-03-04 | Late |
| 260100823 | 2026-02-24 | PERSEDIAAN UMUM | 6050.1375 | WARNING LIGHT ROTARY LTE-1121J 5 INCH 12 24 VDC-220 VAC LAMPU NEON DENGAN BUNGI MERK F | 260101090 | 135,000 | 260101090 | 2026-02-25 | 2026-03-16 | 2 | 135,000 | 1 | 260300256 | 2026-03-06 | 9 | 2026-03-23 | On time |
| 260100824 | 2026-02-24 | SPAREPART | 5017.0214 | MCCB SNEIDER 250 A | 260101059 | 1,150,000 | 260101059 | 2026-02-25 | 2026-03-11 | 2 | 1,150,000 | 1 | – | – | – | 2026-03-18 | Overdue |
| 260100824 | 2026-02-24 | SPAREPART | 5017.0214 | MCCB SNEIDER 250 A | 260101059 | 1,150,000 | 260101059 | 2026-02-25 | 2026-03-11 | 2 | 1,150,000 | 1 | 260300084 | 2026-03-04 | 7 | 2026-03-18 | On time |
| 260100825 | 2026-02-24 | PERSEDIAAN UMUM | 6020.0488 | KABEL SCUN 95 MM | 260300266 | 16,500 | 260101060 | 2026-02-25 | 2026-03-11 | 35 | 15,000 | 1 | – | – | – | 2026-03-18 | Overdue |
| 260100825 | 2026-02-24 | PERSEDIAAN UMUM | 6020.0488 | KABEL SCUN 95 MM | 260300266 | 16,500 | 260101060 | 2026-02-25 | 2026-03-11 | 35 | 15,000 | 1 | 260300158 | 2026-03-04 | 7 | 2026-03-18 | On time |
| 260100826 | 2026-02-24 | SPAREPART | 5019.0342 | MOTOR 1.5 KW 380 V 1500 RPM FLANGE B5 | 260500099 | 1,875,000 | 260101058 | 2026-02-25 | 2026-03-11 | 2 | 1,875,000 | 1 | 260300235 | 2026-03-06 | 9 | 2026-03-18 | On time |
| 260100827 | 2026-02-24 | PERSEDIAAN UMUM | 6030.0627 | RESIBON POTONG 4 INCH 100X6X16 | 260500492 | 10,810.81 | 260101037 | 2026-02-25 | 2026-02-25 | 2,000 | 2,702.7 | 1 | 260102036 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100832 | 2026-02-24 | SPAREPART | 5031.0976 | CHAIN HOIST 10 TON | 260101031 | 53,153,153.15 | 260101031 | 2026-02-25 | 2026-02-25 | 1 | 53,153,153.15 | 1 | 260300161 | 2026-03-04 | 7 | 2026-03-04 | On time |
| 260100832 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2638 | TALI WEBING 10 TON | 260101031 | 1,660,000 | 260101031 | 2026-02-25 | 2026-02-25 | 4 | 1,660,000 | 1 | 260102065 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100832 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2637 | TALI WEBING 5 TON | 260101031 | 742,000 | 260101031 | 2026-02-25 | 2026-02-25 | 5 | 742,000 | 1 | 260102065 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100832 | 2026-02-24 | PERSEDIAAN UMUM | 6030.0694 | SELANG BLANDER | 260600068 | 27,027.03 | 260101031 | 2026-02-25 | 2026-02-25 | 100 | 27,027.03 | 1 | 260102065 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100832 | 2026-02-24 | FIXED ASSETS | AST02640 | MESIN PLASMA 130A | 260101031 | 15,765,765.76 | 260101031 | 2026-02-25 | 2026-02-25 | 1 | 15,765,765.76 | 1 | 260102039 | 2026-02-27 | 2 | 2026-03-04 | On time |
| 260100832 | 2026-02-24 | SPAREPART | 5031.0976 | CHAIN HOIST 10 TON | 260101031 | 53,153,153.15 | 260101031 | 2026-02-25 | 2026-02-25 | 1 | 53,153,153.15 | 1 | – | – | – | 2026-03-04 | Overdue |
| 260100833 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2744 | ELBOW PIPA GAS | 260101032 | 55,000 | 260101032 | 2026-02-25 | 2026-02-25 | 4 | 55,000 | 1 | 260500351 | 2026-05-11 | 75 | 2026-03-04 | Late |
| 260100833 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2743 | BOWL ISI 3 | 260101032 | 1,876,250 | 260101032 | 2026-02-25 | 2026-02-25 | 11 | 1,876,250 | 1 | – | – | – | 2026-03-04 | Overdue |
| 260110014 | 2026-01-07 | PERSEDIAAN UMUM | 6050.059 | ROCKWOOL WIRE BLANKET D 100 Kg/m3 50MM X 0.9 MTR X 4 MTR | 260310045 | 595,000 | 260110441 | 2026-02-25 | 2026-02-25 | 917 | 595,000 | 49 | 260310406 | 2026-03-31 | 34 | 2026-03-04 | Late |
| 260110014 | 2026-01-07 | PERSEDIAAN UMUM | 6050.059 | ROCKWOOL WIRE BLANKET D 100 Kg/m3 50MM X 0.9 MTR X 4 MTR | 260310045 | 595,000 | 260110441 | 2026-02-25 | 2026-02-25 | 917 | 595,000 | 49 | 260410322 | 2026-04-17 | 51 | 2026-03-04 | Late |
| 260110014 | 2026-01-07 | PERSEDIAAN UMUM | 6050.059 | ROCKWOOL WIRE BLANKET D 100 Kg/m3 50MM X 0.9 MTR X 4 MTR | 260310045 | 595,000 | 260110441 | 2026-02-25 | 2026-02-25 | 917 | 595,000 | 49 | 260410169 | 2026-04-09 | 43 | 2026-03-04 | Late |
| 260110014 | 2026-01-07 | PERSEDIAAN UMUM | 6050.059 | ROCKWOOL WIRE BLANKET D 100 Kg/m3 50MM X 0.9 MTR X 4 MTR | 260310045 | 595,000 | 260110441 | 2026-02-25 | 2026-02-25 | 917 | 595,000 | 49 | 260410070 | 2026-04-07 | 41 | 2026-03-04 | Late |
| 260110051 | 2026-01-24 | PERSEDIAAN UMUM | 6050.0237 | KABEL LAS 70MM | 260610020 | 85,585.58 | 260110449 | 2026-02-25 | 2026-02-25 | 100 | 81,081 | 32 | 260310244 | 2026-03-12 | 15 | 2026-03-04 | Late |
| 260110085 | 2026-02-05 | SPAREPART | 5021.0453 | SYNCHRONOUS BELT 750H-WIDTH 25MM | 260110447 | 245,000 | 260110447 | 2026-02-25 | 2026-03-07 | 10 | 245,000 | 20 | 260310131 | 2026-03-07 | 10 | 2026-03-14 | On time |
| 260110085 | 2026-02-05 | SPAREPART | 5021.0454 | SYNCHRONOUS BELT 770H-WIDTH 25MM | 260110447 | 250,000 | 260110447 | 2026-02-25 | 2026-03-07 | 15 | 250,000 | 20 | 260310131 | 2026-03-07 | 10 | 2026-03-14 | On time |
| 260110085 | 2026-02-05 | SPAREPART | 5021.0456 | SYNCHRONOUS BELT 1050H-WIDTH 38MM | 260110447 | 450,000 | 260110447 | 2026-02-25 | 2026-03-07 | 20 | 450,000 | 20 | 260310131 | 2026-03-07 | 10 | 2026-03-14 | On time |
| 260110113 | 2026-02-16 | PERSEDIAAN UMUM | 6050.0237 | KABEL LAS 70MM | 260610020 | 85,585.58 | 260110448 | 2026-02-25 | 2026-02-25 | 150 | 81,081 | 9 | 260310104 | 2026-03-05 | 8 | 2026-03-04 | Late |
| 260110122 | 2026-02-21 | SPAREPART | 5017.012 | STOP KONTAK 4 LUBANG | 260610029 | 25,000 | 260110443 | 2026-02-25 | 2026-02-25 | 10 | 56,228 | 4 | 260310038 | 2026-03-03 | 6 | 2026-03-04 | On time |
| 260110127 | 2026-02-24 | PERSEDIAAN UMUM | 6020.0458 | KABEL TIES 30CM X 4.6MM | 260410099 | 17,436.6 | 260110442 | 2026-02-25 | 2026-02-25 | 10 | 15,399 | 1 | 260310054 | 2026-03-03 | 6 | 2026-03-04 | On time |
| 260110128 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2745 | BASE COURSE | 260310094 | 350,000 | 260110444 | 2026-02-25 | 2026-03-07 | 20 | 350,000 | 1 | 260310128 | 2026-03-07 | 10 | 2026-03-14 | On time |
| 260110128 | 2026-02-24 | PERSEDIAAN UMUM | 6030.2746 | MAKADAM | 260310094 | 350,000 | 260110444 | 2026-02-25 | 2026-03-07 | 50 | 350,000 | 1 | 260310128 | 2026-03-07 | 10 | 2026-03-14 | On time |
| 260100268 | 2026-01-22 | BAHAN BAKU GLAZE | 1099.0022 | CASTABLE REFRACTORY / CORAL C-16 1600 DERAJAT | 260101029 | 21 | 260101029 | 2026-02-24 | 2026-04-06 | 60 | 21 | 33 | 260401127 | 2026-04-29 | 64 | 2026-04-13 | Late |
| 260100615 | 2026-02-13 | PERSEDIAAN UMUM | 6020.0784 | USM HUB 4 PORT USB 3.0 WITH MICRO USB POWER SUPPLY | 260101034 | 110,000 | 260101034 | 2026-02-24 | 2026-03-05 | 3 | 110,000 | 11 | – | – | – | 2026-03-12 | Overdue |
| 260100615 | 2026-02-13 | PERSEDIAAN UMUM | 6020.0784 | USM HUB 4 PORT USB 3.0 WITH MICRO USB POWER SUPPLY | 260101034 | 110,000 | 260101034 | 2026-02-24 | 2026-03-05 | 3 | 110,000 | 11 | 260300091 | 2026-03-04 | 8 | 2026-03-12 | On time |
| 260100683 | 2026-02-18 | BAHAN BAKU BODY | 1099.0032 | LIGHTWEIGHT CASTABLE | 260101029 | 25 | 260101029 | 2026-02-24 | 2026-04-06 | 20 | 25 | 6 | 260401127 | 2026-04-29 | 64 | 2026-04-13 | Late |
| 260100685 | 2026-02-18 | PERSEDIAAN UMUM | 6020.0791 | KABEL NYYHY 3X0.75MM | 260101035 | 11,200 | 260101035 | 2026-02-24 | 2026-02-24 | 1,500 | 11,200 | 6 | 260102041 | 2026-02-27 | 3 | 2026-03-03 | On time |
| 260110004 | 2026-01-05 | PERSEDIAAN UMUM | 6050.1254 | RANTAI BAJA 3/8MM | 260110438 | 125,000 | 260110438 | 2026-02-24 | 2026-03-05 | 50 | 125,000 | 50 | 260310007 | 2026-03-02 | 6 | 2026-03-12 | On time |