Merged data
The merged procurement sheet (PR → PO → GRPO) with the realisasi status used by KPI 2/3 · 13,488 row(s)
How the three files are consolidated— click to expand
Three SAP exports are combined. The SPINE is PR TO PO TO GRPO — the master PR list (one row per PR-item, including PRs not yet converted to a PO). It sets the dashboard's date span and is KPI 4's denominator.
PO.csv enriches it with the PO details that only it carries: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), the ETA, currency and unit price, joined on PO No.
LEAD TIME PR TO GR adds the goods-receipt detail: one row per GR with its date and quantity, plus the ordered PO quantity, last/current price and PR→PO days. This is what makes the quantity-aware completion possible.
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality), 6 (Substitution) and 7 (New Vendor) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR No | PR Date | Item Group | Item Code | Item | Last PO | Last Price | PO No | PO Date ▼ | ETA | Qty | Price | PR→PO | GRPO No | GRPO Date | PO→GRPO | Deadline | Realisasi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260100870 | 2026-02-25 | PERSEDIAAN UMUM | 6030.053 | LEM SILICON CLEAR 300ML | 260500492 | 27,027.03 | 260300234 | 2026-03-10 | 2026-03-16 | 20 | 26,126.13 | 13 | 260300739 | 2026-03-17 | 7 | 2026-03-23 | On time |
| 260100870 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0627 | RESIBON POTONG 4 INCH 100X6X16 | 260500492 | 10,810.81 | 260300234 | 2026-03-10 | 2026-03-16 | 15 | 10,360.36 | 13 | 260300739 | 2026-03-17 | 7 | 2026-03-23 | On time |
| 260100870 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0529 | LEM SILICON RED 85 GR | 260500492 | 22,522.52 | 260300234 | 2026-03-10 | 2026-03-16 | 12 | 18,018.02 | 13 | 260300739 | 2026-03-17 | 7 | 2026-03-23 | On time |
| 260100870 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0524 | LEM SUPER GLUE | 260500492 | 4,954.96 | 260300234 | 2026-03-10 | 2026-03-16 | 20 | 4,504.51 | 13 | 260300739 | 2026-03-17 | 7 | 2026-03-23 | On time |
| 260100870 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0524 | LEM SUPER GLUE | 260500492 | 4,954.96 | 260300234 | 2026-03-10 | 2026-03-16 | 20 | 4,504.51 | 13 | 260300811 | 2026-03-18 | 8 | 2026-03-23 | On time |
| 260100870 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0526 | ISOLASI ELECTRIC | 260500492 | 6,306.31 | 260300234 | 2026-03-10 | 2026-03-16 | 30 | 5,855.86 | 13 | 260300739 | 2026-03-17 | 7 | 2026-03-23 | On time |
| 260100896 | 2026-02-26 | PERSEDIAAN UMUM | 6030.262 | PIPA GALVANIS 3 INCH | 260600192 | 1,036,036.04 | 260300259 | 2026-03-10 | 2026-03-28 | 2 | 1,018,018.02 | 12 | 260300662 | 2026-03-16 | 6 | 2026-04-04 | On time |
| 260100896 | 2026-02-26 | PERSEDIAAN UMUM | 6030.2771 | PIPA GALVANIS 2 INCH | 260300259 | 629,729.73 | 260300259 | 2026-03-10 | 2026-03-28 | 2 | 629,729.73 | 12 | 260300575 | 2026-03-13 | 3 | 2026-04-04 | On time |
| 260100913 | 2026-02-28 | SPAREPART | 5030.1271 | DIAMOND TRIMMING WHEEL GM3 (200X140-165-25X12) 100089471 | 260300206 | 272 | 260300206 | 2026-03-10 | 2026-05-05 | 150 | 272 | 10 | – | – | – | 2026-05-12 | Overdue |
| 260100913 | 2026-02-28 | SPAREPART | 5030.1272 | DIAMONDTRIMMING WHEEL GM4 (200X140-165-25X12) 100089521 | 260300206 | 272 | 260300206 | 2026-03-10 | 2026-05-05 | 100 | 272 | 10 | – | – | – | 2026-05-12 | Overdue |
| 260110113 | 2026-02-16 | PERSEDIAAN UMUM | 6050.124 | CHAIN BLOCK 3T 15M | 260310061 | 3,600,000 | 260310061 | 2026-03-10 | 2026-03-10 | 2 | 3,600,000 | 22 | 260410062 | 2026-04-07 | 28 | 2026-03-17 | Late |
| 260300057 | 2026-03-04 | PERSEDIAAN UMUM | 6050.0241 | JARUM KERAS M 16 | 260300227 | 37,162.16 | 260300227 | 2026-03-10 | 2026-03-10 | 8 | 37,162.16 | 6 | 260300737 | 2026-03-17 | 7 | 2026-03-17 | On time |
| 260300091 | 2026-03-07 | PERSEDIAAN UMUM | 6030.2788 | TALANG AIR PVC 4 INCHI (KOTAK) @4 METER + BRACKET | 260300225 | 78,148.65 | 260300225 | 2026-03-10 | 2026-03-10 | 3 | 78,148.65 | 3 | 260300584 | 2026-03-13 | 3 | 2026-03-17 | On time |
| 260300100 | 2026-03-09 | PERSEDIAAN UMUM | 6050.0689 | CARBON DIOKSIDE/ CO2 (Refill, Purity Food Grade) | 260300228 | 140,000 | 260300228 | 2026-03-10 | 2026-03-10 | 10 | 140,000 | 1 | – | – | – | 2026-03-17 | Overdue |
| 260300100 | 2026-03-09 | PERSEDIAAN UMUM | 6030.2188 | WATER MUR GALVANIS 3 INCH | 260300227 | 243,513.51 | 260300227 | 2026-03-10 | 2026-03-10 | 20 | 243,513.51 | 1 | 260300735 | 2026-03-17 | 7 | 2026-03-17 | On time |
| 260300100 | 2026-03-09 | PERSEDIAAN UMUM | 6030.2719 | ELBOW 90 CARBON STELL 10 INCH SCH 40 | 260300227 | 990,990.99 | 260300227 | 2026-03-10 | 2026-03-10 | 2 | 990,990.99 | 1 | 260300743 | 2026-03-17 | 7 | 2026-03-17 | On time |
| 260300103 | 2026-03-06 | BAHAN PEMBANTU | 20BK.0016 | ALUMINA LINING BRICK 140X40X37X97 | 260300203 | 0.45 | 260300203 | 2026-03-10 | 2026-04-30 | 11,000 | 0.45 | 4 | 260400717 | 2026-04-20 | 41 | 2026-05-07 | On time |
| 260300103 | 2026-03-06 | BAHAN PEMBANTU | 20BK.0015 | ALUMINA LINING BRICK 140X40X97 | 260500418 | 0.36 | 260300204 | 2026-03-10 | 2026-06-20 | 24,000 | 0.36 | 4 | – | – | – | 2026-06-27 | Outstanding |
| 260300108 | 2026-03-10 | PERSEDIAAN UMUM | 6010.055 | SERAGAM AGEN (L) | 260600268 | 120,000 | 260300207 | 2026-03-10 | 2026-04-07 | 15 | 125,000 | – | 260400889 | 2026-04-23 | 44 | 2026-04-14 | Late |
| 260300108 | 2026-03-10 | PERSEDIAAN UMUM | 6010.0551 | SERAGAM AGEN (XL) | 260600268 | 120,000 | 260300207 | 2026-03-10 | 2026-04-07 | 5 | 125,000 | – | 260400889 | 2026-04-23 | 44 | 2026-04-14 | Late |
| 260300109 | 2026-03-10 | PERSEDIAAN UMUM | 6010.0794 | Seragam SPG SPB (Size M) | 260300208 | 120,000 | 260300208 | 2026-03-10 | 2026-04-07 | 20 | 120,000 | – | 260400890 | 2026-04-23 | 44 | 2026-04-14 | Late |
| 260300109 | 2026-03-10 | PERSEDIAAN UMUM | 6010.0795 | Seragam SPG SPB (Size L) | 260300208 | 120,000 | 260300208 | 2026-03-10 | 2026-04-07 | 34 | 120,000 | – | 260400890 | 2026-04-23 | 44 | 2026-04-14 | Late |
| 260300109 | 2026-03-10 | PERSEDIAAN UMUM | 6010.0793 | Seragam SPG SPB (Size S) | 260300208 | 120,000 | 260300208 | 2026-03-10 | 2026-04-07 | 10 | 120,000 | – | 260400890 | 2026-04-23 | 44 | 2026-04-14 | Late |
| 260300109 | 2026-03-10 | PERSEDIAAN UMUM | 6010.0797 | Seragam SPG SPB (Size XXL) | 260300208 | 120,000 | 260300208 | 2026-03-10 | 2026-04-07 | 8 | 120,000 | – | 260400890 | 2026-04-23 | 44 | 2026-04-14 | Late |
| 260300109 | 2026-03-10 | PERSEDIAAN UMUM | 6010.0796 | Seragam SPG SPB (Size XL) | 260300208 | 120,000 | 260300208 | 2026-03-10 | 2026-04-07 | 28 | 120,000 | – | 260400890 | 2026-04-23 | 44 | 2026-04-14 | Late |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310068 | 2026-03-10 | 2026-03-10 | 250,000 | 1,750 | 6 | – | – | – | 2026-03-17 | Overdue |
| 260310019 | 2026-03-07 | BAHAN PEMBANTU | 3034.0003 | TECHNOMELT 2930 ID25KG | 260510218 | 52,000 | 260310060 | 2026-03-10 | 2026-03-10 | 900 | 34,000 | 3 | 260310282 | 2026-03-16 | 6 | 2026-03-17 | On time |
| 260310021 | 2026-03-09 | PERSEDIAAN UMUM | 6030.2746 | MAKADAM | 260310094 | 350,000 | 260310072 | 2026-03-10 | 2026-03-18 | 3 | 350,000 | 1 | 260310268 | 2026-03-14 | 4 | 2026-03-25 | On time |
| 260310021 | 2026-03-09 | PERSEDIAAN UMUM | 6030.2745 | BASE COURSE | 260310094 | 350,000 | 260310072 | 2026-03-10 | 2026-03-18 | 2.7 | 350,000 | 1 | 260310268 | 2026-03-14 | 4 | 2026-03-25 | On time |
| 251210045 | 2025-12-15 | PERSEDIAAN UMUM | 6030.2494 | CUTTING EDGE PART NO. 97A2259 | 260310063 | 1,558,190 | 260310063 | 2026-03-09 | 2026-03-13 | 5 | 1,558,190 | 84 | 260410171 | 2026-04-09 | 31 | 2026-03-20 | Late |
| 251210045 | 2025-12-15 | PERSEDIAAN UMUM | 6030.2493 | CUTTING EDGE PART NO. 17A8933 | 260310063 | 4,018,120 | 260310063 | 2026-03-09 | 2026-03-13 | 5 | 4,018,120 | 84 | 260410171 | 2026-04-09 | 31 | 2026-03-20 | Late |
| 260100086 | 2026-01-08 | FIXED ASSETS | AST02587 | KOMPRESOR ENMAX - 10PI 7.5 HP | 260600023 | 13,500,000 | 260300171 | 2026-03-09 | 2026-03-09 | 1 | 13,500,000 | 60 | 260300717 | 2026-03-17 | 8 | 2026-03-16 | Late |
| 260100308 | 2026-01-23 | PERSEDIAAN UMUM | 6050.0947 | GEMBOK ANTI AIR ANTI KARAT 50MM (LONG) | 260400280 | 76,711.43 | 260300190 | 2026-03-09 | 2026-03-17 | 3 | 72,371 | 45 | 260300842 | 2026-03-24 | 15 | 2026-03-24 | On time |
| 260100635 | 2026-02-14 | SPAREPART | 5023.1551 | ROLL CONVEYOR P 260MM OD 90MM P. AS 340MM OD AS 10MM INCLUDE BEARING 6204 2HRS | 260300194 | 115,000 | 260300194 | 2026-03-09 | 2026-04-10 | 20 | 115,000 | 23 | 260500890 | 2026-05-28 | 80 | 2026-04-17 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400237 | 2026-04-09 | 31 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400314 | 2026-04-10 | 32 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400315 | 2026-04-10 | 32 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400316 | 2026-04-10 | 32 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400236 | 2026-04-09 | 31 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400130 | 2026-04-06 | 28 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | – | – | – | 2026-04-06 | Overdue |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300931 | 2026-03-30 | 21 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400129 | 2026-04-06 | 28 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300968 | 2026-03-31 | 22 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300967 | 2026-03-31 | 22 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300966 | 2026-03-31 | 22 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300930 | 2026-03-30 | 21 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260301022 | 2026-03-31 | 22 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400110 | 2026-04-04 | 26 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400128 | 2026-04-06 | 28 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260301023 | 2026-03-31 | 22 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300969 | 2026-03-31 | 22 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400047 | 2026-04-02 | 24 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260301024 | 2026-03-31 | 22 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300929 | 2026-03-30 | 21 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300932 | 2026-03-30 | 21 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400108 | 2026-04-04 | 26 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400109 | 2026-04-04 | 26 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400198 | 2026-04-08 | 30 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400049 | 2026-04-02 | 24 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400217 | 2026-04-08 | 30 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400216 | 2026-04-08 | 30 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400199 | 2026-04-08 | 30 | 2026-04-06 | Late |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400048 | 2026-04-02 | 24 | 2026-04-06 | On time |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400235 | 2026-04-09 | 31 | 2026-04-06 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 1,700 | 25,000 | 18 | 260401065 | 2026-04-29 | 51 | 2026-04-06 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400556 | 2026-04-16 | 38 | 2026-04-06 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400904 | 2026-04-24 | 46 | 2026-04-06 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400852 | 2026-04-23 | 45 | 2026-04-06 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 1,700 | 25,000 | 18 | 260401158 | 2026-04-30 | 52 | 2026-04-06 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400654 | 2026-04-18 | 40 | 2026-04-06 | Late |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400787 | 2026-04-22 | 44 | 2026-04-06 | Late |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.1399 | REFILL PENGHARUM RUANGAN (STELLA - APPLE FIESTA) | 260300169 | 30,500 | 260300169 | 2026-03-09 | 2026-03-16 | 2 | 30,500 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6010.0326 | PENGHARUM RUANGAN | 260600165 | 9,175 | 260300169 | 2026-03-09 | 2026-03-16 | 4 | 8,800 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.1372 | REFIL PENGHARUM RUANGAN (GLADE) | 260500138 | 32,500 | 260300169 | 2026-03-09 | 2026-03-16 | 6 | 34,300 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0082 | REFILL PENGHARUM RUANGAN (STELLA) | 260300169 | 56,300 | 260300169 | 2026-03-09 | 2026-03-16 | 4 | 56,300 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time |
| 260100763 | 2026-02-21 | SPAREPART | 5019.013 | GEAR REDUCER MNRV 063 1:30 FLANGE B 14 + MOTOR 0.75KW 1460RPM + 380VOLT | 260300201 | 9,000,000 | 260300201 | 2026-03-09 | 2026-03-16 | 2 | 9,000,000 | 16 | 260300716 | 2026-03-17 | 8 | 2026-03-23 | On time |
| 260100819 | 2026-02-24 | SPAREPART | 5031.0997 | TEFLON KOPLING OD 58X118 | 260300224 | 115,000 | 260300224 | 2026-03-09 | 2026-03-29 | 60 | 115,000 | 13 | 260400885 | 2026-04-23 | 45 | 2026-04-05 | Late |
| 260100854 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0458 | KABEL TIES 30CM X 4.6MM | 260410099 | 17,436.6 | 260300196 | 2026-03-09 | 2026-03-28 | 25 | 24,774.78 | 12 | 260300742 | 2026-03-17 | 8 | 2026-04-04 | On time |
| 260100855 | 2026-02-25 | SPAREPART | 5011.0414 | BEARING SKF 6215 2Z C3 | 260300229 | 428,500 | 260300229 | 2026-03-09 | 2026-03-30 | 6 | 428,500 | 12 | 260300533 | 2026-03-12 | 3 | 2026-04-06 | On time |
| 260100855 | 2026-02-25 | SPAREPART | 5011.0411 | BEARING RN 307 NTN | 260300230 | 175,000 | 260300230 | 2026-03-09 | 2026-03-30 | 15 | 175,000 | 12 | 260401106 | 2026-04-29 | 51 | 2026-04-06 | Late |
| 260100855 | 2026-02-25 | SPAREPART | 5011.0439 | BEARING 6314 ZZ C3 SKF | 260300229 | 771,100 | 260300229 | 2026-03-09 | 2026-03-30 | 6 | 771,100 | 12 | 260300533 | 2026-03-12 | 3 | 2026-04-06 | On time |
| 260100871 | 2026-02-25 | PERSEDIAAN UMUM | 6050.0049 | KAPI 4 INCH | 260500006 | 13,243.24 | 260300231 | 2026-03-09 | 2026-03-28 | 12 | 12,612.61 | 12 | 260300741 | 2026-03-17 | 8 | 2026-04-04 | On time |
| 260100871 | 2026-02-25 | PERSEDIAAN UMUM | 6050.0018 | KRAN AIR 1/2 INCH | 260500490 | 33,783.78 | 260300231 | 2026-03-09 | 2026-03-28 | 5 | 31,531.53 | 12 | 260300813 | 2026-03-18 | 9 | 2026-04-04 | On time |
| 260100872 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0053 | KLEM SLANG 1/2 INCH | 260500490 | 2,342.34 | 260300197 | 2026-03-09 | 2026-03-30 | 15 | 2,252.25 | 12 | 260300473 | 2026-03-11 | 2 | 2026-04-06 | On time |
| 260100872 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0076 | KLEM SLANG 3/4 INCH | 260500490 | 2,342.34 | 260300197 | 2026-03-09 | 2026-03-30 | 15 | 2,252.25 | 12 | 260300473 | 2026-03-11 | 2 | 2026-04-06 | On time |
| 260100875 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2711 | KAYU 5X7 | 260300217 | 100,000 | 260300217 | 2026-03-09 | 2026-03-09 | 12 | 100,000 | 12 | 260300543 | 2026-03-12 | 3 | 2026-03-16 | On time |
| 260100875 | 2026-02-25 | PERSEDIAAN UMUM | 6030.271 | BESI POLOS 16 MM | 260300212 | 156,216.22 | 260300212 | 2026-03-09 | 2026-03-09 | 4 | 156,216.22 | 12 | 260300909 | 2026-03-28 | 19 | 2026-03-16 | Late |
| 260100892 | 2026-02-26 | SPAREPART | 5027.0468 | GEAR MOTOR TRANSMAX TR 97 RATIO 92.48 SET MOTOR YUEMA YDA 2.2KW 3PHS 380V | 260300164 | 12,710,000 | 260300164 | 2026-03-09 | 2026-03-09 | 3 | 12,710,000 | 11 | 260300722 | 2026-03-17 | 8 | 2026-03-16 | Late |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6030.2778 | BOR TANGAN MAKITA | 260400090 | 923,000 | 260300192 | 2026-03-09 | 2026-03-30 | 1 | 923,000 | 9 | 260300563 | 2026-03-13 | 4 | 2026-04-06 | On time |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0366 | GERINDA TANGAN GA 7020 OD 180 MM | 260300192 | 2,100,000 | 260300192 | 2026-03-09 | 2026-03-30 | 1 | 2,100,000 | 9 | 260300563 | 2026-03-13 | 4 | 2026-04-06 | On time |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6050.1379 | BAUT BAUT DRILLING M8 | 260300195 | 278.38 | 260300195 | 2026-03-09 | 2026-03-17 | 100 | 278.378 | 9 | 260300734 | 2026-03-17 | 8 | 2026-03-24 | On time |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6030.2777 | MATA BOR DRILLING M8 | 260300195 | 9,009.01 | 260300195 | 2026-03-09 | 2026-03-17 | 2 | 9,009.01 | 9 | 260300732 | 2026-03-17 | 8 | 2026-03-24 | On time |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.1878 | CAT AVIAN TWILIGHT BLUE KODE 731 @18LITER | 260610139 | 1,514,692.58 | 260310059 | 2026-03-09 | 2026-03-09 | 3 | 1,108,709.91 | 11 | – | – | – | 2026-03-16 | Overdue |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6050.1376 | SIKA ANCHORFIX-1 300ML | 260310080 | 317,000 | 260310080 | 2026-03-09 | 2026-03-09 | 15 | 317,000 | 11 | – | – | – | 2026-03-16 | Overdue |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0224 | PIN WITH THREAD C9999660040 | 260300181 | 14.5 | 260300181 | 2026-03-09 | 2026-04-30 | 10 | 14.5 | 7 | – | – | – | 2026-05-07 | Overdue |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0223 | LONG PIPE C9999660028 | 260300182 | 140,000 | 260300182 | 2026-03-09 | 2026-04-30 | 10 | 140,000 | 7 | 260500301 | 2026-05-11 | 63 | 2026-05-07 | Late |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0222 | SHORT TIN TUBE W/CAP (SHORT PIPE) C9999660029 ZANASI | 260300182 | 140,000 | 260300182 | 2026-03-09 | 2026-04-30 | 10 | 140,000 | 7 | 260500301 | 2026-05-11 | 63 | 2026-05-07 | Late |
| 260300008 | 2026-03-02 | PERSEDIAAN UMUM | 6020.0801 | STOP KONTAK 5 LUBANG 6 METER | 260300232 | 220,720.72 | 260300232 | 2026-03-09 | 2026-03-16 | 2 | 220,720.72 | 7 | 260300736 | 2026-03-17 | 8 | 2026-03-23 | On time |
| 260300021 | 2026-03-02 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300167 | 2026-03-09 | 2026-03-16 | 170,000 | 252 | 7 | – | – | – | 2026-03-23 | Overdue |
| 260300022 | 2026-03-02 | BAHAN BAKU BODY | 1010.003 | PASIR KUARSA (LASEM) (SELOJOYO) | 260600010 | 144 | 260300166 | 2026-03-09 | 2026-03-16 | 280,000 | 136 | 7 | 260300902 | 2026-03-28 | 19 | 2026-03-23 | Late |
| 260300022 | 2026-03-02 | BAHAN BAKU BODY | 1010.003 | PASIR KUARSA (LASEM) (SELOJOYO) | 260600010 | 144 | 260300166 | 2026-03-09 | 2026-03-16 | 280,000 | 136 | 7 | 260300936 | 2026-03-30 | 21 | 2026-03-23 | Late |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 980,000 | 140 | 7 | 260300441 | 2026-03-10 | 1 | 2026-03-21 | On time |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 980,000 | 140 | 7 | 260300382 | 2026-03-10 | 1 | 2026-03-21 | On time |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 980,000 | 140 | 7 | 260300503 | 2026-03-12 | 3 | 2026-03-21 | On time |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 980,000 | 140 | 7 | 260300379 | 2026-03-10 | 1 | 2026-03-21 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400247 | 2026-04-09 | 31 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260401004 | 2026-04-28 | 50 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400981 | 2026-04-27 | 49 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400224 | 2026-04-08 | 30 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400733 | 2026-04-21 | 43 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400934 | 2026-04-25 | 47 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400197 | 2026-04-08 | 30 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400307 | 2026-04-10 | 32 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400898 | 2026-04-24 | 46 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400544 | 2026-04-16 | 38 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400452 | 2026-04-14 | 36 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400378 | 2026-04-11 | 33 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400775 | 2026-04-22 | 44 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400502 | 2026-04-15 | 37 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400589 | 2026-04-17 | 39 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400100 | 2026-04-04 | 26 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400640 | 2026-04-17 | 39 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400126 | 2026-04-06 | 28 | 2026-04-17 | On time |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400847 | 2026-04-23 | 45 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400672 | 2026-04-20 | 42 | 2026-04-17 | Late |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400411 | 2026-04-13 | 35 | 2026-04-17 | On time |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400676 | 2026-04-20 | 42 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260500019 | 2026-05-02 | 54 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400735 | 2026-04-21 | 43 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400936 | 2026-04-25 | 47 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260401143 | 2026-04-30 | 52 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400902 | 2026-04-24 | 46 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260401003 | 2026-04-28 | 50 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400848 | 2026-04-23 | 45 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400777 | 2026-04-22 | 44 | 2026-04-06 | Late |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 1,100,000 | 196 | 7 | 260401063 | 2026-04-29 | 51 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260500020 | 2026-05-02 | 54 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400846 | 2026-04-23 | 45 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400901 | 2026-04-24 | 46 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260401141 | 2026-04-30 | 52 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400671 | 2026-04-20 | 42 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400496 | 2026-04-15 | 37 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260500040 | 2026-05-04 | 56 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260401062 | 2026-04-29 | 51 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400731 | 2026-04-21 | 43 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260401007 | 2026-04-28 | 50 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400979 | 2026-04-27 | 49 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400637 | 2026-04-17 | 39 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400539 | 2026-04-16 | 38 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400933 | 2026-04-25 | 47 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400774 | 2026-04-22 | 44 | 2026-04-06 | Late |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400585 | 2026-04-17 | 39 | 2026-04-06 | Late |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0184 | MAP PLASTIK L TRANSPARAN, F4 | 260500419 | 1,600 | 260300202 | 2026-03-09 | 2026-03-16 | 36 | 1,700 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0442 | TINTA EPSON 003 YELLOW 65ML | 260600027 | 83,000 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 83,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0443 | TINTA EPSON 003 MAGENTA 65ML | 260600027 | 83,000 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 83,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0444 | TINTA EPSON 003 CYAN 65ML | 260600027 | 83,000 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 83,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0156 | STAPLES KECIL HD-10 | 260610151 | 9,741 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 34,500 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0449 | MATERAI 10,000 | 260500260 | 11,000 | 260300241 | 2026-03-09 | 2026-03-16 | 10 | 11,000 | 4 | 260300836 | 2026-03-22 | 13 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0001 | KERTAS A4 | 260600244 | 43,000 | 260300241 | 2026-03-09 | 2026-03-16 | 15 | 43,000 | 4 | 260300836 | 2026-03-22 | 13 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.016 | PENGHAPUS PENSIL PENSIL, 1.5 X 3.0 CM | 260400207 | 2,200 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 2,200 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0147 | CUTTER KECIL A-300 | 260600027 | 5,000 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 5,000 | 4 | 260400360 | 2026-04-10 | 32 | 2026-03-23 | Late |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0172 | BINDER CLIP NO. 107 NO. 107 | 260610060 | 3,500 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 2,500 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0173 | BINDER CLIP NO. 111 NO. 111 | 260600027 | 3,800 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 3,800 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0572 | TIPE X / STIPO KERTAS | 260400207 | 5,400 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 5,400 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0129 | SPIDOL BOARDMARKER BIRU - BOARDMARKER, BIRU/BLUE | 260600027 | 6,700 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 6,700 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0183 | BOX FILE FILE, 26 X 31 X 10 CM | 260500410 | 35,700 | 260300202 | 2026-03-09 | 2026-03-16 | 10 | 32,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0243 | PAPER CLIP NO 5 | 260400207 | 4,000 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 4,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0174 | BINDER CLIP NO. 155 NO. 155 | 260610060 | 7,200 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 5,200 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0128 | SPIDOL BOARD MARKER MERAH BOARDMARKER, MERAH/RED | 260600027 | 6,700 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 6,700 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0148 | CUTTER BESAR L-500 | 260610151 | 7,767 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 12,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0441 | TINTA EPSON 003 BLACK 65ML | 260600027 | 83,000 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 83,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0573 | TIPE X / STIPO CAIR | 260400207 | 4,900 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 4,900 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0126 | ISI PENSIL 2B CETEKAN 2B,0.5 mm,12TUBE/BOX,60 mm 12LEADS/TUBE | 260500025 | 3,000 | 260300202 | 2026-03-09 | 2026-03-16 | 4 | 3,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0329 | RAK FILE ISI 3 | 260600182 | 68,000 | 260300202 | 2026-03-09 | 2026-03-16 | 8 | 68,000 | 4 | 260500297 | 2026-05-09 | 61 | 2026-03-23 | Late |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0127 | SPIDOL BOARDMARKER HITAM - BOARDMARKER, HITAM/BLACK | 260610151 | 8,998 | 260300202 | 2026-03-09 | 2026-03-16 | 3 | 6,700 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.018 | TEMPAT PENSIL | 260600027 | 27,700 | 260300202 | 2026-03-09 | 2026-03-16 | 1 | 27,700 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0156 | STAPLES KECIL HD-10 | 260610151 | 9,741 | 260300202 | 2026-03-09 | 2026-03-16 | 5 | 34,500 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0139 | STABILO KUNING | 260600027 | 9,300 | 260300202 | 2026-03-09 | 2026-03-16 | 5 | 9,300 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0531 | DELI STICKY NOTES EA03303 4 Color 51x51mm 4x100sheets | 260600027 | 6,800 | 260300202 | 2026-03-09 | 2026-03-16 | 2 | 6,800 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300035 | 2026-03-05 | STATIONERY | 6010.0124 | PENSIL MEKANIK | 260400107 | 13,000 | 260300202 | 2026-03-09 | 2026-03-16 | 3 | 13,000 | 4 | 260300628 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300041 | 2026-03-04 | SPAREPART | 5031.1009 | SICK GRSE18-N1142 | 260500200 | 1,150,000 | 260300193 | 2026-03-09 | 2026-03-30 | 2 | 1,150,000 | 5 | 260400882 | 2026-04-23 | 45 | 2026-04-06 | Late |
| 260300044 | 2026-03-04 | PERSEDIAAN UMUM | 6060.0688 | MUR M 8 | 260300189 | 145 | 260300189 | 2026-03-09 | 2026-03-17 | 24 | 145 | 5 | 260300782 | 2026-03-17 | 8 | 2026-03-24 | On time |
| 260300045 | 2026-03-04 | PERSEDIAAN UMUM | 6060.069 | RING M 3 | 260300189 | 50 | 260300189 | 2026-03-09 | 2026-03-17 | 20 | 50 | 5 | 260300782 | 2026-03-17 | 8 | 2026-03-24 | On time |
| 260300045 | 2026-03-04 | PERSEDIAAN UMUM | 6060.0689 | BAUT L SS M 3X20 MM + MUR | 260300189 | 750 | 260300189 | 2026-03-09 | 2026-03-17 | 20 | 750 | 5 | 260300782 | 2026-03-17 | 8 | 2026-03-24 | On time |
| 260300046 | 2026-03-04 | PERSEDIAAN UMUM | 6060.0691 | TEKIRO FEELER GAUGE AU-FG1292 | 260300187 | 80,000 | 260300187 | 2026-03-09 | 2026-03-17 | 1 | 80,000 | 5 | 260300480 | 2026-03-11 | 2 | 2026-03-24 | On time |
| 260300047 | 2026-03-04 | PERSEDIAAN UMUM | 6060.0692 | JAKEMY ANTI STATIC ELBOW TWEEZER | 260300188 | 100,000 | 260300188 | 2026-03-09 | 2026-03-17 | 1 | 100,000 | 5 | 260300676 | 2026-03-16 | 7 | 2026-03-24 | On time |
| 260300051 | 2026-03-04 | PERSEDIAAN UMUM | 6060.0638 | BAUT L SS M 4*10 | 260300186 | 425 | 260300186 | 2026-03-09 | 2026-03-17 | 100 | 425 | 5 | 260300657 | 2026-03-16 | 7 | 2026-03-24 | On time |
| 260300052 | 2026-03-04 | SPAREPART | 5011.0179 | BEARING 6900 | 260300191 | 61,000 | 260300191 | 2026-03-09 | 2026-03-17 | 20 | 61,000 | 5 | 260300525 | 2026-03-12 | 3 | 2026-03-24 | On time |
| 260300052 | 2026-03-04 | SPAREPART | 5011.0179 | BEARING 6900 | 260300191 | 61,000 | 260300191 | 2026-03-09 | 2026-03-17 | 20 | 61,000 | 5 | 260300524 | 2026-03-12 | 3 | 2026-03-24 | On time |
| 260300056 | 2026-03-04 | PERSEDIAAN UMUM | 6030.0479 | AQUA PROOF | 260300199 | 58,750 | 260300199 | 2026-03-09 | 2026-03-09 | 48 | 58,750 | 5 | 260300469 | 2026-03-11 | 2 | 2026-03-16 | On time |
| 260300056 | 2026-03-04 | PERSEDIAAN UMUM | 6010.0333 | SERAT FIBER | 260410033 | 5,000 | 260300199 | 2026-03-09 | 2026-03-09 | 500 | 2,500 | 5 | 260300469 | 2026-03-11 | 2 | 2026-03-16 | On time |
| 260300062 | 2026-03-05 | SPAREPART | 5017.0368 | LAMPU SOROT LED PHILIPS 100 W BVP 150 | 260300211 | 850,000 | 260300211 | 2026-03-09 | 2026-03-28 | 4 | 850,000 | 4 | 260300670 | 2026-03-16 | 7 | 2026-04-04 | On time |
| 260300065 | 2026-03-05 | SPAREPART | 5021.0024 | V. BELT A - 105 | 260500263 | 56,600 | 260300184 | 2026-03-09 | 2026-03-16 | 16 | 51,400 | 4 | 260300520 | 2026-03-12 | 3 | 2026-03-23 | On time |
| 260300068 | 2026-03-05 | PERSEDIAAN UMUM | 6060.021 | MUR M 14 | 260500464 | 1,050 | 260300185 | 2026-03-09 | 2026-03-16 | 100 | 975 | 4 | 260300655 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300068 | 2026-03-05 | PERSEDIAAN UMUM | 6060.0211 | MUR M 16 | 260500464 | 1,400 | 260300185 | 2026-03-09 | 2026-03-16 | 100 | 1,330 | 4 | 260300655 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300068 | 2026-03-05 | PERSEDIAAN UMUM | 6060.0239 | RING PLAT M-16 | 260500464 | 605 | 260300185 | 2026-03-09 | 2026-03-16 | 100 | 605 | 4 | 260300655 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300068 | 2026-03-05 | PERSEDIAAN UMUM | 6060.0145 | MUR M 22 | 260300185 | 3,415 | 260300185 | 2026-03-09 | 2026-03-16 | 50 | 3,415 | 4 | 260300655 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300068 | 2026-03-05 | PERSEDIAAN UMUM | 6060.0236 | RING PLAT M-10 | 260500464 | 145 | 260300185 | 2026-03-09 | 2026-03-16 | 100 | 145 | 4 | 260300655 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300068 | 2026-03-05 | PERSEDIAAN UMUM | 6060.0214 | MUR M 24 | 260300185 | 4,750 | 260300185 | 2026-03-09 | 2026-03-16 | 50 | 4,750 | 4 | 260300655 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300068 | 2026-03-05 | PERSEDIAAN UMUM | 6060.0237 | RING PLAT M 12 | 260500464 | 260 | 260300185 | 2026-03-09 | 2026-03-16 | 100 | 260 | 4 | 260300655 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300069 | 2026-03-06 | PERSEDIAAN UMUM | 6050.1631 | PEMBUATAN IMPELER | 260300165 | 30,000,000 | 260300165 | 2026-03-09 | 2026-03-09 | 1 | 30,000,000 | 3 | – | – | – | 2026-03-16 | Overdue |
| 260300074 | 2026-03-04 | PERSEDIAAN UMUM | 6030.2787 | BAUT PORSENG SS M 8X25 | 260300189 | 2,100 | 260300189 | 2026-03-09 | 2026-03-17 | 30 | 2,100 | 5 | 260300782 | 2026-03-17 | 8 | 2026-03-24 | On time |
| 260300077 | 2026-03-07 | SPAREPART | 5011.0025 | BEARING 30208 | 260400011 | 98,900 | 260300183 | 2026-03-09 | 2026-03-16 | 8 | 100,000 | 2 | 260300522 | 2026-03-12 | 3 | 2026-03-23 | On time |
| 260300077 | 2026-03-07 | SPAREPART | 5011.0031 | BEARING 30304 | 260300183 | 65,000 | 260300183 | 2026-03-09 | 2026-03-16 | 12 | 65,000 | 2 | 260300986 | 2026-03-31 | 22 | 2026-03-23 | Late |
| 260300077 | 2026-03-07 | SPAREPART | 5011.0031 | BEARING 30304 | 260300183 | 65,000 | 260300183 | 2026-03-09 | 2026-03-16 | 12 | 65,000 | 2 | 260300522 | 2026-03-12 | 3 | 2026-03-23 | On time |
| 260300086 | 2026-03-07 | SPAREPART | 5011.0568 | BEARING 63311 | 260300264 | 481,981.98 | 260300222 | 2026-03-09 | 2026-03-17 | 2 | 700,000 | 2 | 260300532 | 2026-03-12 | 3 | 2026-03-24 | On time |
| 260300087 | 2026-03-07 | SPAREPART | 5017.0147 | TELE SELECTOR XB4 BD33 | 260300481 | 142,800 | 260300223 | 2026-03-09 | 2026-03-27 | 15 | 137,500 | 2 | 260300534 | 2026-03-12 | 3 | 2026-04-03 | On time |
| 260300087 | 2026-03-07 | SPAREPART | 5017.0145 | TELE SELECTOR XB4 BD21 | 260600252 | 122,900 | 260300223 | 2026-03-09 | 2026-03-27 | 15 | 120,000 | 2 | 260300534 | 2026-03-12 | 3 | 2026-04-03 | On time |
| 260300100 | 2026-03-09 | PERSEDIAAN UMUM | 6030.004 | PIPA GALVANIS 3" 3 INCH | 260300209 | 971,171.17 | 260300209 | 2026-03-09 | 2026-03-09 | 10 | 971,171.17 | – | 260300726 | 2026-03-17 | 8 | 2026-03-16 | Late |
| 260300100 | 2026-03-09 | PERSEDIAAN UMUM | 6030.2446 | CAT MENI SILVER | 260300445 | 33,148.29 | 260300200 | 2026-03-09 | 2026-03-09 | 100 | 32,700 | – | 260300682 | 2026-03-16 | 7 | 2026-03-16 | On time |
| 260300101 | 2026-03-07 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300172 | 2026-03-09 | 2026-03-30 | 1,000 | 53,000 | 2 | – | – | – | 2026-04-06 | Overdue |
| 260300101 | 2026-03-07 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300172 | 2026-03-09 | 2026-03-30 | 1,000 | 53,000 | 2 | 260401014 | 2026-04-28 | 50 | 2026-04-06 | Late |
| 260300101 | 2026-03-07 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300172 | 2026-03-09 | 2026-03-30 | 1,000 | 53,000 | 2 | 260300467 | 2026-03-11 | 2 | 2026-04-06 | On time |
| 260300101 | 2026-03-07 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300172 | 2026-03-09 | 2026-03-30 | 1,000 | 53,000 | 2 | 260300686 | 2026-03-16 | 7 | 2026-04-06 | On time |
| 260300101 | 2026-03-07 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300172 | 2026-03-09 | 2026-03-30 | 1,000 | 53,000 | 2 | 260400231 | 2026-04-08 | 30 | 2026-04-06 | Late |
| 260300102 | 2026-03-07 | BAHAN PEMBANTU | 2024.0001 | OPP 48*100 | 260500055 | 10,495 | 260300170 | 2026-03-09 | 2026-03-12 | 1,656 | 7,000 | 2 | 260400226 | 2026-04-08 | 30 | 2026-03-19 | Late |
| 260300102 | 2026-03-07 | BAHAN PEMBANTU | 2024.0001 | OPP 48*100 | 260500055 | 10,495 | 260300170 | 2026-03-09 | 2026-03-12 | 1,656 | 7,000 | 2 | 260400038 | 2026-04-02 | 24 | 2026-03-19 | Late |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300178 | 2026-03-09 | 2026-03-30 | 600 | 47,000 | 2 | 260400011 | 2026-04-01 | 23 | 2026-04-06 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300178 | 2026-03-09 | 2026-03-30 | 600 | 47,000 | 2 | 260400042 | 2026-04-02 | 24 | 2026-04-06 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300175 | 2026-03-09 | 2026-03-16 | 2,000 | 47,000 | 2 | 260300465 | 2026-03-11 | 2 | 2026-03-23 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300175 | 2026-03-09 | 2026-03-16 | 2,000 | 47,000 | 2 | 260300506 | 2026-03-12 | 3 | 2026-03-23 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300178 | 2026-03-09 | 2026-03-30 | 600 | 47,000 | 2 | 260300958 | 2026-03-30 | 21 | 2026-04-06 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300175 | 2026-03-09 | 2026-03-16 | 2,000 | 47,000 | 2 | 260300761 | 2026-03-17 | 8 | 2026-03-23 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300175 | 2026-03-09 | 2026-03-16 | 2,000 | 47,000 | 2 | 260400664 | 2026-04-20 | 42 | 2026-03-23 | Late |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300178 | 2026-03-09 | 2026-03-30 | 600 | 47,000 | 2 | 260400458 | 2026-04-14 | 36 | 2026-04-06 | Late |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300177 | 2026-03-09 | 2026-03-28 | 500 | 52,000 | 2 | 260500277 | 2026-05-09 | 61 | 2026-04-04 | Late |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300175 | 2026-03-09 | 2026-03-16 | 2,000 | 47,000 | 2 | 260300679 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300175 | 2026-03-09 | 2026-03-16 | 2,000 | 47,000 | 2 | 260300681 | 2026-03-16 | 7 | 2026-03-23 | On time |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300177 | 2026-03-09 | 2026-03-28 | 500 | 52,000 | 2 | 260600580 | 2026-06-15 | 98 | 2026-04-04 | Late |
| 260300105 | 2026-03-07 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600240 | 47,000 | 260300175 | 2026-03-09 | 2026-03-16 | 2,000 | 47,000 | 2 | 260300610 | 2026-03-14 | 5 | 2026-03-23 | On time |
| 260300106 | 2026-03-07 | BAHAN PEMBANTU | 2022.0003 | PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR | 260600221 | 350,000 | 260300176 | 2026-03-09 | 2026-03-30 | 300 | 350,000 | 2 | – | – | – | 2026-04-06 | Overdue |
| 260310001 | 2026-03-02 | SPAREPART | 5024.0624 | MOLD SET (ASSEMBLY) 600X600-2W | 260310065 | 80,000 | 260310065 | 2026-03-09 | 2026-03-09 | 3 | 80,000 | 7 | 260510711 | 2026-05-23 | 75 | 2026-03-16 | Late |
| 260310001 | 2026-03-02 | SPAREPART | 5024.0624 | MOLD SET (ASSEMBLY) 600X600-2W | 260310065 | 80,000 | 260310065 | 2026-03-09 | 2026-03-09 | 3 | 80,000 | 7 | – | – | – | 2026-03-16 | Overdue |
| 260310001 | 2026-03-02 | SPAREPART | 5024.0622 | UPPER GP 600X1350 | 260310066 | 570 | 260310066 | 2026-03-09 | 2026-03-09 | 4 | 570 | 7 | 260510570 | 2026-05-20 | 72 | 2026-03-16 | Late |
| 260310001 | 2026-03-02 | SPAREPART | 5024.0623 | LOWER GP 600X1350 | 260310066 | 530 | 260310066 | 2026-03-09 | 2026-03-09 | 4 | 530 | 7 | 260510570 | 2026-05-20 | 72 | 2026-03-16 | Late |
| 260310001 | 2026-03-02 | SPAREPART | 5024.0621 | MOLD SET GP (ASSEMBLY) 600X1350-1W | 260310081 | 9,300 | 260310064 | 2026-03-09 | 2026-03-09 | 3 | 80,000 | 7 | – | – | – | 2026-03-16 | Overdue |
| 260310012 | 2026-03-04 | PERSEDIAAN UMUM | 6030.2584 | ELBOW 1 1/4 GALVANIS | 260310055 | 12,825 | 260310055 | 2026-03-09 | 2026-03-18 | 3 | 12,825 | 5 | 260310214 | 2026-03-12 | 3 | 2026-03-25 | On time |
| 260310015 | 2026-03-06 | STATIONERY | 6010.0751 | CETAKAN FORM PACKING SORTIR FR-QMS-11 | 260310062 | 80,000 | 260310062 | 2026-03-09 | 2026-03-18 | 20 | 80,000 | 3 | – | – | – | 2026-03-25 | Overdue |
| 260310015 | 2026-03-06 | STATIONERY | 6010.0501 | CETAKAN FORM TILE SHAPE INSPECTION RECORD ( FORM HD01 ) | 260310062 | 80,000 | 260310062 | 2026-03-09 | 2026-03-18 | 2 | 80,000 | 3 | – | – | – | 2026-03-25 | Overdue |
| 260310016 | 2026-03-06 | BAHAN BAKU GLAZE | 1070.0031 | INK DP RED GSB 10023 GUOSE | 260310056 | 120 | 260310056 | 2026-03-09 | 2026-03-09 | 1,000 | 120 | 3 | 260410538 | 2026-04-28 | 50 | 2026-03-16 | Late |
| 260310016 | 2026-03-06 | BAHAN BAKU GLAZE | 1070.003 | INK DP BLACK GSY 99023 GUOSE | 260310056 | 95 | 260310056 | 2026-03-09 | 2026-03-09 | 2,000 | 95 | 3 | 260410538 | 2026-04-28 | 50 | 2026-03-16 | Late |
| 260310016 | 2026-03-06 | BAHAN BAKU GLAZE | 1070.0029 | INK DP YELLOW GSB 20010 GUOSE | 260310056 | 98 | 260310056 | 2026-03-09 | 2026-03-09 | 1,000 | 98 | 3 | 260410538 | 2026-04-28 | 50 | 2026-03-16 | Late |
| 260310017 | 2026-03-06 | BAHAN BAKU BODY | 1010.0025 | CRUDE KAOLIN 101 B | 260510020 | 390 | 260310058 | 2026-03-09 | 2026-03-09 | 4,500,000 | 390 | 3 | 260410584 | 2026-04-30 | 52 | 2026-03-16 | Late |
| 260310017 | 2026-03-06 | BAHAN BAKU BODY | 1010.0025 | CRUDE KAOLIN 101 B | 260510020 | 390 | 260310058 | 2026-03-09 | 2026-03-09 | 4,500,000 | 390 | 3 | – | – | – | 2026-03-16 | Overdue |
| 260310017 | 2026-03-06 | BAHAN BAKU BODY | 1010.0014 | FELDSPAR IN-05 10# | 260610021 | 845 | 260310057 | 2026-03-09 | 2026-03-09 | 5,000,000 | 300 | 3 | – | – | – | 2026-03-16 | Overdue |
| 260310017 | 2026-03-06 | BAHAN BAKU BODY | 1010.0025 | CRUDE KAOLIN 101 B | 260510020 | 390 | 260310058 | 2026-03-09 | 2026-03-09 | 4,500,000 | 390 | 3 | 260410552 | 2026-04-29 | 51 | 2026-03-16 | Late |
| 251100379 | 2025-11-25 | SPAREPART | 5032.1408 | BOLT NO. 4-5 02B0003 (GB10-88 M20X90) | 260300156 | 2 | 260300156 | 2026-03-07 | 2026-08-30 | 14 | 2 | 102 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 251100379 | 2025-11-25 | SPAREPART | 5032.1407 | NUT NO. 4-3 03B0015 (GB6170-2000 M20) | 260300156 | 0.4 | 260300156 | 2026-03-07 | 2026-08-30 | 14 | 0.4 | 102 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 251100379 | 2025-11-25 | SPAREPART | 5032.1406 | HYDRAULIC HOSE NO. 30 06C1716 | 260300156 | 26.1 | 260300156 | 2026-03-07 | 2026-08-30 | 2 | 26.1 | 102 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 251200081 | 2025-12-03 | SPAREPART | 5032.1406 | HYDRAULIC HOSE NO. 30 06C1716 | 260300156 | 26.1 | 260300156 | 2026-03-07 | 2026-08-30 | 2 | 26.1 | 94 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 251200081 | 2025-12-03 | SPAREPART | 5032.1415 | HOSE NO 3 XG953 06C0106/H19/22 II L 1150 | 260300156 | 31.5 | 260300156 | 2026-03-07 | 2026-08-30 | 2 | 31.5 | 94 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 260100193 | 2026-01-15 | SPAREPART | 5032.1457 | PLANETARY CARRIER ASSEM NO 17 ( 51C0090 ) | 260300156 | 504.3 | 260300156 | 2026-03-07 | 2026-08-30 | 2 | 504.3 | 51 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 260100193 | 2026-01-15 | SPAREPART | 5032.1454 | RING HUB NO 14 (41A0031) | 260300156 | 126.1 | 260300156 | 2026-03-07 | 2026-08-30 | 2 | 126.1 | 51 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 260100193 | 2026-01-15 | SPAREPART | 5032.1455 | SNAP RING NO 15 (07B0054) | 260300156 | 11.7 | 260300156 | 2026-03-07 | 2026-08-30 | 2 | 11.7 | 51 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 260100193 | 2026-01-15 | SPAREPART | 5032.1456 | RING GEAR NO 16 ( 42A0005 ) | 260300156 | 200 | 260300156 | 2026-03-07 | 2026-08-30 | 2 | 200 | 51 | 260600386 | 2026-06-10 | 95 | 2026-09-06 | On time |
| 260100524 | 2026-02-09 | SPAREPART | 5030.1387 | CLAMP 8320531403 | 260300143 | 10.21 | 260300143 | 2026-03-07 | 2026-06-30 | 15 | 10.21 | 26 | – | – | – | 2026-07-07 | Outstanding |
| 260100573 | 2026-02-10 | SPAREPART | 5030.0305 | RUBBER ROLL () (out) 55 mm * (in) 49 mm | 260300157 | 1.1 | 260300157 | 2026-03-07 | 2026-08-30 | 200 | 1.1 | 25 | 260600425 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100573 | 2026-02-10 | SPAREPART | 5030.0305 | RUBBER ROLL () (out) 55 mm * (in) 49 mm | 260300157 | 1.1 | 260300157 | 2026-03-07 | 2026-08-30 | 200 | 1.1 | 25 | – | – | – | 2026-09-06 | Outstanding |
| 260100614 | 2026-02-13 | SPAREPART | 5030.1795 | BATTERAI CSB HR 1234W F2 12V 34W | 260300143 | 30 | 260300143 | 2026-03-07 | 2026-06-30 | 22 | 30 | 22 | – | – | – | 2026-07-07 | Outstanding |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0022 | INK - CIK RC 1116 SINKING | 260500301 | 262,188 | 260300158 | 2026-03-07 | 2026-03-27 | 120 | 260,682 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0022 | INK - CIK RC 1116 SINKING | 260500301 | 262,188 | 260300158 | 2026-03-07 | 2026-03-27 | 120 | 260,682 | 17 | 260301020 | 2026-03-31 | 24 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0022 | INK - CIK RC 1116 SINKING | 260500301 | 262,188 | 260300158 | 2026-03-07 | 2026-03-27 | 120 | 260,682 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0015 | INK - CIK GL 1219 GLOSSY | 260600139 | 256,202 | 260300158 | 2026-03-07 | 2026-03-27 | 144 | 248,932 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0003 | INK - CIK BG 9154 BEIGE | 260500234 | 151,624 | 260300158 | 2026-03-07 | 2026-03-27 | 12 | 150,753 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0001 | INK - CIK RO 4118 PINK | 260600030 | 231,196 | 260300158 | 2026-03-07 | 2026-03-27 | 12 | 224,636 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0006 | INK - CIK NE 6153 BLACK | 260600246 | 259,276 | 260300158 | 2026-03-07 | 2026-03-27 | 300 | 231,806 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0007 | INK - CIK RC 1151 SINKING | 260600273 | 284,281 | 260300158 | 2026-03-07 | 2026-03-27 | 192 | 276,215 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0007 | INK - CIK RC 1151 SINKING | 260600273 | 284,281 | 260300158 | 2026-03-07 | 2026-03-27 | 192 | 276,215 | 17 | 260301020 | 2026-03-31 | 24 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0006 | INK - CIK NE 6153 BLACK | 260600246 | 259,276 | 260300158 | 2026-03-07 | 2026-03-27 | 300 | 231,806 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0002 | INK - CIK AM 5118 YELLOW | 260600273 | 179,341 | 260300158 | 2026-03-07 | 2026-03-27 | 360 | 174,253 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0002 | INK - CIK AM 5118 YELLOW | 260600273 | 179,341 | 260300158 | 2026-03-07 | 2026-03-27 | 360 | 174,253 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0005 | INK - CIK MA 5115 BROWN | 260600273 | 145,523 | 260300158 | 2026-03-07 | 2026-03-27 | 654 | 141,394 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0005 | INK - CIK MA 5115 BROWN | 260600273 | 145,523 | 260300158 | 2026-03-07 | 2026-03-27 | 654 | 141,394 | 17 | 260300858 | 2026-03-26 | 19 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0005 | INK - CIK MA 5115 BROWN | 260600273 | 145,523 | 260300158 | 2026-03-07 | 2026-03-27 | 654 | 141,394 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0007 | INK - CIK RC 1151 SINKING | 260600273 | 284,281 | 260300158 | 2026-03-07 | 2026-03-27 | 192 | 276,215 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0004 | INK - CIK AZ 1111 BLUE | 260600273 | 298,629 | 260300158 | 2026-03-07 | 2026-03-27 | 528 | 274,423 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0004 | INK - CIK AZ 1111 BLUE | 260600273 | 298,629 | 260300158 | 2026-03-07 | 2026-03-27 | 528 | 274,423 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0004 | INK - CIK AZ 1111 BLUE | 260600273 | 298,629 | 260300158 | 2026-03-07 | 2026-03-27 | 528 | 274,423 | 17 | 260300858 | 2026-03-26 | 19 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0021 | INK - CIK NE 1170 BLACK | 260500301 | 223,330 | 260300158 | 2026-03-07 | 2026-03-27 | 384 | 203,328 | 17 | 260300858 | 2026-03-26 | 19 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0019 | INK - CIK AZ 1165 BLUE | 260600119 | 228,327 | 260300158 | 2026-03-07 | 2026-03-27 | 192 | 206,116 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0019 | INK - CIK AZ 1165 BLUE | 260600119 | 228,327 | 260300158 | 2026-03-07 | 2026-03-27 | 192 | 206,116 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0019 | INK - CIK AZ 1165 BLUE | 260600119 | 228,327 | 260300158 | 2026-03-07 | 2026-03-27 | 192 | 206,116 | 17 | 260300858 | 2026-03-26 | 19 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.002 | INK - CIK MA 5457 BROWN | 260600246 | 97,972 | 260300158 | 2026-03-07 | 2026-03-27 | 618 | 95,192 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.002 | INK - CIK MA 5457 BROWN | 260600246 | 97,972 | 260300158 | 2026-03-07 | 2026-03-27 | 618 | 95,192 | 17 | 260300858 | 2026-03-26 | 19 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.002 | INK - CIK MA 5457 BROWN | 260600246 | 97,972 | 260300158 | 2026-03-07 | 2026-03-27 | 618 | 95,192 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0018 | INK - CIK AM 5456 YELLOW | 260400292 | 144,980 | 260300158 | 2026-03-07 | 2026-03-27 | 654 | 147,368 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0021 | INK - CIK NE 1170 BLACK | 260500301 | 223,330 | 260300158 | 2026-03-07 | 2026-03-27 | 384 | 203,328 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0018 | INK - CIK AM 5456 YELLOW | 260400292 | 144,980 | 260300158 | 2026-03-07 | 2026-03-27 | 654 | 147,368 | 17 | 260300858 | 2026-03-26 | 19 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0021 | INK - CIK NE 1170 BLACK | 260500301 | 223,330 | 260300158 | 2026-03-07 | 2026-03-27 | 384 | 203,328 | 17 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100697 | 2026-02-18 | BAHAN BAKU GLAZE | 1070.0018 | INK - CIK AM 5456 YELLOW | 260400292 | 144,980 | 260300158 | 2026-03-07 | 2026-03-27 | 654 | 147,368 | 17 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100748 | 2026-02-20 | SPAREPART | 5032.1468 | PUMP ASM : MATER W/GASKET NO. 1 (A) 897028-5920 | 260300157 | 63 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 63 | 15 | – | – | – | 2026-09-06 | Outstanding |
| 260100748 | 2026-02-20 | SPAREPART | 5032.1468 | PUMP ASM : MATER W/GASKET NO. 1 (A) 897028-5920 | 260300157 | 63 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 63 | 15 | 260600424 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100749 | 2026-02-20 | SPAREPART | 5032.1471 | DRIVE SHAFT ASSEM NO. 13 51C0067 | 260300157 | 152 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 152 | 15 | – | – | – | 2026-09-06 | Outstanding |
| 260100749 | 2026-02-20 | SPAREPART | 5032.1471 | DRIVE SHAFT ASSEM NO. 13 51C0067 | 260300157 | 152 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 152 | 15 | 260600424 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100749 | 2026-02-20 | SPAREPART | 5032.1469 | DRIVE SHAFT ASSEM NO. 7 51C0068 | 260300157 | 111 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 111 | 15 | – | – | – | 2026-09-06 | Outstanding |
| 260100749 | 2026-02-20 | SPAREPART | 5032.147 | DRIVE SHAFT ASSEM NO. 10 41C0071 | 260300157 | 155 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 155 | 15 | – | – | – | 2026-09-06 | Outstanding |
| 260100749 | 2026-02-20 | SPAREPART | 5032.147 | DRIVE SHAFT ASSEM NO. 10 41C0071 | 260300157 | 155 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 155 | 15 | 260600424 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100749 | 2026-02-20 | SPAREPART | 5032.1469 | DRIVE SHAFT ASSEM NO. 7 51C0068 | 260300157 | 111 | 260300157 | 2026-03-07 | 2026-08-30 | 2 | 111 | 15 | 260600424 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100750 | 2026-02-20 | SPAREPART | 5032.1472 | WATER PUMP C20AB20AB601+G | 260600058 | 168 | 260300157 | 2026-03-07 | 2026-08-30 | 1 | 168 | 15 | – | – | – | 2026-09-06 | Outstanding |
| 260100750 | 2026-02-20 | SPAREPART | 5032.1472 | WATER PUMP C20AB20AB601+G | 260600058 | 168 | 260300157 | 2026-03-07 | 2026-08-30 | 1 | 168 | 15 | 260600424 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100750 | 2026-02-20 | SPAREPART | 5032.1473 | COMPRESSOR ENGINE | 260300157 | 225 | 260300157 | 2026-03-07 | 2026-08-30 | 1 | 225 | 15 | – | – | – | 2026-09-06 | Outstanding |
| 260100750 | 2026-02-20 | SPAREPART | 5032.1473 | COMPRESSOR ENGINE | 260300157 | 225 | 260300157 | 2026-03-07 | 2026-08-30 | 1 | 225 | 15 | 260600424 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.1895 | ELBOW LAS BESI 2 INCH | 260300144 | 19,369.37 | 260300144 | 2026-03-07 | 2026-03-07 | 2 | 19,369.37 | 15 | 260300450 | 2026-03-11 | 4 | 2026-03-14 | On time |
| 260100769 | 2026-02-21 | SPAREPART | 5029.0497 | RUBBER ROLL ( OUT ) 71 MM * ( IN ) 65 MM | 260300157 | 1.5 | 260300157 | 2026-03-07 | 2026-08-30 | 350 | 1.5 | 14 | – | – | – | 2026-09-06 | Outstanding |
| 260100769 | 2026-02-21 | SPAREPART | 5029.0497 | RUBBER ROLL ( OUT ) 71 MM * ( IN ) 65 MM | 260300157 | 1.5 | 260300157 | 2026-03-07 | 2026-08-30 | 350 | 1.5 | 14 | 260600425 | 2026-06-11 | 96 | 2026-09-06 | On time |
| 260100814 | 2026-02-24 | SPAREPART | 5031.013 | LEM TIP TOP SC 2000 | 260300146 | 572,072.07 | 260300146 | 2026-03-07 | 2026-03-07 | 2 | 572,072.07 | 11 | 260300562 | 2026-03-13 | 6 | 2026-03-14 | On time |
| 260100881 | 2026-02-25 | BAHAN BAKU GLAZE | 1070.0017 | SOLVENT (HARD) - CIK PL 0101 | 260300494 | 118,890 | 260300158 | 2026-03-07 | 2026-03-27 | 32 | 118,890 | 10 | 260300560 | 2026-03-13 | 6 | 2026-04-03 | On time |
| 260100881 | 2026-02-25 | BAHAN BAKU GLAZE | 1070.0017 | SOLVENT (HARD) - CIK PL 0101 | 260300494 | 118,890 | 260300158 | 2026-03-07 | 2026-03-27 | 32 | 118,890 | 10 | 260300664 | 2026-03-16 | 9 | 2026-04-03 | On time |
| 260100916 | 2026-02-28 | SPAREPART | 5030.1801 | GASKET 9452000044 | 260300155 | 26,287 | 260300155 | 2026-03-07 | 2026-04-30 | 20 | 26,287 | 7 | – | – | – | 2026-05-07 | Overdue |
| 260100916 | 2026-02-28 | SPAREPART | 5030.1801 | GASKET 9452000044 | 260300155 | 26,287 | 260300155 | 2026-03-07 | 2026-04-30 | 20 | 26,287 | 7 | 260401082 | 2026-04-29 | 53 | 2026-05-07 | On time |
| 260100928 | 2026-02-28 | SPAREPART | 5030.0993 | GROMMET TJ-ORG-PRT03 C9490010092 | 260300155 | 95,590 | 260300155 | 2026-03-07 | 2026-04-30 | 7 | 95,590 | 7 | 260500699 | 2026-05-21 | 75 | 2026-05-07 | Late |
| 260100928 | 2026-02-28 | SPAREPART | 5030.1802 | GOMMINO GRANDE PER TESTA NZ ( POS.28 DIS.) NO. 20 JT-GMP-PRT14 C9999660006 | 260300155 | 85,633 | 260300155 | 2026-03-07 | 2026-04-30 | 20 | 85,633 | 7 | – | – | – | 2026-05-07 | Overdue |
| 260110090 | 2026-02-07 | PERSEDIAAN UMUM | 6030.038 | PLAT STRIP BAJA 10X30X6000 MM | 260310050 | 138,000 | 260310050 | 2026-03-07 | 2026-03-07 | 3 | 138,000 | 28 | 260310396 | 2026-03-31 | 24 | 2026-03-14 | Late |
| 260110127 | 2026-02-24 | PERSEDIAAN UMUM | 6020.0037 | BATERAI ALKALINE AAA | 260500025 | 24,000 | 260310054 | 2026-03-07 | 2026-03-07 | 4 | 39,520 | 11 | 260310209 | 2026-03-12 | 5 | 2026-03-14 | On time |
| 260110130 | 2026-02-26 | PERSEDIAAN UMUM | 6030.0962 | PAKU COR 7 CM | 260310053 | 29,386 | 260310053 | 2026-03-07 | 2026-03-07 | 2 | 29,386 | 9 | 260310222 | 2026-03-12 | 5 | 2026-03-14 | On time |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.2764 | PLAT BORDES 8X1200X2400 MM | 260310051 | 2,136,000 | 260310051 | 2026-03-07 | 2026-03-07 | 40 | 2,136,000 | 9 | 260310226 | 2026-03-12 | 5 | 2026-03-14 | On time |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.2445 | BESI SIKU 40X40X4 MM SNI | 260310052 | 145,000 | 260310052 | 2026-03-07 | 2026-03-07 | 30 | 145,000 | 9 | 260310397 | 2026-03-31 | 24 | 2026-03-14 | Late |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.0898 | BESI UNP 100X50X5MM (@ 6000MM) SNI | 260610067 | 576,000 | 260310051 | 2026-03-07 | 2026-03-07 | 60 | 559,440 | 9 | 260310226 | 2026-03-12 | 5 | 2026-03-14 | On time |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6050.1377 | 3M ULTRAFIT CORDED EARPLUGS | 260310049 | 14,620 | 260310049 | 2026-03-07 | 2026-03-07 | 10 | 14,620 | 9 | 260310221 | 2026-03-12 | 5 | 2026-03-14 | On time |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.2765 | BESI SIKU 70X70X6 MM SNI | 260310051 | 384,000 | 260310051 | 2026-03-07 | 2026-03-07 | 6 | 384,000 | 9 | 260310226 | 2026-03-12 | 5 | 2026-03-14 | On time |
| 260300002 | 2026-03-02 | SPAREPART | 5026.0125 | OLEO HOSE ID4 - FLURELAST/70 FI 90001251 | 260300155 | 279,601 | 260300155 | 2026-03-07 | 2026-04-30 | 20 | 279,601 | 5 | 260500699 | 2026-05-21 | 75 | 2026-05-07 | Late |
| 260300002 | 2026-03-02 | SPAREPART | 5026.0239 | MOLLA A GAS C=450 DD=14/28 1300N 2389SO STABILUS + 2 90002033 | 260300155 | 3,704,112 | 260300155 | 2026-03-07 | 2026-04-30 | 1 | 3,704,112 | 5 | 260300410 | 2026-03-10 | 3 | 2026-05-07 | On time |
| 260300002 | 2026-03-02 | SPAREPART | 5026.0153 | 90001252 TUBO 6X9 MM INK CERAMIC - FLURELAST/ 70 FIMO | 260300155 | 427,765 | 260300155 | 2026-03-07 | 2026-04-30 | 20 | 427,765 | 5 | 260600308 | 2026-06-09 | 94 | 2026-05-07 | Late |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0225 | SPRING FOR NZ HEAD C9999660027 | 260300155 | 38,236 | 260300155 | 2026-03-07 | 2026-04-30 | 20 | 38,236 | 5 | – | – | – | 2026-05-07 | Overdue |
| 260300004 | 2026-03-02 | SPAREPART | 5030.1802 | GOMMINO GRANDE PER TESTA NZ ( POS.28 DIS.) NO. 20 JT-GMP-PRT14 C9999660006 | 260300155 | 85,633 | 260300155 | 2026-03-07 | 2026-04-30 | 10 | 85,633 | 5 | – | – | – | 2026-05-07 | Overdue |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0225 | SPRING FOR NZ HEAD C9999660027 | 260300155 | 38,236 | 260300155 | 2026-03-07 | 2026-04-30 | 20 | 38,236 | 5 | 260401083 | 2026-04-29 | 53 | 2026-05-07 | On time |
| 260300019 | 2026-03-03 | PERSEDIAAN UMUM | 6030.2714 | PIPA STAINLESS OD 60 TEBAL 3 PANJANG 3540 MM ( TEMPERATURE 800⁰C ) | 260300161 | 1,750,000 | 260300161 | 2026-03-07 | 2026-03-07 | 7 | 1,750,000 | 4 | 260400616 | 2026-04-17 | 41 | 2026-03-14 | Late |
| 260300019 | 2026-03-03 | PERSEDIAAN UMUM | 6030.2714 | PIPA STAINLESS OD 60 TEBAL 3 PANJANG 3540 MM ( TEMPERATURE 800⁰C ) | 260300161 | 1,750,000 | 260300161 | 2026-03-07 | 2026-03-07 | 7 | 1,750,000 | 4 | 260400796 | 2026-04-22 | 46 | 2026-03-14 | Late |
| 260300073 | 2026-03-04 | PERSEDIAAN UMUM | 6050.0034 | LPG 50 KG | 260600166 | 1,300,000 | 260300145 | 2026-03-07 | 2026-03-07 | 2 | 1,000,000 | 3 | 260300328 | 2026-03-09 | 2 | 2026-03-14 | On time |
| 260100319 | 2026-01-24 | FIXED ASSETS | AST02614 | LOWER PUNCH 30 X 60 (315X624X33MM) SHR 3.5% U/ RECTIFIED HLTYP4209L | 260300149 | 3,200,000 | 260300149 | 2026-03-06 | 2026-04-10 | 15 | 3,200,000 | 41 | – | – | – | 2026-04-17 | Overdue |
| 260100342 | 2026-01-26 | FIXED ASSETS | AST02609 | UPPER ISOSTATIC PUNCH 30 X 60 (315X624X50MM) SHR 3.5% U/ RECTIFIED HLTYP4209L | 260300147 | 5,000,000 | 260300147 | 2026-03-06 | 2026-04-06 | 15 | 5,000,000 | 39 | – | – | – | 2026-04-13 | Overdue |
| 260100656 | 2026-02-16 | PERSEDIAAN UMUM | 6050.1366 | SYSTEM ALARM MOBIL | 260300160 | 145,000 | 260300160 | 2026-03-06 | 2026-03-13 | 1 | 145,000 | 18 | 260300588 | 2026-03-13 | 7 | 2026-03-20 | On time |
| 260100670 | 2026-02-16 | SPAREPART | 5027.0464 | PULLY B2 2.3 INCH BEARING 6200 + SNAPRING | 260300138 | 120,000 | 260300138 | 2026-03-06 | 2026-04-07 | 80 | 120,000 | 18 | – | – | – | 2026-04-14 | Overdue |
| 260100740 | 2026-02-20 | PERSEDIAAN UMUM | 6030.273 | FLEXIBLE JOINT TWINFLEX 3 INCH + FLANGE | 260300416 | 795,000 | 260300150 | 2026-03-06 | 2026-03-17 | 1 | 795,000 | 14 | 260300348 | 2026-03-09 | 3 | 2026-03-24 | On time |
| 260100740 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2312 | ELBOW LAS 3 INCH | 260300150 | 59,000 | 260300150 | 2026-03-06 | 2026-03-17 | 6 | 59,000 | 14 | 260300348 | 2026-03-09 | 3 | 2026-03-24 | On time |
| 260100740 | 2026-02-20 | PERSEDIAAN UMUM | 6030.0065 | PLENDES 3 INCH | 260300268 | 97,500 | 260300150 | 2026-03-06 | 2026-03-17 | 16 | 51,000 | 14 | 260300348 | 2026-03-09 | 3 | 2026-03-24 | On time |
| 260100740 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2729 | PIPA MEDIUM GALVANIS 3 INCH | 260300148 | 468,018.02 | 260300148 | 2026-03-06 | 2026-03-14 | 3 | 468,018.02 | 14 | 260300576 | 2026-03-13 | 7 | 2026-03-21 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2735 | HANGER CLAM 3 INCH | 260300116 | 19,800 | 260300116 | 2026-03-06 | 2026-03-06 | 10 | 19,800 | 14 | 260300432 | 2026-03-10 | 4 | 2026-03-13 | On time |
| 260100774 | 2026-02-20 | BAHAN BAKU GLAZE | 1098.0014 | STPP (Sodium Tripolyphospate) | 260600045 | 25,700 | 260300124 | 2026-03-06 | 2026-03-30 | 2,500 | 23,000 | 14 | 260301019 | 2026-03-31 | 25 | 2026-04-06 | On time |
| 260100774 | 2026-02-20 | BAHAN BAKU GLAZE | 1098.0014 | STPP (Sodium Tripolyphospate) | 260600045 | 25,700 | 260300124 | 2026-03-06 | 2026-03-30 | 2,500 | 23,000 | 14 | 260300875 | 2026-03-26 | 20 | 2026-04-06 | On time |
| 260100775 | 2026-02-20 | BAHAN BAKU GLAZE | 1098.0004 | CMC C-20 | 260600049 | 85,475.6 | 260300122 | 2026-03-06 | 2026-03-12 | 800 | 82,413.1 | 14 | 260300497 | 2026-03-12 | 6 | 2026-03-19 | On time |
| 260100776 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0024 | ALUMINA A-10 | 260600048 | 12,036.36 | 260300122 | 2026-03-06 | 2026-03-12 | 6,000 | 11,605.11 | 14 | 260300497 | 2026-03-12 | 6 | 2026-03-19 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300126 | 2026-03-06 | 2026-03-31 | 145,000 | 7,453.75 | 14 | 260300861 | 2026-03-26 | 20 | 2026-04-07 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300126 | 2026-03-06 | 2026-03-31 | 145,000 | 7,453.75 | 14 | 260300927 | 2026-03-30 | 24 | 2026-04-07 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300126 | 2026-03-06 | 2026-03-31 | 145,000 | 7,453.75 | 14 | 260300856 | 2026-03-26 | 20 | 2026-04-07 | On time |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300126 | 2026-03-06 | 2026-03-31 | 145,000 | 7,453.75 | 14 | 260400242 | 2026-04-09 | 34 | 2026-04-07 | Late |
| 260100777 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0025 | TITANIUM FRIT K - 0810 | 260600041 | 7,898.75 | 260300126 | 2026-03-06 | 2026-03-31 | 145,000 | 7,453.75 | 14 | 260300928 | 2026-03-30 | 24 | 2026-04-07 | On time |
| 260100779 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260300129 | 2026-03-06 | 2026-04-06 | 48,000 | 1,225 | 14 | 260400092 | 2026-04-04 | 29 | 2026-04-13 | On time |
| 260100779 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0027 | SILICA 200 ID | 260600038 | 1,316 | 260300129 | 2026-03-06 | 2026-04-06 | 48,000 | 1,225 | 14 | 260400188 | 2026-04-08 | 33 | 2026-04-13 | On time |
| 260100781 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.005 | COMPOUND FRIT UC 3025 | 260600035 | 8,574.24 | 260300130 | 2026-03-06 | 2026-03-13 | 6,000 | 8,043.84 | 14 | 260300702 | 2026-03-17 | 11 | 2026-03-20 | On time |
| 260100783 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260300132 | 2026-03-06 | 2026-04-15 | 50,000 | 2,500 | 14 | 260400380 | 2026-04-11 | 36 | 2026-04-22 | On time |
| 260100783 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0019 | KAOLIN NOODLE KS-02 | 260600047 | 2,540 | 260300132 | 2026-03-06 | 2026-04-15 | 50,000 | 2,500 | 14 | 260500831 | 2026-05-26 | 81 | 2026-04-22 | Late |
| 260100784 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.001 | TRANSPARENT FRIT XIT-6315 | 260600052 | 6,541.5 | 260300123 | 2026-03-06 | 2026-03-30 | 25,000 | 6,307.12 | 14 | 260300666 | 2026-03-16 | 10 | 2026-04-06 | On time |
| 260100785 | 2026-02-20 | BAHAN BAKU GLAZE | 1099.0023 | BENTONITE LGI | 260300141 | 6,750 | 260300141 | 2026-03-06 | 2026-03-11 | 2,000 | 6,750 | 14 | 260300500 | 2026-03-12 | 6 | 2026-03-18 | On time |
| 260100786 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260300123 | 2026-03-06 | 2026-03-30 | 30,000 | 7,736.74 | 14 | 260300666 | 2026-03-16 | 10 | 2026-04-06 | On time |
| 260100786 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260300123 | 2026-03-06 | 2026-03-30 | 30,000 | 7,736.74 | 14 | 260300701 | 2026-03-17 | 11 | 2026-04-06 | On time |
| 260100787 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260300121 | 2026-03-06 | 2026-03-30 | 25,000 | 7,989.03 | 14 | 260400531 | 2026-04-16 | 41 | 2026-04-06 | Late |
| 260100787 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260300121 | 2026-03-06 | 2026-03-30 | 25,000 | 7,989.03 | 14 | 260400119 | 2026-04-06 | 31 | 2026-04-06 | On time |
| 260100793 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0063 | TRANSPARENT FRIT FJ 9828 B | 260600080 | 9,333 | 260300131 | 2026-03-06 | 2026-03-30 | 15,000 | 8,998 | 14 | 260300855 | 2026-03-26 | 20 | 2026-04-06 | On time |
| 260100794 | 2026-02-20 | BAHAN BAKU GLAZE | 1030.0062 | TRANSPARENT FRIT K 0248 | 260600043 | 8,786.25 | 260300125 | 2026-03-06 | 2026-03-13 | 15,000 | 8,291.25 | 14 | 260300598 | 2026-03-14 | 8 | 2026-03-20 | On time |
| 260100839 | 2026-02-23 | BAHAN BAKU BODY | 1098.0005 | WATERGLASS (SODIUM SILICATE) | 260500416 | 2,650 | 260300127 | 2026-03-06 | 2026-04-01 | 60,000 | 2,330 | 11 | – | – | – | 2026-04-08 | Overdue |
| 260100840 | 2026-02-24 | BAHAN BAKU GLAZE | 1099.0007 | ENGOBE UNDER TILE WE-80 | 260600082 | 3,400 | 260300128 | 2026-03-06 | 2026-03-13 | 9,000 | 3,400 | 10 | 260301018 | 2026-03-31 | 25 | 2026-03-20 | Late |
| 260100841 | 2026-02-24 | BAHAN BAKU GLAZE | 1098.0006 | PS-8000 | 260600276 | 20,060.6 | 260300122 | 2026-03-06 | 2026-03-12 | 2,000 | 18,500.9 | 10 | 260300497 | 2026-03-12 | 6 | 2026-03-19 | On time |
| 260100848 | 2026-02-25 | PERSEDIAAN UMUM | 6050.0502 | VERNIER CALIPER DIGITAL MITUTOYO (536/211) 150 MM | 260300409 | 665,000 | 260300159 | 2026-03-06 | 2026-03-13 | 3 | 665,000 | 9 | 260300481 | 2026-03-11 | 5 | 2026-03-20 | On time |
| 260100910 | 2026-02-28 | PERSEDIAAN UMUM | 6030.2775 | PLAT STRIP 50X8X600MM | 260300151 | 255,000 | 260300151 | 2026-03-06 | 2026-03-16 | 1 | 255,000 | 6 | 260300541 | 2026-03-12 | 6 | 2026-03-23 | On time |
| 260100910 | 2026-02-28 | PERSEDIAAN UMUM | 6030.2776 | BESI VERKAN 10 X 10 @6 METER | 260500005 | 122,522.52 | 260300140 | 2026-03-06 | 2026-03-14 | 1 | 29,729.73 | 6 | 260400427 | 2026-04-13 | 38 | 2026-03-21 | Late |
| 260100910 | 2026-02-28 | PERSEDIAAN UMUM | 6030.1954 | BESI HOLO GALVANIS 40X40X6000 MM TEBAL 3 MM | 260300140 | 193,693.69 | 260300140 | 2026-03-06 | 2026-03-14 | 3 | 193,693.69 | 6 | 260400427 | 2026-04-13 | 38 | 2026-03-21 | Late |
| 260100917 | 2026-02-28 | SPAREPART | 5029.0499 | HELICAL GEARBOX MOTOVARIO TYPE HA42 RATIO 1:35.4 + MOTOR MOTOVARIO TYPE TH71B4 0.37KW 1400RPM | 260300152 | 5,250,000 | 260300152 | 2026-03-06 | 2026-03-16 | 2 | 5,250,000 | 6 | 260300531 | 2026-03-12 | 6 | 2026-03-23 | On time |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0628 | KUNCI INGGRIS 10 INCH | 260300153 | 80,810.81 | 260300153 | 2026-03-06 | 2026-03-16 | 1 | 80,810.81 | 6 | 260500905 | 2026-05-28 | 83 | 2026-03-23 | Late |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6030.0166 | KAWAT LAS RB 26 2.6 MM | 260600013 | 33,333.33 | 260300153 | 2026-03-06 | 2026-03-16 | 20 | 29,729.73 | 6 | 260500905 | 2026-05-28 | 83 | 2026-03-23 | Late |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0428 | TANG KOMBINASI 8 INCH | 260510259 | 46,846.85 | 260300153 | 2026-03-06 | 2026-03-16 | 1 | 55,000 | 6 | 260500905 | 2026-05-28 | 83 | 2026-03-23 | Late |
| 260100923 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0034 | LPG 50 KG | 260600166 | 1,300,000 | 260300139 | 2026-03-06 | 2026-03-16 | 2 | 1,000,000 | 6 | 260300815 | 2026-03-18 | 12 | 2026-03-23 | On time |
| 260100925 | 2026-02-28 | SPAREPART | 5010.0034 | OIL BYPASS FILTER LF 777 | 260300154 | 315,000 | 260300154 | 2026-03-06 | 2026-03-16 | 2 | 315,000 | 6 | 260300389 | 2026-03-10 | 4 | 2026-03-23 | On time |
| 260100925 | 2026-02-28 | SPAREPART | 5010.0051 | WATER FILTER (COOLANT FILTER) DONALDSON J86-400 76 | 260300154 | 300,000 | 260300154 | 2026-03-06 | 2026-03-16 | 2 | 300,000 | 6 | 260300389 | 2026-03-10 | 4 | 2026-03-23 | On time |
| 260100925 | 2026-02-28 | SPAREPART | 5010.0053 | LUBE FILTER DONALDSON P551670 | 260300154 | 215,000 | 260300154 | 2026-03-06 | 2026-03-16 | 5 | 215,000 | 6 | 260300389 | 2026-03-10 | 4 | 2026-03-23 | On time |
| 260100925 | 2026-02-28 | SPAREPART | 5010.0052 | FUEL FILTER DONALDSON P550687 | 260300154 | 410,000 | 260300154 | 2026-03-06 | 2026-03-16 | 2 | 410,000 | 6 | 260300389 | 2026-03-10 | 4 | 2026-03-23 | On time |
| 260100930 | 2026-02-24 | BAHAN BAKAR | 4010.0001 | SOLAR | 260600111 | 20,720.72 | 260300120 | 2026-03-06 | 2026-03-12 | 8,000 | 14,414.41 | 10 | 260300494 | 2026-03-12 | 6 | 2026-03-19 | On time |
| 260300015 | 2026-03-03 | SPAREPART | 5011.056 | BEARING UCT 211 | 260300134 | 371,300 | 260300134 | 2026-03-06 | 2026-03-06 | 10 | 371,300 | 3 | 260300459 | 2026-03-11 | 5 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310302 | 2026-03-16 | 10 | 2026-03-13 | Late |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310170 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310175 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310174 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310178 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310176 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310181 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310180 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310177 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310179 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310172 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310171 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310173 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310184 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | 260310185 | 2026-03-09 | 3 | 2026-03-13 | On time |
| 260310011 | 2026-03-04 | BAHAN BAKAR | 4020.0001 | BATU BARA ADB 6100 - 6300 | 260610161 | 1,700 | 260310041 | 2026-03-06 | 2026-03-06 | 500,000 | 1,700 | 2 | – | – | – | 2026-03-13 | Overdue |
| 260310013 | 2026-03-05 | BAHAN BAKU BODY | 1010.0018 | CLAY AB 76# | 260610178 | 390 | 260310042 | 2026-03-06 | 2026-03-06 | 3,000,000 | 390 | 1 | – | – | – | 2026-03-13 | Overdue |
| 260310013 | 2026-03-05 | BAHAN BAKU BODY | 1010.0018 | CLAY AB 76# | 260610178 | 390 | 260310042 | 2026-03-06 | 2026-03-06 | 3,000,000 | 390 | 1 | 260510038 | 2026-05-04 | 59 | 2026-03-13 | Late |
| 260310013 | 2026-03-05 | BAHAN BAKU BODY | 1010.0018 | CLAY AB 76# | 260610178 | 390 | 260310042 | 2026-03-06 | 2026-03-06 | 3,000,000 | 390 | 1 | – | – | – | 2026-03-13 | Overdue |
| 260310014 | 2026-03-05 | PERSEDIAAN UMUM | 6030.1791 | WD CUTTING 4 INCH | 260610042 | 3,300 | 260310048 | 2026-03-06 | 2026-03-17 | 1,000 | 3,000 | 1 | 260410013 | 2026-04-02 | 27 | 2026-03-24 | Late |
| 260100086 | 2026-01-08 | SPAREPART | 5030.0708 | PNEUMATIC STRAPPING TOOL XQD-19 | 260600022 | 6,550,000 | 260300101 | 2026-03-05 | 2026-03-05 | 2 | 8,500,000 | 56 | 260300625 | 2026-03-14 | 9 | 2026-03-12 | Late |
| 260100418 | 2026-01-30 | SPAREPART | 5012.024 | KARET SEAL TAHAN PANAS DL 69.5 DD 63.5 TEBAL 1 CM LEBAR 3 CM | 260300085 | 3,400,000 | 260300085 | 2026-03-05 | 2026-03-27 | 4 | 3,400,000 | 34 | – | – | – | 2026-04-03 | Overdue |
| 260100619 | 2026-02-13 | SPAREPART | 5029.0489 | SELONGSONG SENJATA SILIKON KARBIDA P 380MM ID 72 MM OD 55 MM | 260300110 | 16.5 | 260300110 | 2026-03-05 | 2026-03-05 | 120 | 16.5 | 20 | 260400086 | 2026-04-04 | 30 | 2026-03-12 | Late |
| 260100619 | 2026-02-13 | SPAREPART | 5029.0487 | SELONGSONG SENJATA SILIKON KARBIDA P 1100 MM ID 72 MM OD 65 MM / 68 MM | 260300110 | 48 | 260300110 | 2026-03-05 | 2026-03-05 | 70 | 48 | 20 | 260400086 | 2026-04-04 | 30 | 2026-03-12 | Late |
| 260100619 | 2026-02-13 | SPAREPART | 5029.0488 | SELONGSONG SENJATA SILIKON KARBIDA P 800 MM ID 72 MM OD 65 MM | 260300110 | 40 | 260300110 | 2026-03-05 | 2026-03-05 | 70 | 40 | 20 | 260400086 | 2026-04-04 | 30 | 2026-03-12 | Late |
| 260100619 | 2026-02-13 | SPAREPART | 5029.049 | SELONGSONG SENJATA SILIKON KARBIDA P 550 MM ID 72 MM OD 40 MM LUBANG TAMBAHAN 20 MM | 260300110 | 23 | 260300110 | 2026-03-05 | 2026-03-05 | 60 | 23 | 20 | 260400086 | 2026-04-04 | 30 | 2026-03-12 | Late |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6030.0098 | PIPA GALVANIS 1/2 INCH | 260300096 | 156,306.31 | 260300096 | 2026-03-05 | 2026-03-05 | 1 | 156,306.31 | 15 | 260300313 | 2026-03-07 | 2 | 2026-03-12 | On time |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6060.0506 | PIPA CARBON STEEL BLACKSTEEL ASTM SCH.40 SEAMLESS Ø 1 INCH | 260510188 | 395,000 | 260300096 | 2026-03-05 | 2026-03-05 | 1 | 250,450.45 | 15 | 260300365 | 2026-03-09 | 4 | 2026-03-12 | On time |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6030.0868 | ELBOW LAS 2.5 INCH | 260300109 | 31,981.98 | 260300109 | 2026-03-05 | 2026-03-05 | 20 | 31,981.98 | 15 | 260300786 | 2026-03-17 | 12 | 2026-03-12 | Late |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6060.0501 | PIPA CARBON STEEL BLACKSTEEL Ø 2,5 INCH ASTM SCH.40 SEAMLESS | 260610123 | 1,030,000 | 260300096 | 2026-03-05 | 2026-03-05 | 15 | 807,207.21 | 15 | 260300365 | 2026-03-09 | 4 | 2026-03-12 | On time |
| 260100688 | 2026-02-18 | PERSEDIAAN UMUM | 6030.0167 | PIPA GALVANIS MEDIUM SNI 2 INCH | 260300096 | 629,729.73 | 260300096 | 2026-03-05 | 2026-03-05 | 4 | 629,729.73 | 15 | 260300312 | 2026-03-07 | 2 | 2026-03-12 | On time |
| 260100693 | 2026-02-18 | PERSEDIAAN UMUM | 6050.1106 | ROCKWOOL 3000X900X100 MM | 260300133 | 870,000 | 260300133 | 2026-03-05 | 2026-03-05 | 125 | 870,000 | 15 | 260400364 | 2026-04-10 | 36 | 2026-03-12 | Late |
| 260100708 | 2026-02-18 | BAHAN PEMBANTU | 2033.0001 | YELLOW INK | 260500268 | 81,500 | 260300107 | 2026-03-05 | 2026-03-10 | 40 | 80,000 | 15 | 260300398 | 2026-03-10 | 5 | 2026-03-17 | On time |
| 260100724 | 2026-02-19 | PERSEDIAAN UMUM | 6020.0144 | BATERAI ALKALINE 23 AE 12 V | 260300083 | 5,000 | 260300083 | 2026-03-05 | 2026-03-12 | 15 | 5,000 | 14 | 260300484 | 2026-03-11 | 6 | 2026-03-19 | On time |
| 260100725 | 2026-02-19 | PERSEDIAAN UMUM | 6020.0521 | SENTER LED RECHARGEABLE | 260300329 | 145,345 | 260300092 | 2026-03-05 | 2026-03-16 | 2 | 150,050 | 14 | 260300331 | 2026-03-09 | 4 | 2026-03-23 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2187 | KLEM PIPA STAINLESS 1/2 INCH | 260300111 | 20,990.99 | 260300111 | 2026-03-05 | 2026-03-05 | 50 | 20,990.99 | 13 | 260300474 | 2026-03-11 | 6 | 2026-03-12 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2312 | ELBOW LAS 3 INCH | 260300150 | 59,000 | 260300100 | 2026-03-05 | 2026-03-05 | 10 | 49,189.19 | 13 | 260300455 | 2026-03-11 | 6 | 2026-03-12 | On time |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.0373 | REDUCER 3X2 INCH | 260300111 | 47,567.57 | 260300111 | 2026-03-05 | 2026-03-05 | 2 | 47,567.57 | 13 | 260300453 | 2026-03-11 | 6 | 2026-03-12 | On time |
| 260100757 | 2026-02-20 | PERSEDIAAN UMUM | 6020.0221 | BATERAI MICRO CELL LR 1130 | 260300083 | 4,000 | 260300083 | 2026-03-05 | 2026-03-12 | 6 | 4,000 | 13 | 260300484 | 2026-03-11 | 6 | 2026-03-19 | On time |
| 260100821 | 2026-02-24 | PERSEDIAAN UMUM | 6060.0682 | CHECK VALVE 2.5 INCH KUNINGAN | 260300105 | 720,720.72 | 260300105 | 2026-03-05 | 2026-03-14 | 1 | 720,720.72 | 9 | 260300243 | 2026-03-06 | 1 | 2026-03-21 | On time |
| 260100821 | 2026-02-24 | PERSEDIAAN UMUM | 6060.0683 | CHECK VALVE 2 INCH KUNINGAN | 260300105 | 396,396.4 | 260300105 | 2026-03-05 | 2026-03-14 | 2 | 396,396.4 | 9 | 260300243 | 2026-03-06 | 1 | 2026-03-21 | On time |
| 260100831 | 2026-02-24 | FIXED ASSETS | AST02674 | POMPA EBARA 80X65 FSJA+ MOTOR 4KW | 260300075 | 17,250,000 | 260300075 | 2026-03-05 | 2026-03-05 | 2 | 17,250,000 | 9 | 260300591 | 2026-03-14 | 9 | 2026-03-12 | Late |
| 260100844 | 2026-02-25 | PERSEDIAAN UMUM | 6030.275 | SPAY TEBAL 15 MM | 260300114 | 100,000 | 260300113 | 2026-03-05 | 2026-03-05 | 2 | 85,000 | 8 | 260300571 | 2026-03-13 | 8 | 2026-03-12 | Late |
| 260100844 | 2026-02-25 | PERSEDIAAN UMUM | 6030.275 | SPAY TEBAL 15 MM | 260300114 | 100,000 | 260300114 | 2026-03-05 | 2026-03-05 | 2 | 100,000 | 8 | 260300574 | 2026-03-13 | 8 | 2026-03-12 | Late |
| 260100846 | 2026-02-25 | SPAREPART | 5030.18 | ORING TEBAL 02 MM OD 11 MM ID 09 MM | 260400276 | 1,500 | 260300084 | 2026-03-05 | 2026-03-12 | 20 | 1,500 | 8 | 260300744 | 2026-03-17 | 12 | 2026-03-19 | On time |
| 260100902 | 2026-02-26 | PERSEDIAAN UMUM | 6030.2255 | SEKRUP ISOLASI 8X3/8 MM | 260300112 | 95.23 | 260300112 | 2026-03-05 | 2026-03-05 | 10,000 | 95.225 | 7 | 260300472 | 2026-03-11 | 6 | 2026-03-12 | On time |
| 260100915 | 2026-02-28 | PERSEDIAAN UMUM | 6020.0796 | KLEM ACCU TEMBAGA | 260300095 | 40,540.54 | 260300095 | 2026-03-05 | 2026-03-14 | 8 | 40,540.54 | 5 | 260300276 | 2026-03-06 | 1 | 2026-03-21 | On time |
| 260100919 | 2026-02-28 | SPAREPART | 5032.0269 | PAKING TOMBO 1 MM | 260300118 | 245,000 | 260300118 | 2026-03-05 | 2026-03-14 | 2 | 245,000 | 5 | 260300429 | 2026-03-10 | 5 | 2026-03-21 | On time |
| 260100919 | 2026-02-28 | SPAREPART | 5032.0266 | PAKING TOMBO 0.5 MM | 260300118 | 200,000 | 260300118 | 2026-03-05 | 2026-03-14 | 2 | 200,000 | 5 | 260300429 | 2026-03-10 | 5 | 2026-03-21 | On time |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6010.0333 | SERAT FIBER | 260410033 | 5,000 | 260300117 | 2026-03-05 | 2026-03-14 | 50 | 2,500 | 5 | 260300311 | 2026-03-07 | 2 | 2026-03-21 | On time |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6030.0479 | AQUA PROOF | 260300199 | 58,750 | 260300117 | 2026-03-05 | 2026-03-14 | 10 | 65,000 | 5 | 260300311 | 2026-03-07 | 2 | 2026-03-21 | On time |
| 260100932 | 2026-02-28 | BAHAN BAKAR | 4060.0005 | TRIPTECH EXC 7841 HEAVY DUTTY GREASE | 260400049 | 191,823.9 | 260300099 | 2026-03-05 | 2026-03-05 | 15.9 | 191,823.9 | 5 | – | – | – | 2026-03-12 | Overdue |
| 260110004 | 2026-01-05 | PERSEDIAAN UMUM | 6030.2521 | LEVEL BLOCK 2T KONDOTEC | 260310038 | 2,520,000 | 260310037 | 2026-03-05 | 2026-03-05 | 2 | 2,520,000 | 59 | 260310265 | 2026-03-14 | 9 | 2026-03-12 | Late |
| 260110083 | 2026-02-05 | FIXED ASSETS | AST02643 | GA90VSD+P ML 400V 50 | 260310036 | 610,000,000 | 260310036 | 2026-03-05 | 2026-03-05 | 1 | 610,000,000 | 28 | – | – | – | 2026-03-12 | Overdue |
| 260110083 | 2026-02-05 | FIXED ASSETS | AST02644 | GA75+ P A 7.5 MEAK 400 50 | 260310036 | 420,000,000 | 260310036 | 2026-03-05 | 2026-03-05 | 3 | 420,000,000 | 28 | – | – | – | 2026-03-12 | Overdue |
| 260110083 | 2026-02-05 | FIXED ASSETS | AST02645 | FX335-230/1/50-ML | 260310036 | 80,000,000 | 260310036 | 2026-03-05 | 2026-03-05 | 5 | 80,000,000 | 28 | – | – | – | 2026-03-12 | Overdue |
| 260110083 | 2026-02-05 | FIXED ASSETS | AST02646 | DD300+ G 2 ½ | 260310036 | 20,250,000 | 260310036 | 2026-03-05 | 2026-03-05 | 5 | 20,250,000 | 28 | – | – | – | 2026-03-12 | Overdue |
| 260110083 | 2026-02-05 | FIXED ASSETS | AST02647 | PD300+ G 2 ½ | 260310036 | 20,250,000 | 260310036 | 2026-03-05 | 2026-03-05 | 5 | 20,250,000 | 28 | – | – | – | 2026-03-12 | Overdue |
| 260110083 | 2026-02-05 | FIXED ASSETS | AST02648 | Air Receiver Tank 6000 L | 260310036 | 94,770,000 | 260310036 | 2026-03-05 | 2026-03-05 | 1 | 94,770,000 | 28 | – | – | – | 2026-03-12 | Overdue |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.2655 | BESI POLOS 10 MM | 260310039 | 2,464,000 | 260310039 | 2026-03-05 | 2026-03-05 | 10 | 2,464,000 | 28 | 260410250 | 2026-04-15 | 41 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.0255 | SIKU 60X60X6000 MM | 260310039 | 336,000 | 260310039 | 2026-03-05 | 2026-03-05 | 10 | 336,000 | 28 | 260410086 | 2026-04-07 | 33 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.1777 | BESI UNP 100 12M | 260510069 | 1,284,000 | 260310039 | 2026-03-05 | 2026-03-05 | 100 | 1,168,000 | 28 | 260410085 | 2026-04-07 | 33 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.2543 | PLAT ALUMUNIUM 0,8 (@25M/ROLL) | 260510025 | 4,348,000 | 260310039 | 2026-03-05 | 2026-03-05 | 50 | 4,540,000 | 28 | 260510423 | 2026-05-16 | 72 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.2542 | PLAT BAJA (1,2MX2,4MX3MM) | 260410224 | 824,000 | 260310039 | 2026-03-05 | 2026-03-05 | 495 | 738,400 | 28 | 260410085 | 2026-04-07 | 33 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.2542 | PLAT BAJA (1,2MX2,4MX3MM) | 260410224 | 824,000 | 260310039 | 2026-03-05 | 2026-03-05 | 495 | 738,400 | 28 | 260410086 | 2026-04-07 | 33 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.2543 | PLAT ALUMUNIUM 0,8 (@25M/ROLL) | 260510025 | 4,348,000 | 260310039 | 2026-03-05 | 2026-03-05 | 50 | 4,540,000 | 28 | 260410307 | 2026-04-16 | 42 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.2543 | PLAT ALUMUNIUM 0,8 (@25M/ROLL) | 260510025 | 4,348,000 | 260310039 | 2026-03-05 | 2026-03-05 | 50 | 4,540,000 | 28 | 260310395 | 2026-03-31 | 26 | 2026-03-12 | Late |
| 260110084 | 2026-02-05 | PERSEDIAAN UMUM | 6030.2653 | PLAT BAJA (1,2MX2,4MX2MM) | 260310039 | 492,800 | 260310039 | 2026-03-05 | 2026-03-05 | 10 | 492,800 | 28 | 260410086 | 2026-04-07 | 33 | 2026-03-12 | Late |
| 260110113 | 2026-02-16 | PERSEDIAAN UMUM | 6030.2521 | LEVEL BLOCK 2T KONDOTEC | 260310038 | 2,520,000 | 260310038 | 2026-03-05 | 2026-03-05 | 2 | 2,520,000 | 17 | 260310267 | 2026-03-14 | 9 | 2026-03-12 | Late |
| 260110114 | 2026-02-16 | PERSEDIAAN UMUM | 6020.0788 | MOSFET SVDZ24NT IRFZ24N | 260310040 | 10,050 | 260310040 | 2026-03-05 | 2026-03-05 | 10 | 10,050 | 17 | 260310211 | 2026-03-12 | 7 | 2026-03-12 | On time |
| 260300001 | 2026-03-02 | STATIONERY | 6010.0182 | ODNER TWO HOLE,W/O SPRINT 29 X 35 X 7.5 CM | 260500026 | 33,000 | 260300083 | 2026-03-05 | 2026-03-12 | 22 | 33,000 | 3 | 260300484 | 2026-03-11 | 6 | 2026-03-19 | On time |
| 260300006 | 2026-03-02 | PERSEDIAAN UMUM | 6030.0655 | METERAN ROL | 260400420 | 171,171.17 | 260300106 | 2026-03-05 | 2026-03-16 | 1 | 171,171.17 | 3 | 260300242 | 2026-03-06 | 1 | 2026-03-23 | On time |
| 260300007 | 2026-03-02 | PERSEDIAAN UMUM | 6050.1382 | POMPA OLI MANUAL (BESI) | 260600231 | 350,000 | 260300093 | 2026-03-05 | 2026-03-16 | 2 | 415,000 | 3 | 260300433 | 2026-03-10 | 5 | 2026-03-23 | On time |
| 260300014 | 2026-03-03 | PERSEDIAAN UMUM | 6030.2539 | RESIBON POTONG 14X1/8X1 INCH | 260300102 | 54,009.01 | 260300102 | 2026-03-05 | 2026-03-05 | 30 | 54,009.01 | 2 | 260300471 | 2026-03-11 | 6 | 2026-03-12 | On time |
| 260300016 | 2026-03-03 | PERSEDIAAN UMUM | 6030.0487 | THINER A SPECIAL | 260400298 | 50,700 | 260300103 | 2026-03-05 | 2026-03-05 | 100 | 31,605 | 2 | 260300351 | 2026-03-09 | 4 | 2026-03-12 | On time |
| 260300016 | 2026-03-03 | PERSEDIAAN UMUM | 6030.0804 | AVIAN CLING SYNTHETIC 91 - KERAK ABU | 260300369 | 45,905.25 | 260300103 | 2026-03-05 | 2026-03-05 | 200 | 45,905.25 | 2 | 260300529 | 2026-03-12 | 7 | 2026-03-12 | On time |
| 260300016 | 2026-03-03 | PERSEDIAAN UMUM | 6030.0804 | AVIAN CLING SYNTHETIC 91 - KERAK ABU | 260300369 | 45,905.25 | 260300103 | 2026-03-05 | 2026-03-05 | 200 | 45,905.25 | 2 | 260300351 | 2026-03-09 | 4 | 2026-03-12 | On time |
| 260300016 | 2026-03-03 | PERSEDIAAN UMUM | 6030.0487 | THINER A SPECIAL | 260400298 | 50,700 | 260300103 | 2026-03-05 | 2026-03-05 | 100 | 31,605 | 2 | 260300529 | 2026-03-12 | 7 | 2026-03-12 | On time |
| 260300017 | 2026-03-03 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260300104 | 2026-03-05 | 2026-03-05 | 50 | 45,000 | 2 | 260300721 | 2026-03-17 | 12 | 2026-03-12 | Late |
| 260300017 | 2026-03-03 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260300104 | 2026-03-05 | 2026-03-05 | 50 | 45,000 | 2 | 260300940 | 2026-03-30 | 25 | 2026-03-12 | Late |
| 260300017 | 2026-03-03 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260300104 | 2026-03-05 | 2026-03-05 | 50 | 45,000 | 2 | 260300849 | 2026-03-26 | 21 | 2026-03-12 | Late |
| 260300017 | 2026-03-03 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260300104 | 2026-03-05 | 2026-03-05 | 50 | 45,000 | 2 | 260300848 | 2026-03-26 | 21 | 2026-03-12 | Late |
| 260300020 | 2026-03-03 | PERSEDIAAN UMUM | 6030.1846 | DR. SHIELD SHEET SINGLE WALL RF1050 WHITE LE=1050MM P=2,10 M | 260300097 | 179,200 | 260300097 | 2026-03-05 | 2026-03-05 | 15 | 179,200 | 2 | 260300334 | 2026-03-09 | 4 | 2026-03-12 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0234 | BOX JUPITER BK TS KW 1 50X50 | 260500474 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | 260300919 | 2026-03-28 | 23 | 2026-04-10 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0234 | BOX JUPITER BK TS KW 1 50X50 | 260500474 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | – | – | – | 2026-04-10 | Overdue |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0233 | BOX KOBIN BK TS KW 1 50X50 | 260600120 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | 260400071 | 2026-04-04 | 30 | 2026-04-10 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0233 | BOX KOBIN BK TS KW 1 50X50 | 260600120 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | – | – | – | 2026-04-10 | Overdue |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0234 | BOX JUPITER BK TS KW 1 50X50 | 260500474 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | 260300795 | 2026-03-18 | 13 | 2026-04-10 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0234 | BOX JUPITER BK TS KW 1 50X50 | 260500474 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | 260300987 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0233 | BOX KOBIN BK TS KW 1 50X50 | 260600120 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | 260300989 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0233 | BOX KOBIN BK TS KW 1 50X50 | 260600120 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | 260300987 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0025 | BOX KOBIN HITAM TS 50*50 KW III | 260600120 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 8,400 | 1,319 | 3 | 260300881 | 2026-03-27 | 22 | 2026-04-10 | On time |
| 260300028 | 2026-03-02 | BAHAN PACKING | 3011.0234 | BOX JUPITER BK TS KW 1 50X50 | 260500474 | 1,459 | 260300119 | 2026-03-05 | 2026-04-03 | 57,600 | 1,319 | 3 | – | – | – | 2026-04-10 | Overdue |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 96,600 | 1,118 | 3 | – | – | – | 2026-04-10 | Overdue |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 96,600 | 1,118 | 3 | 260300987 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 96,600 | 1,118 | 3 | 260300795 | 2026-03-18 | 13 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 96,600 | 1,118 | 3 | – | – | – | 2026-04-10 | Overdue |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0032 | BOX PARIS MERAH TS 40*40 KW I | 260500474 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 31,500 | 1,118 | 3 | 260300979 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0032 | BOX PARIS MERAH TS 40*40 KW I | 260500474 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 31,500 | 1,118 | 3 | 260300768 | 2026-03-17 | 12 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0032 | BOX PARIS MERAH TS 40*40 KW I | 260500474 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 31,500 | 1,118 | 3 | 260300963 | 2026-03-30 | 25 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 96,600 | 1,118 | 3 | 260300768 | 2026-03-17 | 12 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | 260300919 | 2026-03-28 | 23 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | 260300963 | 2026-03-30 | 25 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | 260400414 | 2026-04-13 | 39 | 2026-04-10 | Late |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | 260300981 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | 260401102 | 2026-04-29 | 55 | 2026-04-10 | Late |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | 260300881 | 2026-03-27 | 22 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | 260300979 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0026 | BOX KOBIN MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 115,500 | 1,118 | 3 | – | – | – | 2026-04-10 | Overdue |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 96,600 | 1,118 | 3 | 260300919 | 2026-03-28 | 23 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 27,300 | 1,118 | 3 | 260300881 | 2026-03-27 | 22 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0029 | BOX JUPITER MERAH TS 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 96,600 | 1,118 | 3 | 260300979 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300029 | 2026-03-02 | BAHAN PACKING | 3011.0027 | BOX KOBIN MERAH TS PHIL 40*40 KW I | 260600120 | 1,275 | 260300119 | 2026-03-05 | 2026-04-03 | 27,300 | 1,118 | 3 | 260300919 | 2026-03-28 | 23 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0189 | NFT00 50X50 REC PARIS MP2 KW-A 503X46 (WK150/150/150) | 260400104 | 532 | 260300119 | 2026-03-05 | 2026-04-03 | 50,400 | 490 | 3 | 260300693 | 2026-03-16 | 11 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0193 | NFT00 50X50 REC MY MP2 KW-A 503X46 (WK150/150/150) | 260400104 | 532 | 260300119 | 2026-03-05 | 2026-04-03 | 28,800 | 490 | 3 | 260300963 | 2026-03-30 | 25 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0188 | NFT00 50X50 REC PARIS MP1 KW-A 503X43 (WK150/150/150) | 260400104 | 617 | 260300119 | 2026-03-05 | 2026-04-03 | 50,400 | 569 | 3 | 260300693 | 2026-03-16 | 11 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0179 | NFT00 50X50 REC KOBIN MP1 KW-A 503X43 (WK150/150/150) | 260400104 | 617 | 260300119 | 2026-03-05 | 2026-04-03 | 43,200 | 569 | 3 | 260300981 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0179 | NFT00 50X50 REC KOBIN MP1 KW-A 503X43 (WK150/150/150) | 260400104 | 617 | 260300119 | 2026-03-05 | 2026-04-03 | 43,200 | 569 | 3 | 260300801 | 2026-03-18 | 13 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0192 | NFT00 50X50 REC MY MP1 KW-A 503X43 (WK150/150/150) | 260400104 | 617 | 260300119 | 2026-03-05 | 2026-04-03 | 28,800 | 569 | 3 | 260300963 | 2026-03-30 | 25 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0197 | NFT00 50X50 REC KAISAR MP2 KW-A 503X46 (WK150/150/150) | 260400104 | 532 | 260300119 | 2026-03-05 | 2026-04-03 | 28,800 | 490 | 3 | 260300981 | 2026-03-31 | 26 | 2026-04-10 | On time |
| 260300030 | 2026-03-02 | BAHAN PACKING | 3011.0187 | NFT00 50X50 REC JUPITER MP2 KW-B 503X46 (WK150/150/150) | 260400104 | 539 | 260300119 | 2026-03-05 | 2026-04-03 | 7,200 | 490 | 3 | 260300919 | 2026-03-28 | 23 | 2026-04-10 | On time |