Consolidated data
LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)
How the files are consolidated— click to expand
Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.
LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.
PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.
VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR Noⓘ | PR Dateⓘ | Item Groupⓘ | Item Codeⓘ | Itemⓘ | Last POⓘ | Last Priceⓘ | PO Noⓘ | PO Date ▲ⓘ | ETAⓘ | ETA (PO Report)ⓘ | Qtyⓘ | Priceⓘ | PR→POⓘ | GRPO Noⓘ | GRPO Dateⓘ | PO→GRPOⓘ | Deadlineⓘ | Realisasiⓘ | L/Iⓘ | Currencyⓘ | Vendorⓘ | Vendor Codeⓘ | Status PRⓘ | Status POⓘ | Required Dateⓘ | Request Byⓘ | UoMⓘ | Total POⓘ | Outstandingⓘ | TOPⓘ | Remarksⓘ |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260300363 | 2026-03-27 | PERSEDIAAN UMUM | 6050.0668 | NEPEL ANGIN 3/4 KE 12 | 260300427 | 54,054.05 | 260300427 | 2026-03-27 | 2026-03-27 | 2026-03-27 | 12 | 54,054.05 | – | 260300894 | 2026-03-27 | – | 2026-04-03 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-04-03 | Gita | PCS | 648,648.65 | 0 | Net 30 | MESIN PACKING PN 2B |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260400941 | 2026-04-25 | 29 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260500089 | 2026-05-05 | 39 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260400674 | 2026-04-20 | 24 | 2026-04-21 | On time | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260400621 | 2026-04-17 | 21 | 2026-04-21 | On time | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260401165 | 2026-04-30 | 34 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260400940 | 2026-04-25 | 29 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260400906 | 2026-04-24 | 28 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300366 | 2026-03-25 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300455 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 74,000 | 2 | 260401073 | 2026-04-29 | 33 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 74,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300452 | 2026-03-27 | 2026-04-11 | 2026-04-11 | 1,000 | 49,500 | 2 | 260400417 | 2026-04-13 | 17 | 2026-04-18 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 49,500,000 | 0 | Net 60 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300454 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400666 | 2026-04-20 | 24 | 2026-04-19 | Late | Lokal | IDR | SUCSES BERSAMA | S0937 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 30 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300454 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400461 | 2026-04-14 | 18 | 2026-04-19 | On time | Lokal | IDR | SUCSES BERSAMA | S0937 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 30 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300454 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400415 | 2026-04-13 | 17 | 2026-04-19 | On time | Lokal | IDR | SUCSES BERSAMA | S0937 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 30 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300454 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400398 | 2026-04-11 | 15 | 2026-04-19 | On time | Lokal | IDR | SUCSES BERSAMA | S0937 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 30 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300454 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400462 | 2026-04-14 | 18 | 2026-04-19 | On time | Lokal | IDR | SUCSES BERSAMA | S0937 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 30 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300453 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400459 | 2026-04-14 | 18 | 2026-04-19 | On time | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300453 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400508 | 2026-04-15 | 19 | 2026-04-19 | On time | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300453 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400170 | 2026-04-07 | 11 | 2026-04-19 | On time | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300453 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400464 | 2026-04-14 | 18 | 2026-04-19 | On time | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300453 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400743 | 2026-04-21 | 25 | 2026-04-19 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300453 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260400784 | 2026-04-22 | 26 | 2026-04-19 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300453 | 2026-03-27 | 2026-04-12 | 2026-04-12 | 1,000 | 47,000 | 2 | 260401104 | 2026-04-29 | 33 | 2026-04-19 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 47,000,000 | 0 | Net 14 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300452 | 2026-03-27 | 2026-04-11 | 2026-04-11 | 1,000 | 49,500 | 2 | 260400460 | 2026-04-14 | 18 | 2026-04-18 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 49,500,000 | 0 | Net 60 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300452 | 2026-03-27 | 2026-04-11 | 2026-04-11 | 1,000 | 49,500 | 2 | 260400948 | 2026-04-25 | 29 | 2026-04-18 | Late | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 49,500,000 | 0 | Net 60 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300452 | 2026-03-27 | 2026-04-11 | 2026-04-11 | 1,000 | 49,500 | 2 | 260400339 | 2026-04-10 | 14 | 2026-04-18 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 49,500,000 | 0 | Net 60 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300452 | 2026-03-27 | 2026-04-11 | 2026-04-11 | 1,000 | 49,500 | 2 | 260400851 | 2026-04-23 | 27 | 2026-04-18 | Late | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 49,500,000 | 0 | Net 60 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300452 | 2026-03-27 | 2026-04-11 | 2026-04-11 | 1,000 | 49,500 | 2 | 260400745 | 2026-04-21 | 25 | 2026-04-18 | Late | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 49,500,000 | 0 | Net 60 | – |
| 260300368 | 2026-03-25 | BAHAN PEMBANTU | 2045.0011 | PALLET LOKAL BARU 100*110 BALOK 4 | 260600296 | 47,000 | 260300452 | 2026-03-27 | 2026-04-11 | 2026-04-11 | 1,000 | 49,500 | 2 | 260400623 | 2026-04-17 | 21 | 2026-04-18 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | PCS | 49,500,000 | 0 | Net 60 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400537 | 2026-04-16 | 20 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400581 | 2026-04-17 | 21 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400368 | 2026-04-11 | 15 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400487 | 2026-04-15 | 19 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400446 | 2026-04-14 | 18 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400369 | 2026-04-11 | 15 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400445 | 2026-04-14 | 18 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400663 | 2026-04-20 | 24 | 2026-04-17 | Late | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400583 | 2026-04-17 | 21 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400662 | 2026-04-20 | 24 | 2026-04-17 | Late | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400406 | 2026-04-13 | 17 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400536 | 2026-04-16 | 20 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400535 | 2026-04-16 | 20 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400634 | 2026-04-17 | 21 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400486 | 2026-04-15 | 19 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400484 | 2026-04-15 | 19 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400582 | 2026-04-17 | 21 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400447 | 2026-04-14 | 18 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400633 | 2026-04-17 | 21 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400405 | 2026-04-13 | 17 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400404 | 2026-04-13 | 17 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300369 | 2026-03-25 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300437 | 2026-03-27 | 2026-04-10 | 2026-04-10 | 900,000 | 1,560 | 2 | 260400370 | 2026-04-11 | 15 | 2026-04-17 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 1,404,000,000 | 0 | Net 45 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260400776 | 2026-04-22 | 26 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260500085 | 2026-05-05 | 39 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260401064 | 2026-04-29 | 33 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260400849 | 2026-04-23 | 27 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260400935 | 2026-04-25 | 29 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260401002 | 2026-04-28 | 32 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260400899 | 2026-04-24 | 28 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300371 | 2026-03-25 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300439 | 2026-03-27 | 2026-04-06 | 2026-04-06 | 510,000 | 252 | 2 | 260500267 | 2026-05-09 | 43 | 2026-04-13 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | KG | 128,520,000 | 0 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300459 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 53,000 | 2 | 260400463 | 2026-04-14 | 18 | 2026-04-21 | On time | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 53,000,000 | 123 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300456 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 58,000 | 2 | 260401069 | 2026-04-29 | 33 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 58,000,000 | 0 | Net 14 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300456 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 58,000 | 2 | 260600114 | 2026-06-04 | 69 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 58,000,000 | 0 | Net 14 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300456 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 58,000 | 2 | 260500003 | 2026-05-02 | 36 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 58,000,000 | 0 | Net 14 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300456 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 58,000 | 2 | 260401160 | 2026-04-30 | 34 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 58,000,000 | 0 | Net 14 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300456 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 58,000 | 2 | 260600026 | 2026-06-02 | 67 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 58,000,000 | 0 | Net 14 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300456 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 58,000 | 2 | 260500999 | 2026-05-30 | 64 | 2026-04-21 | Late | Lokal | IDR | PRIMA PALET | S0521 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 58,000,000 | 0 | Net 14 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300457 | 2026-03-27 | 2026-04-13 | 2026-04-13 | 1,000 | 53,000 | 2 | 260400782 | 2026-04-22 | 26 | 2026-04-20 | Late | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 53,000,000 | 0 | Net 60 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300457 | 2026-03-27 | 2026-04-13 | 2026-04-13 | 1,000 | 53,000 | 2 | 260400338 | 2026-04-10 | 14 | 2026-04-20 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 53,000,000 | 0 | Net 60 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300457 | 2026-03-27 | 2026-04-13 | 2026-04-13 | 1,000 | 53,000 | 2 | 260400678 | 2026-04-20 | 24 | 2026-04-20 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 53,000,000 | 0 | Net 60 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300457 | 2026-03-27 | 2026-04-13 | 2026-04-13 | 1,000 | 53,000 | 2 | 260400340 | 2026-04-10 | 14 | 2026-04-20 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 53,000,000 | 0 | Net 60 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300457 | 2026-03-27 | 2026-04-13 | 2026-04-13 | 1,000 | 53,000 | 2 | 260400680 | 2026-04-20 | 24 | 2026-04-20 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 53,000,000 | 0 | Net 60 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300457 | 2026-03-27 | 2026-04-13 | 2026-04-13 | 1,000 | 53,000 | 2 | 260400624 | 2026-04-17 | 21 | 2026-04-20 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-04-02 | Qhadafy | – | 53,000,000 | 0 | Net 60 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300459 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 53,000 | 2 | 260400397 | 2026-04-11 | 15 | 2026-04-21 | On time | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 53,000,000 | 123 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300459 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 53,000 | 2 | 260400332 | 2026-04-10 | 14 | 2026-04-21 | On time | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 53,000,000 | 123 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300459 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 53,000 | 2 | 260400785 | 2026-04-22 | 26 | 2026-04-21 | Late | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 53,000,000 | 123 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300459 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 53,000 | 2 | 260400946 | 2026-04-25 | 29 | 2026-04-21 | Late | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 53,000,000 | 123 | Net 30 | – |
| 260300379 | 2026-03-25 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260300458 | 2026-03-27 | 2026-04-14 | 2026-04-14 | 1,000 | 53,000 | 2 | – | – | – | 2026-04-21 | Overdue | Lokal | IDR | SUCSES BERSAMA | S0937 | CLOSED | OPEN | 2026-04-02 | Qhadafy | – | 53,000,000 | 1,000 | Net 30 | – |
| 251200179 | 2025-12-10 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300474 | 2026-03-28 | 2026-04-13 | 2026-04-13 | 300 | 74,000 | 108 | 260400909 | 2026-04-24 | 27 | 2026-04-20 | Late | Lokal | IDR | ANUGERAH MULIA PUSTAKA. CV | S1123 | CLOSED | CLOSED | 2025-12-12 | Qhadafy | PCS | 22,200,000 | 0 | Net 30 | – |
| 251200179 | 2025-12-10 | BAHAN PEMBANTU | 2045.0006 | PALLET EXPORT 95*110*13 CM | 260600112 | 77,000 | 260300474 | 2026-03-28 | 2026-04-13 | 2026-04-13 | 300 | 74,000 | 108 | 260400971 | 2026-04-27 | 30 | 2026-04-20 | Late | Lokal | IDR | ANUGERAH MULIA PUSTAKA. CV | S1123 | CLOSED | CLOSED | 2025-12-12 | Qhadafy | PCS | 22,200,000 | 0 | Net 30 | – |
| 260100432 | 2026-01-29 | BAHAN BAKU GLAZE | 1070.0018 | INK - CIK AM 5456 YELLOW | 260400292 | 144,980 | 260300472 | 2026-03-28 | 2026-03-31 | 2026-03-31 | 228 | 147,368 | 58 | 260301021 | 2026-03-31 | 3 | 2026-04-07 | On time | Lokal | IDR | ESMALGLASS INDONESIA PT. | S0007 | OPEN | CLOSED | 2026-02-02 | Qhadafy | KG | 33,599,904 | 0 | Net 120 | – |
| 260100432 | 2026-01-29 | BAHAN BAKU GLAZE | 1070.0006 | INK - CIK NE 6153 BLACK | 260600246 | 259,276 | 260300472 | 2026-03-28 | 2026-03-31 | 2026-03-31 | 276 | 231,806 | 58 | 260301021 | 2026-03-31 | 3 | 2026-04-07 | On time | Lokal | IDR | ESMALGLASS INDONESIA PT. | S0007 | OPEN | CLOSED | 2026-02-02 | Qhadafy | KG | 63,978,456 | 0 | Net 120 | – |
| 260300169 | 2026-03-11 | PERSEDIAAN UMUM | 6030.2796 | FITTING LEGRIS 1 INCH KE 1/2 INCH | 260300467 | 74,324.32 | 260300467 | 2026-03-28 | 2026-03-28 | 2026-03-28 | 4 | 74,324.32 | 17 | – | – | – | 2026-04-04 | Overdue | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | OPEN | 2026-03-17 | Gita | PCS | 297,297.3 | 4 | Net 30 | DUST COLLECTOR PN 2C |
| 260300208 | 2026-03-12 | SPAREPART | 5011.0148 | BEARING 6307 2RS | 260300490 | 69,500 | 260300490 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 10 | 69,500 | 16 | 260300988 | 2026-03-31 | 3 | 2026-04-21 | On time | Lokal | IDR | CENTURY BEARINDO PT. (PPN) | S0043 | CLOSED | CLOSED | 2026-04-06 | Gita | PCS | 695,000 | 0 | Net 60 | STOK WHSP |
| 260300208 | 2026-03-12 | SPAREPART | 5011.0068 | BEARING 6004 2RS | 260500149 | 21,100 | 260300490 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 10 | 21,700 | 16 | 260300988 | 2026-03-31 | 3 | 2026-04-21 | On time | Lokal | IDR | CENTURY BEARINDO PT. (PPN) | S0043 | CLOSED | CLOSED | 2026-04-06 | Gita | PCS | 217,000 | 0 | Net 60 | STOK WHSP |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.2809 | MATA BOR NACHI 6.5 MM | 260300477 | 44,234.23 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 44,234.23 | 16 | 260400138 | 2026-04-06 | 9 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 44,234.23 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.2814 | MATA BOR NACHI 12.5 MM | 260300477 | 169,729.73 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 169,729.73 | 16 | 260400265 | 2026-04-09 | 12 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 169,729.73 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.2813 | MATA BOR NACHI 12 MM | 260300477 | 149,099.1 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 149,099.1 | 16 | 260400138 | 2026-04-06 | 9 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 149,099.1 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.2812 | MATA BOR NACHI 10.5 MM | 260300477 | 119,279.28 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 119,279.28 | 16 | 260400138 | 2026-04-06 | 9 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 119,279.28 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.281 | MATA BOR NACHI 9 MM | 260400455 | 79,189.19 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 79,189.19 | 16 | 260400138 | 2026-04-06 | 9 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 79,189.19 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.1963 | MATA BOR NACHI 7 MM | 260500182 | 46,950 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 49,099.1 | 16 | 260400138 | 2026-04-06 | 9 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 49,099.1 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.1961 | MATA BOR NACHI 5 MM | 260300477 | 29,594.6 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 29,594.6 | 16 | 260400138 | 2026-04-06 | 9 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 29,594.6 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300214 | 2026-03-12 | PERSEDIAAN UMUM | 6030.2811 | MATA BOR NACHI10 MM | 260300477 | 101,441.44 | 260300477 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 1 | 101,441.44 | 16 | 260400138 | 2026-04-06 | 9 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-23 | Gita | PCS | 101,441.44 | 0 | Net 30 | MATA BOR BUBUT / BENGKEL |
| 260300232 | 2026-03-13 | SPAREPART | 5031.002 | BALLVALVE 4 INCH | 260300493 | 4,200,000 | 260300493 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 2 | 4,200,000 | 15 | 260400142 | 2026-04-07 | 10 | 2026-04-21 | On time | Lokal | IDR | CENTRAL NUSA JAYA .PT | S0825 | CLOSED | CLOSED | 2026-03-30 | Gita | PCS | 8,400,000 | 0 | Net 30 | SPARE PENGETAPAN BALLMILL. ONDA KUNINGAN |
| 260300232 | 2026-03-13 | SPAREPART | 5031.0017 | BALLVALVE 3 INCH ONDA | 260500482 | 2,106,000 | 260300493 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 2 | 1,950,000 | 15 | 260400142 | 2026-04-07 | 10 | 2026-04-21 | On time | Lokal | IDR | CENTRAL NUSA JAYA .PT | S0825 | CLOSED | CLOSED | 2026-03-30 | Gita | PCS | 3,900,000 | 0 | Net 30 | SPARE PERGANTIAN POMPA SLURY. ONDA KUNINGAN |
| 260300232 | 2026-03-13 | SPAREPART | 5031.0018 | BALLVALVE 3/4 INCH KITZ | 260300492 | 155,000 | 260300492 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 15 | 155,000 | 15 | 260400025 | 2026-04-01 | 4 | 2026-04-21 | On time | Lokal | IDR | DASAN PUTRA PERKASA CV. | S0077 | CLOSED | CLOSED | 2026-03-30 | Gita | PCS | 2,325,000 | 0 | Net 30 | STANG SPRAY DRYER ATM 7.000 & 10.000. ONDA KUNINGAN |
| 260300276 | 2026-03-17 | SPAREPART | 5029.0057 | CERAMIC FIBRA BOARD 25X1000X1200 MM TEMP 1400 C DENSITY 164 "MORGAN" | 260300470 | 1,150,000 | 260300470 | 2026-03-28 | 2026-04-10 | 2026-04-10 | 10 | 1,150,000 | 11 | 260400175 | 2026-04-07 | 10 | 2026-04-17 | On time | Lokal | IDR | CRISTAL ALAM SEJAHTERA CV. | S0138 | CLOSED | CLOSED | 2026-03-25 | Gita | PCS | 11,500,000 | 0 | Net 60 | KILN 1A & 1B. TEMP 1360 DERAJAT. BUKAN MORGAN |
| 260300304 | 2026-03-23 | PERSEDIAAN UMUM | 6050.0045 | MAJUN WARNA | 260500441 | 8,200 | 260300489 | 2026-03-28 | 2026-04-10 | 2026-04-10 | 268 | 7,200 | 5 | 260400521 | 2026-04-15 | 18 | 2026-04-17 | On time | Lokal | IDR | DWI TUNGGAL UD. | S0172 | CLOSED | CLOSED | 2026-04-01 | Gita | KG | 1,929,600 | 0 | Net 60 | PN1= 100, PN2=100, BM=8, MTN = 15 (MEKANIK ) + 25 ( ALAT BERAT), WHSP=15, QMS=5 |
| 260300325 | 2026-03-26 | PERSEDIAAN UMUM | 6020.0668 | KABEL NYAF 1X10 MM | 260400202 | 30,801.8 | 260300473 | 2026-03-28 | 2026-03-28 | 2026-03-28 | 2,000 | 31,171.17 | 2 | 260400212 | 2026-04-08 | 11 | 2026-04-04 | Late | Lokal | IDR | SINAR SURABAYA SAKTI | S0655 | CLOSED | CLOSED | 2026-04-01 | Gita | MTR | 62,342,342 | 0 | Net 45 | HD PN 1A & HD PN 2B |
| 260300325 | 2026-03-26 | PERSEDIAAN UMUM | 6020.0668 | KABEL NYAF 1X10 MM | 260400202 | 30,801.8 | 260300473 | 2026-03-28 | 2026-03-28 | 2026-03-28 | 2,000 | 31,171.17 | 2 | 260301000 | 2026-03-31 | 3 | 2026-04-04 | On time | Lokal | IDR | SINAR SURABAYA SAKTI | S0655 | CLOSED | CLOSED | 2026-04-01 | Gita | MTR | 62,342,342 | 0 | Net 45 | HD PN 1A & HD PN 2B |
| 260300344 | 2026-03-26 | PERSEDIAAN UMUM | 6020.0137 | KLEM SLANG 1 1/4 INCH | 260500490 | 3,963.96 | 260300491 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 20 | 3,783.78 | 2 | 260400031 | 2026-04-01 | 4 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-04-01 | Gita | PCS | 75,675.68 | 0 | Net 30 | STOK GUDANG SPAREPART |
| 260300344 | 2026-03-26 | PERSEDIAAN UMUM | 6020.0076 | KLEM SLANG 3/4 INCH | 260500490 | 2,342.34 | 260300491 | 2026-03-28 | 2026-04-14 | 2026-04-14 | 20 | 2,252.25 | 2 | 260400031 | 2026-04-01 | 4 | 2026-04-21 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-04-01 | Gita | PCS | 45,045.04 | 0 | Net 30 | STOK GUDANG SPAREPART |