Consolidated data
LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)
How the files are consolidated— click to expand
Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.
LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.
PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.
VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR Noⓘ | PR Dateⓘ | Item Groupⓘ | Item Codeⓘ | Itemⓘ | Last POⓘ | Last Priceⓘ | PO Noⓘ | PO Date ▲ⓘ | ETAⓘ | ETA (PO Report)ⓘ | Qtyⓘ | Priceⓘ | PR→POⓘ | GRPO Noⓘ | GRPO Dateⓘ | PO→GRPOⓘ | Deadlineⓘ | Realisasiⓘ | L/Iⓘ | Currencyⓘ | Vendorⓘ | Vendor Codeⓘ | Status PRⓘ | Status POⓘ | Required Dateⓘ | Request Byⓘ | UoMⓘ | Total POⓘ | Outstandingⓘ | TOPⓘ | Remarksⓘ |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260100149 | 2026-01-12 | PERSEDIAAN UMUM | 6030.2567 | DR SHIELD SHEET SINGLE WALL RF1050 LE=1050MM P=5 M | 260300242 | 426,666.67 | 260100303 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 50 | 426,666.68 | 7 | 260100909 | 2026-01-27 | 8 | 2026-01-26 | Late | Lokal | IDR | RAGAM TANGGUH FORTINDO PT. | S0255 | CLOSED | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | LBR | 21,333,333.8 | 0 | Net 60 | UNTUK DINDING GUDANG 93 |
| 260100149 | 2026-01-12 | PERSEDIAAN UMUM | 6030.2568 | DR SHIELD SHEET SINGLE WALL RF1050 LE=1050MM P=7 M | 260100303 | 597,333.33 | 260100303 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 40 | 597,333.33 | 7 | 260100909 | 2026-01-27 | 8 | 2026-01-26 | Late | Lokal | IDR | RAGAM TANGGUH FORTINDO PT. | S0255 | CLOSED | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | LBR | 23,893,333.2 | 0 | Net 60 | UNTUK DINDING GUDANG 93 |
| 260100149 | 2026-01-12 | PERSEDIAAN UMUM | 6030.257 | DR SONNE ST 375 MILKY CLEAR L= 375 MM P= 1,7 M | 260100303 | 100,039.63 | 260100303 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 11 | 100,039.63 | 7 | 260101760 | 2026-02-19 | 31 | 2026-01-26 | Late | Lokal | IDR | RAGAM TANGGUH FORTINDO PT. | S0255 | CLOSED | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | LBR | 1,100,435.93 | 0 | Net 60 | UNTUK DINDING GUDANG 93 |
| 260100149 | 2026-01-12 | PERSEDIAAN UMUM | 6030.2569 | DR SHIELD SHEET SINGLE WALL RF1050 LE=1050MM P=8,4 M | 260100303 | 716,800 | 260100303 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 30 | 716,800 | 7 | 260100909 | 2026-01-27 | 8 | 2026-01-26 | Late | Lokal | IDR | RAGAM TANGGUH FORTINDO PT. | S0255 | CLOSED | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | LBR | 21,504,000 | 0 | Net 60 | UNTUK DINDING GUDANG 93 |
| 260100149 | 2026-01-12 | PERSEDIAAN UMUM | 6030.2571 | DR SONNE ST 375 MILKY CLEAR L= 375 MM P= 4,1 M | 260100303 | 241,272 | 260100303 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 11 | 241,272 | 7 | 260101760 | 2026-02-19 | 31 | 2026-01-26 | Late | Lokal | IDR | RAGAM TANGGUH FORTINDO PT. | S0255 | CLOSED | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | LBR | 2,653,992 | 0 | Net 60 | UNTUK DINDING GUDANG 93 |
| 260100149 | 2026-01-12 | PERSEDIAAN UMUM | 6030.2572 | DR SONNE ST 375 MILKY CLEAR L= 375 MM P= 5 M | 260101049 | 294,234.23 | 260100303 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 7 | 294,234.23 | 7 | 260101760 | 2026-02-19 | 31 | 2026-01-26 | Late | Lokal | IDR | RAGAM TANGGUH FORTINDO PT. | S0255 | CLOSED | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | LBR | 2,059,639.61 | 0 | Net 60 | UNTUK DINDING GUDANG 93 |
| 260100155 | 2026-01-13 | SPAREPART | 5031.013 | LEM TIP TOP SC 2000 | 260300146 | 572,072.07 | 260100295 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 4 | 572,072.07 | 6 | 260100772 | 2026-01-22 | 3 | 2026-02-06 | On time | Lokal | IDR | CENTRAL TEKNINDO A P PT. | S0133 | CLOSED | CLOSED | 2026-01-16 | Nanda Ayu Pratiwi | SET | 2,288,288.29 | 0 | Net 60 | BMSD |
| 260100156 | 2026-01-13 | SPAREPART | 5028.0201 | MARTIN PULLY SPB 212 - 3 TAPER BUSH 2517 - 40 | 260100305 | 1,490,000 | 260100305 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 3 | 1,490,000 | 6 | 260100744 | 2026-01-22 | 3 | 2026-02-06 | On time | Lokal | IDR | PRIMA ANJAYA SANTOSO. PT | S0896 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 4,470,000 | 0 | Net 30 | – |
| 260100156 | 2026-01-13 | SPAREPART | 5028.0202 | MARTIN PULLY SPB 170 - 3 TAPER BUSH 2517 - 42 | 260100305 | 1,150,000 | 260100305 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 3 | 1,150,000 | 6 | 260100744 | 2026-01-22 | 3 | 2026-02-06 | On time | Lokal | IDR | PRIMA ANJAYA SANTOSO. PT | S0896 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 3,450,000 | 0 | Net 30 | – |
| 260100156 | 2026-01-13 | SPAREPART | 5028.02 | MARTIN PULLY SPB 200 - 3 TAPER BUSH 2517 - 42 | 260100305 | 1,450,000 | 260100305 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 6 | 1,450,000 | 6 | 260100744 | 2026-01-22 | 3 | 2026-02-06 | On time | Lokal | IDR | PRIMA ANJAYA SANTOSO. PT | S0896 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 8,700,000 | 0 | Net 30 | – |
| 260100156 | 2026-01-13 | SPAREPART | 5028.0198 | MARTIN PULLY SPA 180 - 4 TAPER BUSH 2517 - 42 | 260100305 | 1,195,000 | 260100305 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 4 | 1,195,000 | 6 | 260100744 | 2026-01-22 | 3 | 2026-02-06 | On time | Lokal | IDR | PRIMA ANJAYA SANTOSO. PT | S0896 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 4,780,000 | 0 | Net 30 | – |
| 260100156 | 2026-01-13 | SPAREPART | 5028.0199 | MARTIN PULLY SPA 170 - 4 TAPER BUSH 2517 - 45 | 260100305 | 1,160,000 | 260100305 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 4 | 1,160,000 | 6 | 260100744 | 2026-01-22 | 3 | 2026-02-06 | On time | Lokal | IDR | PRIMA ANJAYA SANTOSO. PT | S0896 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 4,640,000 | 0 | Net 30 | – |
| 260100158 | 2026-01-13 | PERSEDIAAN UMUM | 6030.0515 | CAT BESI AVIAN LEMONADE 480 | 260600171 | 70,725.23 | 260100294 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 10 | 57,472.97 | 6 | 260101028 | 2026-01-29 | 10 | 2026-02-06 | On time | Lokal | IDR | TIRTAKENCANA TATAWARNA PT. | S0404 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | KG | 574,729.73 | 0 | Net 30 | AREA PRODUKSI PN1. KEMASAN @ 1 KG |
| 260100159 | 2026-01-13 | STATIONERY | 6010.004 | FORM LAPORAN KONDISI PRODUKSI FR-PROD-11 A4, FR-PROD-11 | 260600255 | 12,000 | 260100292 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 20 | 12,500 | 6 | 260100913 | 2026-01-27 | 8 | 2026-02-06 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | BUKU | 250,000 | 0 | Net 30 | PRODUKSI PN1. A4 1 ply |
| 260100161 | 2026-01-13 | BAHAN BAKAR | 4050.0014 | SUPER GEAR OIL DAPHNE SUPER GEAR OIL 320 (IDEMITSU) | 260600094 | 70,750 | 260100306 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 400 | 48,750 | 6 | – | – | – | 2026-02-06 | Overdue | Lokal | IDR | GUNATAMA SUKSES MANDIRI PT. | S0128 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | LTR | 19,500,000 | 0 | Net 60 | GEARBOX BALL MILL 40 TON |
| 260100161 | 2026-01-13 | BAHAN BAKAR | 4050.0014 | SUPER GEAR OIL DAPHNE SUPER GEAR OIL 320 (IDEMITSU) | 260600094 | 70,750 | 260100306 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 400 | 48,750 | 6 | – | – | – | 2026-02-06 | Overdue | Lokal | IDR | GUNATAMA SUKSES MANDIRI PT. | S0128 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | LTR | 19,500,000 | 0 | Net 60 | GEARBOX BALL MILL 40 TON |
| 260100161 | 2026-01-13 | BAHAN BAKAR | 4050.0014 | SUPER GEAR OIL DAPHNE SUPER GEAR OIL 320 (IDEMITSU) | 260600094 | 70,750 | 260100306 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 400 | 48,750 | 6 | 260101329 | 2026-02-07 | 19 | 2026-02-06 | Late | Lokal | IDR | GUNATAMA SUKSES MANDIRI PT. | S0128 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | LTR | 19,500,000 | 0 | Net 60 | GEARBOX BALL MILL 40 TON |
| 260100161 | 2026-01-13 | BAHAN BAKAR | 4050.0014 | SUPER GEAR OIL DAPHNE SUPER GEAR OIL 320 (IDEMITSU) | 260600094 | 70,750 | 260100306 | 2026-01-19 | 2026-01-30 | 2026-01-30 | 400 | 48,750 | 6 | 260100923 | 2026-01-27 | 8 | 2026-02-06 | On time | Lokal | IDR | GUNATAMA SUKSES MANDIRI PT. | S0128 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | LTR | 19,500,000 | 0 | Net 60 | GEARBOX BALL MILL 40 TON |
| 260100180 | 2026-01-08 | BAHAN BAKAR | 4010.0001 | SOLAR | 260600111 | 20,720.72 | 260100283 | 2026-01-19 | 2026-01-21 | 2026-01-21 | 8,000 | 12,792.79 | 11 | 260100714 | 2026-01-22 | 3 | 2026-01-28 | On time | Lokal | IDR | INDOMOBIL PRIMA ENERGI, PT | S0131 | CLOSED | CLOSED | 2026-01-12 | Gandhi | LTR | 102,342,344 | 0 | Net 30 | PENGISIAN TANGKI PN2 |
| 260110004 | 2026-01-05 | PERSEDIAAN UMUM | 6050.1259 | GEMBOK 60MM | 260510010 | 38,000 | 260110111 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 5 | 25,567.2 | 14 | 260110412 | 2026-01-22 | 3 | 2026-01-26 | On time | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | OPEN | CLOSED | 2026-01-12 | Tika Lisnawati | PCS | 127,836 | 0 | COD | REFF : 002/MRS/ENG/I/2026 KEBUTUHAN TOOLS SPD & SILO, ATAS PERMINTAAN ADITYA RAHMAN |
| 260110011 | 2026-01-06 | SPAREPART | 5017.0117 | STEKER BROCO | 260600199 | 11,712 | 260110105 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 20 | 16,000 | 13 | – | – | – | 2026-01-26 | Overdue | Lokal | IDR | TARUMA GITA PERSADA PT. | S0462 | OPEN | OPEN | 2026-01-13 | Tika Lisnawati | PCS | 320,000 | 20 | Net 45 | REFF : 003/MRS/ENG/I/2026 KEBUTUHAN PROJECT PK02 B, ATAS PERMINTAAN ADITYA, MERK BROCO |
| 260110020 | 2026-01-09 | SPAREPART | 5017.0118 | STOP KONTAK 2 LUBANG | 260610029 | 14,500 | 260110104 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 15 | 45,000 | 10 | 260110404 | 2026-01-22 | 3 | 2026-01-26 | On time | Lokal | IDR | RENEO GLOBAL INDONESIA, PT. | S0773 | OPEN | CLOSED | 2026-01-16 | Tika Lisnawati | PCS | 675,000 | 0 | Net 14 | REFF : 001/PP/ENG/I/2026 KEBUTUHAN INSTALASI ELECTRICAL RnD PK02, ATAS PERMINTAAN HELDI |
| 260110025 | 2026-01-13 | PERSEDIAAN UMUM | 6020.0542 | KABEL NYYHY 3X2.5MM | 260110286 | 27,700 | 260110110 | 2026-01-19 | 2026-01-19 | 2026-01-19 | 400 | 24,200 | 6 | 260110507 | 2026-01-28 | 9 | 2026-01-26 | Late | Lokal | IDR | DUTA MAKMUR MULYA, PT | S0844 | OPEN | CLOSED | 2026-01-20 | Tika Lisnawati | METER | 9,680,000 | 0 | Net 45 | REFF. 010/PP/ENG/I/2026 UNTUK KEBUTUHAN PJU PK02, PERMINTAAN BP. DIAN SONATA |
| 251200074 | 2025-12-03 | PERSEDIAAN UMUM | 6020.0669 | KABEL SCUN RING 2.5 MM | 260100315 | 500 | 260100315 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 300 | 500 | 48 | 260100863 | 2026-01-26 | 6 | 2026-01-27 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2025-12-30 | Nanda Ayu Pratiwi | PCS | 150,000 | 0 | Net 30 | CONVEYOR SILO SPRAY DRYER TO SILO PRESS, UNTUK PANEL CONTROL |
| 251200232 | 2025-12-12 | SPAREPART | 5017.1025 | PLC CP2EN40DR | 260100325 | 3,700,000 | 260100325 | 2026-01-20 | 2026-02-10 | 2026-02-10 | 6 | 3,700,000 | 39 | 260101388 | 2026-02-09 | 20 | 2026-02-17 | On time | Lokal | IDR | SAMUDERA TEKNIK ABADI | S0383 | OPEN | CLOSED | 2025-12-16 | Nanda Ayu Pratiwi | PCS | 22,200,000 | 0 | Net 30 | (OVERHAUL) PANEL OUT HD 1A, INPUT KILN 1 AB, OUT KILN 1B, HD 1B, |
| 251200232 | 2025-12-12 | SPAREPART | 5017.1025 | PLC CP2EN40DR | 260100325 | 3,700,000 | 260100325 | 2026-01-20 | 2026-02-10 | 2026-02-10 | 6 | 3,700,000 | 39 | 260100799 | 2026-01-23 | 3 | 2026-02-17 | On time | Lokal | IDR | SAMUDERA TEKNIK ABADI | S0383 | OPEN | CLOSED | 2025-12-16 | Nanda Ayu Pratiwi | PCS | 22,200,000 | 0 | Net 30 | (OVERHAUL) PANEL OUT HD 1A, INPUT KILN 1 AB, OUT KILN 1B, HD 1B, |
| 251200232 | 2025-12-12 | SPAREPART | 5017.0505 | OMRON HMI NB 7W - TW00B | 260100326 | 2,900,000 | 260100326 | 2026-01-20 | 2026-01-31 | 2026-01-31 | 2 | 2,900,000 | 39 | 260100795 | 2026-01-23 | 3 | 2026-02-07 | On time | Lokal | IDR | PUTRA ANDALAN SAKTI PT. | S0139 | OPEN | CLOSED | 2025-12-16 | Nanda Ayu Pratiwi | PCS | 5,800,000 | 0 | Net 60 | (OVERHAUL) PANEL INPUT KILN 1 AB |
| 251200232 | 2025-12-12 | SPAREPART | 5017.0322 | PUSH BUTTON TELE XB4-BS542 EX XB4-BS8442 | 260500150 | 152,500 | 260100326 | 2026-01-20 | 2026-01-31 | 2026-01-31 | 3 | 168,500 | 39 | 260100795 | 2026-01-23 | 3 | 2026-02-07 | On time | Lokal | IDR | PUTRA ANDALAN SAKTI PT. | S0139 | OPEN | CLOSED | 2025-12-16 | Nanda Ayu Pratiwi | PCS | 505,500 | 0 | Net 60 | (OVERHAUL) PANEL KOMPENSATOR BESAR 1AB, PACKING 2A DAN 2B |
| 251200234 | 2025-12-15 | SPAREPART | 5011.0411 | BEARING RN 307 NTN | 260300230 | 175,000 | 260100340 | 2026-01-20 | 2026-01-31 | 2026-01-31 | 8 | 175,000 | 36 | 260100806 | 2026-01-23 | 3 | 2026-02-07 | On time | Lokal | IDR | ASIAN BERINDO JAYA PT. | S0037 | CLOSED | CLOSED | 2025-12-22 | Nanda Ayu Pratiwi | PCS | 1,400,000 | 0 | Net 60 | GEARBOX TANGKI GLAZE |
| 251200384 | 2025-12-23 | PERSEDIAAN UMUM | 6050.1217 | KUNCI TABUNG | 260100309 | 400,000 | 260100309 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 1 | 400,000 | 28 | 260100640 | 2026-01-20 | – | 2026-01-27 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2025-12-26 | Nanda Ayu Pratiwi | PCS | 400,000 | 0 | Net 60 | INSTALASI MESIN POLISHING(Kunci Pipa 36") |
| 251200428 | 2025-12-26 | PERSEDIAAN UMUM | 6030.008 | PIPA GALVANIS 1 INCH MED SNI | 260600210 | 320,000 | 260100314 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 10 | 278,108.11 | 25 | 260100826 | 2026-01-24 | 4 | 2026-01-27 | On time | Lokal | IDR | SARANA INDO MANDIRI | S0484 | CLOSED | CLOSED | 2025-12-31 | Nanda Ayu Pratiwi | BTG | 2,781,081.1 | 0 | Net 45 | UNTUK PIPA ANGIN MOLEN GLAZE PN 1 |
| 260100020 | 2026-01-05 | PERSEDIAAN UMUM | 6060.0635 | SKRUP TAPPING 8X3/8 | 260100317 | 95.23 | 260100317 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 5,000 | 95.23 | 15 | 260101016 | 2026-01-29 | 9 | 2026-01-27 | Late | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-09 | Nanda Ayu Pratiwi | PCS | 476,150 | 0 | Net 30 | UNTUK INSTALASI HD |
| 260100022 | 2026-01-05 | SPAREPART | 5030.0708 | PNEUMATIC STRAPPING TOOL XQD-19 | 260600022 | 6,550,000 | 260100321 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 2 | 8,500,000 | 15 | 260100899 | 2026-01-27 | 7 | 2026-01-27 | On time | Lokal | IDR | LENTERA 3 PUTRA UD. | S1017 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | SET | 17,000,000 | 0 | Net 30 | PRODUKSI PN1 |
| 260100072 | 2026-01-08 | PERSEDIAAN UMUM | 6030.1185 | PIPA GALVANIS 1 INCH T=3 MM | 260100314 | 278,108.11 | 260100314 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 50 | 278,108.11 | 12 | 260100826 | 2026-01-24 | 4 | 2026-01-27 | On time | Lokal | IDR | SARANA INDO MANDIRI | S0484 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | BTG | 13,905,405.5 | 0 | Net 45 | UNTUK GLAZING LINE 1 PN2 |
| 260100072 | 2026-01-08 | PERSEDIAAN UMUM | 6030.2337 | BESI HOLLOW 50X50X5MM | 260400086 | 345,945.95 | 260100314 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 20 | 720,720.72 | 12 | 260100826 | 2026-01-24 | 4 | 2026-01-27 | On time | Lokal | IDR | SARANA INDO MANDIRI | S0484 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | BTG | 14,414,414.4 | 0 | Net 45 | UNTUK GLAZING LINE 1 PN2 |
| 260100072 | 2026-01-08 | PERSEDIAAN UMUM | 6030.0898 | BESI UNP 100X50X5MM (@ 6000MM) SNI | 260610067 | 576,000 | 260100314 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 10 | 576,576.57 | 12 | 260100826 | 2026-01-24 | 4 | 2026-01-27 | On time | Lokal | IDR | SARANA INDO MANDIRI | S0484 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | BTG | 5,765,765.7 | 0 | Net 45 | UNTUK GLAZING LINE 1 PN2 |
| 260100072 | 2026-01-08 | PERSEDIAAN UMUM | 6030.0366 | PIPA GALVANIS 3/4 INCH | 260100314 | 185,405.41 | 260100314 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 50 | 185,405.41 | 12 | 260100826 | 2026-01-24 | 4 | 2026-01-27 | On time | Lokal | IDR | SARANA INDO MANDIRI | S0484 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | BTG | 9,270,270.5 | 0 | Net 45 | UNTUK GLAZING LINE 1 PN2 |
| 260100119 | 2026-01-10 | FIXED ASSETS | AST02588 | AC WINDOW 1/2 PK AC PANEL | 260100316 | 2,210,000 | 260100316 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 2 | 2,210,000 | 10 | 260100906 | 2026-01-27 | 7 | 2026-01-27 | On time | Lokal | IDR | DAVINDO ANUGRAH UNGGUL. CV | S0740 | CLOSED | CLOSED | 2026-01-17 | Nanda Ayu Pratiwi | – | 4,420,000 | 0 | Net 14 | PACKING 1A |
| 260100154 | 2026-01-13 | PERSEDIAAN UMUM | 6030.2573 | SELANG SPIRAL DUCTING 4 INCH | 260100324 | 267,000 | 260100324 | 2026-01-20 | 2026-01-31 | 2026-01-31 | 15 | 267,000 | 7 | 260100710 | 2026-01-21 | 1 | 2026-02-07 | On time | Lokal | IDR | PRATAMA AMERTA SOLUSI PT | S0654 | OPEN | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | MTR | 4,005,000 | 0 | Net 30 | DUST COLLECTOR KECIL PN1 & PN2. SELANG SPIRAL TRANSPARANT KAWAT DALAM (BRONZE) |
| 260100154 | 2026-01-13 | PERSEDIAAN UMUM | 6020.0138 | KLEM SLANG 5 INCH | 260600173 | 11,171.17 | 260100323 | 2026-01-20 | 2026-01-31 | 2026-01-31 | 20 | 30,405.41 | 7 | 260100776 | 2026-01-22 | 2 | 2026-02-07 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | OPEN | CLOSED | 2026-01-15 | Nanda Ayu Pratiwi | PCS | 608,108.1 | 0 | Net 30 | DUST COLLECTOR KECIL PN1 & PN2 |
| 260100157 | 2026-01-13 | SPAREPART | 5011.0543 | BEARING NJ 2308 EC3 FAG | 260100327 | 480,000 | 260100327 | 2026-01-20 | 2026-01-30 | 2026-01-30 | 2 | 480,000 | 7 | 260100973 | 2026-01-28 | 8 | 2026-02-06 | On time | Lokal | IDR | CENTURY BEARINDO PT. (PPN) | S0043 | CLOSED | CLOSED | 2026-01-16 | Nanda Ayu Pratiwi | PCS | 960,000 | 0 | Net 60 | BMSD |
| 260100173 | 2026-01-14 | PERSEDIAAN UMUM | 6030.0694 | SELANG BLANDER | 260600068 | 27,027.03 | 260100317 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 100 | 22,522.52 | 6 | 260100775 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-20 | Nanda Ayu Pratiwi | MTR | 2,252,252 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100185 | 2026-01-14 | PERSEDIAAN UMUM | 6030.2312 | ELBOW LAS 3 INCH | 260300150 | 59,000 | 260100320 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 4 | 49,189.18 | 6 | 260100773 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 196,756.72 | 0 | Net 30 | UNTUK PIPA ANGIN DAN AIR PN2 |
| 260100185 | 2026-01-14 | PERSEDIAAN UMUM | 6030.1302 | FLANGE 3 INCH JIS 10K | 260100320 | 40,540.54 | 260100320 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 10 | 40,540.54 | 6 | 260100773 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 405,405.4 | 0 | Net 30 | UNTUK PIPA ANGIN DAN AIR PN2 |
| 260100185 | 2026-01-14 | PERSEDIAAN UMUM | 6030.0945 | ELBOW 4 INCH DRAT DALAM | 260100320 | 96,846.84 | 260100320 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 10 | 96,846.84 | 6 | 260100773 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-19 | Nanda Ayu Pratiwi | PCS | 968,468.4 | 0 | Net 30 | UNTUK PIPA ANGIN DAN AIR PN2P |
| 260100187 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0086 | SARUNG TANGAN LAS | 260510093 | 22,523 | 260100318 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 10 | 72,000 | 5 | 260100769 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | PSNG | 720,000 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100187 | 2026-01-15 | PERSEDIAAN UMUM | 6050.0059 | SARUNG TANGAN | 260600168 | 17,600 | 260100318 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 10 | 20,500 | 5 | 260100769 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | PACK | 205,000 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100187 | 2026-01-15 | PERSEDIAAN UMUM | 6030.062 | KUAS 2 INCH | 260610216 | 9,010 | 260100317 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 50 | 7,702.7 | 5 | 260100940 | 2026-01-27 | 7 | 2026-01-27 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | PCS | 385,135 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |
| 260100187 | 2026-01-15 | PERSEDIAAN UMUM | 6030.0936 | REFILL KUAS ROLL KECIL 110MM (ACE OLDFIELD) | 260500300 | 5,518.02 | 260100319 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 100 | 9,000 | 5 | 260100777 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | PCS | 900,000 | 0 | Net 60 | UNTUK OPERASIONAL PROYEK |
| 260100187 | 2026-01-15 | PERSEDIAAN UMUM | 6030.0733 | RESIBON POTONG 105X1.2X16 | 260500492 | 2,702.7 | 260100317 | 2026-01-20 | 2026-01-20 | 2026-01-20 | 1,000 | 2,702.7 | 5 | 260100775 | 2026-01-22 | 2 | 2026-01-27 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-01-14 | Nanda Ayu Pratiwi | PCS | 2,702,700 | 0 | Net 30 | UNTUK OPERASIONAL PROYEK |