Consolidated data
LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)
How the files are consolidated— click to expand
Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.
LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.
PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.
VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR Noⓘ | PR Dateⓘ | Item Groupⓘ | Item Codeⓘ | Itemⓘ | Last POⓘ | Last Priceⓘ | PO Noⓘ | PO Date ▲ⓘ | ETAⓘ | ETA (PO Report)ⓘ | Qtyⓘ | Priceⓘ | PR→POⓘ | GRPO Noⓘ | GRPO Dateⓘ | PO→GRPOⓘ | Deadlineⓘ | Realisasiⓘ | L/Iⓘ | Currencyⓘ | Vendorⓘ | Vendor Codeⓘ | Status PRⓘ | Status POⓘ | Required Dateⓘ | Request Byⓘ | UoMⓘ | Total POⓘ | Outstandingⓘ | TOPⓘ | Remarksⓘ |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260100222 | 2026-01-19 | PERSEDIAAN UMUM | 6030.2574 | MATA BOR BETON M20 | 260100308 | 160,000 | 260100308 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 2 | 160,000 | 1 | 260100639 | 2026-01-20 | – | 2026-01-27 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-01-24 | Nanda Ayu Pratiwi | PCS | 320,000 | 0 | Net 60 | UNTUK OPERASIONAL PROYEK |
| 260110033 | 2026-01-17 | PERSEDIAAN UMUM | 6050.0942 | MASKER KAIN | 260510279 | 2,500 | 260110112 | 2026-01-20 | 2026-01-29 | 2026-01-29 | 1,500 | 2,500 | 3 | 260110846 | 2026-02-11 | 22 | 2026-02-05 | Late | Lokal | IDR | DUTA TEKNIK. CV | S0797 | CLOSED | CLOSED | 2026-01-24 | Tika Lisnawati | PCS | 3,750,000 | 0 | Net 45 | REFF : 008/MRS/PROD-PK02/I/2026 KEBUTUHAN ALL AREA PK02, ATAS PERMINTAAN LINDA, RE-ORDER NO PO # 251210049 |
| 260110033 | 2026-01-17 | PERSEDIAAN UMUM | 6050.0059 | SARUNG TANGAN | 260600168 | 17,600 | 260110112 | 2026-01-20 | 2026-01-29 | 2026-01-29 | 200 | 22,500 | 3 | 260110759 | 2026-02-09 | 20 | 2026-02-05 | Late | Lokal | IDR | DUTA TEKNIK. CV | S0797 | CLOSED | CLOSED | 2026-01-24 | Tika Lisnawati | PACK | 4,500,000 | 0 | Net 45 | REFF : 008/MRS/PROD-PK02/I/2026 KEBUTUHAN ALL AREA PK02, ATAS PERMINTAAN LINDA, RE-ORDER NO PO # 260110072 |
| 260110034 | 2026-01-17 | BAHAN BAKU BODY | 1098.0017 | SODIUM POLYACRYLATE 230# | 260110113 | 0.93 | 260110113 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 4,000 | 0.93 | 3 | 260310411 | 2026-03-31 | 70 | 2026-01-27 | Late | Impor | USD | FOSHAN HUIXIN NEW MATERIALS CO., LTD | S0779 | CLOSED | CLOSED | 2026-02-14 | Aulia Safitri | Kg | 62,998,200 | 0 | - Cash Basic - | MOQ PR 260110007 |
| 251100422 | 2025-11-28 | PERSEDIAAN UMUM | 6020.066 | KABEL NYYHY 4X50 MM | 260100330 | 668,207.21 | 260100330 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 30 | 668,207.21 | 54 | 260101018 | 2026-01-29 | 8 | 2026-01-28 | Late | Lokal | IDR | PT. EKASAPTA HIDUP MAJU | S0705 | CLOSED | CLOSED | 2025-12-04 | Nanda Ayu Pratiwi | MTR | 20,046,216.3 | 0 | Net 45 | UNTUK KILN PN 2C |
| 251100455 | 2025-11-29 | PERSEDIAAN UMUM | 6020.0662 | KABEL NYYHY 5X1.5 MM | 260100330 | 30,018.02 | 260100330 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 200 | 30,018.02 | 53 | 260101018 | 2026-01-29 | 8 | 2026-01-28 | Late | Lokal | IDR | PT. EKASAPTA HIDUP MAJU | S0705 | CLOSED | CLOSED | 2025-12-03 | Nanda Ayu Pratiwi | MTR | 6,003,604 | 0 | Net 45 | KOMPENSATOR |
| 251200056 | 2025-12-03 | STATIONERY | 6010.0169 | PLONG KERTAS KECIL(PERVORATOR) () PITCH 8 CM, 6 X 10.5X 5 CM | 260100336 | 30,000 | 260100336 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 1 | 30,000 | 49 | 260100727 | 2026-01-22 | 1 | 2026-01-28 | On time | Lokal | IDR | PELANGI STATIONERY MOJOSARI | S0191 | CLOSED | CLOSED | 2025-12-08 | Nanda Ayu Pratiwi | PCS | 30,000 | 0 | Net 1 | KANTOR PROYEK |
| 251200110 | 2025-12-06 | PERSEDIAAN UMUM | 6020.0084 | KABEL NYM 2X1.5 MM | 260100330 | 1,241,261.26 | 260100330 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 1 | 1,241,261.26 | 46 | 260101018 | 2026-01-29 | 8 | 2026-01-28 | Late | Lokal | IDR | PT. EKASAPTA HIDUP MAJU | S0705 | CLOSED | CLOSED | 2025-12-11 | Nanda Ayu Pratiwi | ROLL | 1,241,261.26 | 0 | Net 45 | (100 MTR) UNTUK KABEL PARKIRAN MOBIL |
| 251200149 | 2025-12-09 | STATIONERY | 6010.0148 | CUTTER BESAR L-500 | 260610151 | 7,767 | 260100336 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 1 | 16,000 | 43 | 260100727 | 2026-01-22 | 1 | 2026-01-28 | On time | Lokal | IDR | PELANGI STATIONERY MOJOSARI | S0191 | OPEN | CLOSED | 2025-12-15 | Nanda Ayu Pratiwi | PCS | 16,000 | 0 | Net 1 | PROJECT MONITORING KUALITAS & HASIL PRODUKSI PN 1A |
| 251200250 | 2025-12-15 | SPAREPART | 5017.034 | MOTOR PROTECTION SCHNEIDER TYPE GV2ME10 | 260500288 | 545,000 | 260100364 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 25 | 464,000 | 37 | 260100868 | 2026-01-26 | 5 | 2026-01-28 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2025-12-18 | Nanda Ayu Pratiwi | PCS | 11,600,000 | 0 | Net 30 | UNTUK PANEL AYAKAN |
| 251200394 | 2025-12-23 | STATIONERY | 6010.0714 | KERTAS A3 | 260600145 | 77,000 | 260100336 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 2 | 82,500 | 29 | 260100727 | 2026-01-22 | 1 | 2026-01-28 | On time | Lokal | IDR | PELANGI STATIONERY MOJOSARI | S0191 | CLOSED | CLOSED | 2025-12-29 | Nanda Ayu Pratiwi | RIM | 165,000 | 0 | Net 1 | KEBUTUHAN PROYEK |
| 251200428 | 2025-12-26 | PERSEDIAAN UMUM | 6030.2589 | PLAT STRIP 50X4 MM X 6000 | 260100332 | 93,243.24 | 260100332 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 25 | 93,243.24 | 26 | 260101032 | 2026-01-29 | 8 | 2026-01-28 | Late | Lokal | IDR | BENTENG ANUGERAH SEJAHTERA PT. | S0203 | CLOSED | CLOSED | 2025-12-31 | Nanda Ayu Pratiwi | BTG | 2,331,081 | 0 | Net 30 | UNTUK TALANG BMSD |
| 251210039 | 2025-12-13 | PERSEDIAAN UMUM | 6030.249 | KARET STRIP U UKURAN 7MM X 14MM | 260110134 | 10,000 | 260110134 | 2026-01-21 | 2026-01-30 | 2026-01-30 | 100 | 10,000 | 39 | 260110784 | 2026-02-09 | 19 | 2026-02-06 | Late | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | CLOSED | CLOSED | 2025-12-20 | Tika Lisnawati | METER | 1,000,000 | 0 | COD | REFF : 312/MRS/ENG/XII/2025 KEBUTUHAN ENGINEERING PERMINTAAN BPK. ANDI SUSANTO |
| 260100063 | 2026-01-07 | PERSEDIAAN UMUM | 6030.0843 | WIREMESH M8-150 (2100X5400) | 260300278 | 567,567.57 | 260100331 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 13 | 580,000 | 14 | 260101033 | 2026-01-29 | 8 | 2026-01-28 | Late | Lokal | IDR | RANGKA RAYA PT. | S0450 | CLOSED | CLOSED | 2026-01-12 | Nanda Ayu Pratiwi | LBR | 7,540,000 | 0 | Net 14 | UNTUK COR LANTAI DUST COLLECTOR PN1 |
| 260100110 | 2026-01-09 | SPAREPART | 5032.0776 | PACKING ASBETTOS TOMBO 1303/2 MM (HITAM) | 260100338 | 575,000 | 260100338 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 10 | 575,000 | 12 | 260100900 | 2026-01-27 | 6 | 2026-01-28 | On time | Lokal | IDR | KARYA MITRA TEHNIK PT. | S0044 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | MTR | 5,750,000 | 0 | Net 60 | UNTUK PIPA OLI RADIATOR PRESS |
| 260100110 | 2026-01-09 | SPAREPART | 5032.0776 | PACKING ASBETTOS TOMBO 1303/2 MM (HITAM) | 260100338 | 575,000 | 260100338 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 10 | 575,000 | 12 | 260100845 | 2026-01-24 | 3 | 2026-01-28 | On time | Lokal | IDR | KARYA MITRA TEHNIK PT. | S0044 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | MTR | 5,750,000 | 0 | Net 60 | UNTUK PIPA OLI RADIATOR PRESS |
| 260100125 | 2026-01-10 | PERSEDIAAN UMUM | 6060.0653 | MATA BOR NACHI 27 MM | 260100339 | 1,564,000 | 260100339 | 2026-01-21 | 2026-02-10 | 2026-02-10 | 1 | 1,564,000 | 11 | 260100771 | 2026-01-22 | 1 | 2026-02-17 | On time | Lokal | IDR | YUNIKA TRIJAYA SENTOSA, PT | S0649 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PCS | 1,564,000 | 0 | Net 30 | ALAT KERJA BENGKEL BUBUT |
| 260100125 | 2026-01-10 | PERSEDIAAN UMUM | 6050.131 | SKETMAT MANUAL 300 MM MITOTOYO | 260100339 | 1,550,000 | 260100339 | 2026-01-21 | 2026-02-10 | 2026-02-10 | 1 | 1,550,000 | 11 | 260100771 | 2026-01-22 | 1 | 2026-02-17 | On time | Lokal | IDR | YUNIKA TRIJAYA SENTOSA, PT | S0649 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PCS | 1,550,000 | 0 | Net 30 | ALAT KERJA BENGKEL BUBUT |
| 260100160 | 2026-01-13 | SPAREPART | 5017.1069 | CONTACTOR SCHNEIDER LC1D09BNE 24...60 AC/DC COIL | 260100357 | 665,000 | 260100357 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 1 | 665,000 | 8 | 260100800 | 2026-01-23 | 2 | 2026-02-07 | On time | Lokal | IDR | SAMUDERA TEKNIK ABADI | S0383 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 665,000 | 0 | Net 30 | – |
| 260100167 | 2026-01-14 | PERSEDIAAN UMUM | 6060.0654 | BAUT M20 DRAT DUA ARAH (DRAT HALUS) | 260100351 | 165,000 | 260100351 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 20 | 165,000 | 7 | 260100794 | 2026-01-23 | 2 | 2026-02-07 | On time | Lokal | IDR | TONO SERVICE | S0515 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 3,300,000 | 0 | Net 30 | UNTUK PASANG BAN LOADER XG 955H. GENUINE |
| 260100167 | 2026-01-14 | PERSEDIAAN UMUM | 6060.0655 | MUR M20 (DRAT HALUS) LOADER XG955H | 260100351 | 30,000 | 260100351 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 20 | 30,000 | 7 | 260100794 | 2026-01-23 | 2 | 2026-02-07 | On time | Lokal | IDR | TONO SERVICE | S0515 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 600,000 | 0 | Net 30 | UNTUK PASANG BAN LOADER XG 955H. GENUINE |
| 260100167 | 2026-01-14 | PERSEDIAAN UMUM | 6060.0656 | MUR M20 (DRAT HALUS) PELG RODA LOADER XG 955H | 260100351 | 40,000 | 260100351 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 20 | 40,000 | 7 | 260100794 | 2026-01-23 | 2 | 2026-02-07 | On time | Lokal | IDR | TONO SERVICE | S0515 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 800,000 | 0 | Net 30 | UNTUK PASANG BAN LOADER XG 955H. GENUINE |
| 260100167 | 2026-01-14 | PERSEDIAAN UMUM | 6060.0657 | PLAT BAJA M20 | 260100351 | 15,000 | 260100351 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 20 | 15,000 | 7 | 260100794 | 2026-01-23 | 2 | 2026-02-07 | On time | Lokal | IDR | TONO SERVICE | S0515 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 300,000 | 0 | Net 30 | UNTUK PASANG BAN LOADER XG 955H. GENUINE |
| 260100173 | 2026-01-14 | PERSEDIAAN UMUM | 6050.077 | REGULATOR GAS ACETYLENE YAMATO | 260500003 | 175,000 | 260100335 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 3 | 160,000 | 7 | 260100842 | 2026-01-24 | 3 | 2026-01-28 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | PCS | 480,000 | 0 | Net 60 | UNTUK OPERASIONAL PROYEK |
| 260100173 | 2026-01-14 | PERSEDIAAN UMUM | 6030.0912 | KABEL LAS | 260100335 | 73,000 | 260100335 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 100 | 73,000 | 7 | 260100842 | 2026-01-24 | 3 | 2026-01-28 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | MTR | 7,300,000 | 0 | Net 60 | UNTUK OPERASIONAL PROYEK |
| 260100173 | 2026-01-14 | PERSEDIAAN UMUM | 6050.1302 | TANG POTONG | 260300041 | 45,675.68 | 260100334 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 3 | 36,036.01 | 7 | 260100774 | 2026-01-22 | 1 | 2026-01-28 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | PCS | 108,108.03 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100173 | 2026-01-14 | PERSEDIAAN UMUM | 6050.13 | TANG KOMBINASI | 260610207 | 43,780 | 260100334 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 3 | 49,549.55 | 7 | 260100774 | 2026-01-22 | 1 | 2026-01-28 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | PCS | 148,648.65 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100173 | 2026-01-14 | PERSEDIAAN UMUM | 6050.1301 | TANG CUCUT | 260500389 | 53,250 | 260100334 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 3 | 36,036.04 | 7 | 260100774 | 2026-01-22 | 1 | 2026-01-28 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | PCS | 108,108.12 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100173 | 2026-01-14 | PERSEDIAAN UMUM | 6050.0042 | KUAS ROLL KECIL | 260500300 | 14,881.08 | 260100335 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 10 | 20,000 | 7 | 260100842 | 2026-01-24 | 3 | 2026-01-28 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | PCS | 200,000 | 0 | Net 60 | UNTUK OPERASIONAL PROYEK |
| 260100174 | 2026-01-14 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260100337 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 50 | 90,000 | 7 | 260100728 | 2026-01-22 | 1 | 2026-01-28 | On time | Lokal | IDR | ABADI OXYGEN | S0178 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | TBG | 4,500,000 | 0 | - Cash Basic - | UNTUK OPERASIONAL PROYEK |
| 260100174 | 2026-01-14 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260100337 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 50 | 90,000 | 7 | 260101235 | 2026-02-05 | 15 | 2026-01-28 | Late | Lokal | IDR | ABADI OXYGEN | S0178 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | TBG | 4,500,000 | 0 | - Cash Basic - | UNTUK OPERASIONAL PROYEK |
| 260100174 | 2026-01-14 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260100337 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 50 | 90,000 | 7 | 260101855 | 2026-02-21 | 31 | 2026-01-28 | Late | Lokal | IDR | ABADI OXYGEN | S0178 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | TBG | 4,500,000 | 0 | - Cash Basic - | UNTUK OPERASIONAL PROYEK |
| 260100174 | 2026-01-14 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260100337 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 50 | 90,000 | 7 | 260101081 | 2026-01-30 | 9 | 2026-01-28 | Late | Lokal | IDR | ABADI OXYGEN | S0178 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | TBG | 4,500,000 | 0 | - Cash Basic - | UNTUK OPERASIONAL PROYEK |
| 260100174 | 2026-01-14 | PERSEDIAAN UMUM | 6050.0111 | OXYGEN | 260600177 | 45,000 | 260100337 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 50 | 90,000 | 7 | 260100859 | 2026-01-26 | 5 | 2026-01-28 | On time | Lokal | IDR | ABADI OXYGEN | S0178 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | TBG | 4,500,000 | 0 | - Cash Basic - | UNTUK OPERASIONAL PROYEK |
| 260100188 | 2026-01-15 | PERSEDIAAN UMUM | 6030.1203 | TANG SKUN | 260100329 | 105,000 | 260100329 | 2026-01-21 | 2026-01-21 | 2026-01-21 | 3 | 105,000 | 6 | 260100846 | 2026-01-26 | 5 | 2026-01-28 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 315,000 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100192 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0568 | ACCU KERING 105 D 31 R/L | 260500333 | 2,350,000 | 260100352 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 2 | 2,350,000 | 6 | 260100793 | 2026-01-23 | 2 | 2026-02-07 | On time | Lokal | IDR | TOYO MATSU PT. | S0036 | CLOSED | CLOSED | 2026-01-21 | Nanda Ayu Pratiwi | PCS | 4,700,000 | 0 | Net 30 | GS. SPARE FORKLIFT HELI DAN TAILIFT |
| 260100194 | 2026-01-15 | PERSEDIAAN UMUM | 6030.0804 | AVIAN CLING SYNTHETIC 91 - KERAK ABU | 260300369 | 45,905.25 | 260100349 | 2026-01-21 | 2026-02-10 | 2026-02-10 | 50 | 45,905.41 | 6 | 260101706 | 2026-02-18 | 28 | 2026-02-17 | Late | Lokal | IDR | TIRTAKENCANA TATAWARNA PT. | S0404 | CLOSED | CLOSED | 2026-01-23 | Nanda Ayu Pratiwi | KG | 2,295,270.25 | 0 | Net 30 | PRODUKSI PN2. KEMASAN @ 1 KG |
| 260100195 | 2026-01-15 | STATIONERY | 6010.0458 | BALLPOIN @12 PCS | 260100346 | 15,600 | 260100346 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 1 | 15,600 | 6 | 260100999 | 2026-01-29 | 8 | 2026-02-07 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-02 | Nanda Ayu Pratiwi | PACK | 15,600 | 0 | Net 30 | UNTUK TIMBANGAN ATAS & BAWAH. 1 pack = 12 pcs |
| 260100195 | 2026-01-15 | STATIONERY | 6010.0307 | PITA PRINTER LX 310 | 260610060 | 16,800 | 260100346 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 6 | 46,700 | 6 | 260100999 | 2026-01-29 | 8 | 2026-02-07 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-02 | Nanda Ayu Pratiwi | PCS | 280,200 | 0 | Net 30 | UNTUK TIMBANGAN ATAS & BAWAH |
| 260100195 | 2026-01-15 | PERSEDIAAN UMUM | 6050.1013 | KARET GELANG PENTIL | 260100587 | 13,000 | 260100346 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 1 | 37,000 | 6 | 260100999 | 2026-01-29 | 8 | 2026-02-07 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-02 | Nanda Ayu Pratiwi | PACK | 37,000 | 0 | Net 30 | UNTUK TIMBANGAN ATAS & BAWAH |
| 260100195 | 2026-01-15 | STATIONERY | 6010.0151 | ISI STAPLES KECIL #10 KECIL, NO.10-1M | 260610151 | 1,592 | 260100346 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 10 | 2,700 | 6 | 260100999 | 2026-01-29 | 8 | 2026-02-07 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-02 | Nanda Ayu Pratiwi | PACK | 27,000 | 0 | Net 30 | UNTUK TIMBANGAN ATAS & BAWAH |
| 260100195 | 2026-01-15 | STATIONERY | 6010.0241 | ISI BOLPOIN HITAM | 260600027 | 700 | 260100346 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 24 | 700 | 6 | 260100999 | 2026-01-29 | 8 | 2026-02-07 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-02 | Nanda Ayu Pratiwi | PCS | 16,800 | 0 | Net 30 | UNTUK TIMBANGAN ATAS & BAWAH |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.1299 | PENDORONG AIR | 260400316 | 40,000 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 1 | 40,000 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PCS | 40,000 | 0 | Net 14 | STOK KEBERSIHAN |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0038 | SAPU LANTAI | 260500421 | 17,000 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 2 | 16,000 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PCS | 32,000 | 0 | Net 14 | STOK KEBERSIHAN |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0062 | KANEBO | 260610080 | 12,000 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 2 | 20,000 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PCS | 40,000 | 0 | Net 14 | STOK KEBERSIHAN |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.1298 | KIT PEMBERSIH MOTOR | 260400316 | 20,000 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 2 | 20,000 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | BTL | 40,000 | 0 | Net 14 | STOK KEBERSIHAN |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0017 | KAPUR BARUS TOILET | 260500421 | 28,000 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 1 | 27,000 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PACK | 27,000 | 0 | Net 14 | STOK KEBERSIHAN |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.1225 | SABUN COLEK | 260100345 | 5,500 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 1 | 5,500 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PCS | 5,500 | 0 | Net 14 | STOK KEBERSIHAN |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0151 | KANTONG KRESEK JUMBO | 260500421 | 40,000 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 3 | 38,000 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PACK | 114,000 | 0 | Net 14 | STOK KEBERSIHAN |
| 260100196 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0015 | PEMBERSIH LANTAI | 260500421 | 16,000 | 260100345 | 2026-01-21 | 2026-01-31 | 2026-01-31 | 1 | 16,000 | 6 | 260101092 | 2026-01-30 | 9 | 2026-02-07 | On time | Lokal | IDR | PANORAMA | S0184 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | PCS | 16,000 | 0 | Net 14 | STOK KEBERSIHAN |