Consolidated data
LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)
How the files are consolidated— click to expand
Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.
LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.
PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.
VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR Noⓘ | PR Dateⓘ | Item Groupⓘ | Item Codeⓘ | Itemⓘ | Last POⓘ | Last Priceⓘ | PO Noⓘ | PO Date ▲ⓘ | ETAⓘ | ETA (PO Report)ⓘ | Qtyⓘ | Priceⓘ | PR→POⓘ | GRPO Noⓘ | GRPO Dateⓘ | PO→GRPOⓘ | Deadlineⓘ | Realisasiⓘ | L/Iⓘ | Currencyⓘ | Vendorⓘ | Vendor Codeⓘ | Status PRⓘ | Status POⓘ | Required Dateⓘ | Request Byⓘ | UoMⓘ | Total POⓘ | Outstandingⓘ | TOPⓘ | Remarksⓘ |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300932 | 2026-03-30 | 21 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300931 | 2026-03-30 | 21 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300930 | 2026-03-30 | 21 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400128 | 2026-04-06 | 28 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300929 | 2026-03-30 | 21 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | – | – | – | 2026-04-06 | Overdue | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400130 | 2026-04-06 | 28 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400129 | 2026-04-06 | 28 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260301024 | 2026-03-31 | 22 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400047 | 2026-04-02 | 24 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400048 | 2026-04-02 | 24 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400049 | 2026-04-02 | 24 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260301023 | 2026-03-31 | 22 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400235 | 2026-04-09 | 31 | 2026-04-06 | Late | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400110 | 2026-04-04 | 26 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400236 | 2026-04-09 | 31 | 2026-04-06 | Late | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400109 | 2026-04-04 | 26 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300966 | 2026-03-31 | 22 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400237 | 2026-04-09 | 31 | 2026-04-06 | Late | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400315 | 2026-04-10 | 32 | 2026-04-06 | Late | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400316 | 2026-04-10 | 32 | 2026-04-06 | Late | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260400108 | 2026-04-04 | 26 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300967 | 2026-03-31 | 22 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300968 | 2026-03-31 | 22 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100696 | 2026-02-18 | BAHAN BAKAR | 4020.0002 | BATU BARA ADB 6300 - 6500 | 260600262 | 1,750 | 260300162 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 1,560 | 19 | 260300969 | 2026-03-31 | 22 | 2026-04-06 | On time | Lokal | IDR | HUAYAO ENERGI INDONESIA PT. | S0130 | CLOSED | CLOSED | 2026-02-25 | Qhadafy | KG | 1,716,000,000 | 0 | Net 30 | – |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400852 | 2026-04-23 | 45 | 2026-04-06 | Late | Lokal | IDR | TIGA PUTRA PUTRA AYU UD. | S0113 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | PCS | 42,500,000 | 0 | Net 10 | – |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400654 | 2026-04-18 | 40 | 2026-04-06 | Late | Lokal | IDR | TIGA PUTRA PUTRA AYU UD. | S0113 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | PCS | 42,500,000 | 0 | Net 10 | – |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400904 | 2026-04-24 | 46 | 2026-04-06 | Late | Lokal | IDR | TIGA PUTRA PUTRA AYU UD. | S0113 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | PCS | 42,500,000 | 0 | Net 10 | – |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400556 | 2026-04-16 | 38 | 2026-04-06 | Late | Lokal | IDR | TIGA PUTRA PUTRA AYU UD. | S0113 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | PCS | 42,500,000 | 0 | Net 10 | – |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,700 | 25,000 | 18 | 260401158 | 2026-04-30 | 52 | 2026-04-06 | Late | Lokal | IDR | TIGA PUTRA PUTRA AYU UD. | S0113 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | PCS | 42,500,000 | 0 | Net 10 | – |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,700 | 25,000 | 18 | 260401065 | 2026-04-29 | 51 | 2026-04-06 | Late | Lokal | IDR | TIGA PUTRA PUTRA AYU UD. | S0113 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | PCS | 42,500,000 | 0 | Net 10 | – |
| 260100730 | 2026-02-19 | BAHAN PEMBANTU | 2045.0004 | PALLET LOKAL SETENGAH BARU 95*110*11 | 260400334 | 25,000 | 260300174 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,700 | 25,000 | 18 | 260400787 | 2026-04-22 | 44 | 2026-04-06 | Late | Lokal | IDR | TIGA PUTRA PUTRA AYU UD. | S0113 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | PCS | 42,500,000 | 0 | Net 10 | – |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.0082 | REFILL PENGHARUM RUANGAN (STELLA) | 260300169 | 56,300 | 260300169 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 4 | 56,300 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time | Lokal | IDR | RIANG RIA SWALAYAN | S0187 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 225,200 | 0 | - Cash Basic - | JAPANESE SAKURA = 2 PN1, ORANGE TWIST=2 (WHSP 2). STELLA KALENG |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.1372 | REFIL PENGHARUM RUANGAN (GLADE) | 260500138 | 32,500 | 260300169 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 6 | 34,300 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time | Lokal | IDR | RIANG RIA SWALAYAN | S0187 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 205,800 | 0 | - Cash Basic - | OCEAN ESCAPE= 6 (PROYEK=2, MTN=2, WHSP=2, ). GLADE KALENG |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6010.0326 | PENGHARUM RUANGAN | 260600165 | 9,175 | 260300169 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 4 | 8,800 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time | Lokal | IDR | RIANG RIA SWALAYAN | S0187 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 35,200 | 0 | - Cash Basic - | GOLDEN VANILA PENGUIN=4 (PN2=2, PN1=2, ). STELLA GANTUNG |
| 260100758 | 2026-02-20 | PERSEDIAAN UMUM | 6050.1399 | REFILL PENGHARUM RUANGAN (STELLA - APPLE FIESTA) | 260300169 | 30,500 | 260300169 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 2 | 30,500 | 17 | 260300487 | 2026-03-11 | 2 | 2026-03-23 | On time | Lokal | IDR | RIANG RIA SWALAYAN | S0187 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 61,000 | 0 | - Cash Basic - | APPLE FIESTA=2 (WHSP 2). STELLA KALENG |
| 260100763 | 2026-02-21 | SPAREPART | 5019.013 | GEAR REDUCER MNRV 063 1:30 FLANGE B 14 + MOTOR 0.75KW 1460RPM + 380VOLT | 260300201 | 9,000,000 | 260300201 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 2 | 9,000,000 | 16 | 260300716 | 2026-03-17 | 8 | 2026-03-23 | On time | Lokal | IDR | MULTI TEKNIK TELAGA INDONESIA PT. | S0415 | CLOSED | CLOSED | 2026-02-28 | Gita | PCS | 18,000,000 | 0 | Net 30 | UP DOWN LINE 1C |
| 260100819 | 2026-02-24 | SPAREPART | 5031.0997 | TEFLON KOPLING OD 58X118 | 260300224 | 115,000 | 260300224 | 2026-03-09 | 2026-03-29 | 2026-03-29 | 60 | 115,000 | 13 | 260400885 | 2026-04-23 | 45 | 2026-04-05 | Late | Lokal | IDR | YESINDO UTAMA CV. | S0373 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 6,900,000 | 0 | Net 60 | BALLMILL 40 TON NO 14 & 18 |
| 260100854 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0458 | KABEL TIES 30CM X 4.6MM | 260410099 | 17,436.6 | 260300196 | 2026-03-09 | 2026-03-28 | 2026-03-28 | 25 | 24,774.78 | 12 | 260300742 | 2026-03-17 | 8 | 2026-04-04 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PACK | 619,369.38 | 0 | Net 30 | STOK WHSP |
| 260100855 | 2026-02-25 | SPAREPART | 5011.0414 | BEARING SKF 6215 2Z C3 | 260300229 | 428,500 | 260300229 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 6 | 428,500 | 12 | 260300533 | 2026-03-12 | 3 | 2026-04-06 | On time | Lokal | IDR | SENTRAL LAHARINDO S PT. | S0145 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 2,571,000 | 0 | Net 60 | STOK WHSP |
| 260100855 | 2026-02-25 | SPAREPART | 5011.0411 | BEARING RN 307 NTN | 260300230 | 175,000 | 260300230 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 15 | 175,000 | 12 | 260401106 | 2026-04-29 | 51 | 2026-04-06 | Late | Lokal | IDR | ASIAN BERINDO JAYA PT. | S0037 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 2,625,000 | 0 | Net 60 | STOK WHSP |
| 260100855 | 2026-02-25 | SPAREPART | 5011.0439 | BEARING 6314 ZZ C3 SKF | 260300229 | 771,100 | 260300229 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 6 | 771,100 | 12 | 260300533 | 2026-03-12 | 3 | 2026-04-06 | On time | Lokal | IDR | SENTRAL LAHARINDO S PT. | S0145 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 4,626,600 | 0 | Net 60 | STOK WHSP |
| 260100871 | 2026-02-25 | PERSEDIAAN UMUM | 6050.0018 | KRAN AIR 1/2 INCH | 260500490 | 33,783.78 | 260300231 | 2026-03-09 | 2026-03-28 | 2026-03-28 | 5 | 31,531.53 | 12 | 260300813 | 2026-03-18 | 9 | 2026-04-04 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 157,657.66 | 0 | Net 30 | STOK WHSP |
| 260100871 | 2026-02-25 | PERSEDIAAN UMUM | 6050.0049 | KAPI 4 INCH | 260500006 | 13,243.24 | 260300231 | 2026-03-09 | 2026-03-28 | 2026-03-28 | 12 | 12,612.61 | 12 | 260300741 | 2026-03-17 | 8 | 2026-04-04 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 151,351.36 | 0 | Net 30 | STOK WHSP |
| 260100872 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0076 | KLEM SLANG 3/4 INCH | 260500490 | 2,342.34 | 260300197 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 15 | 2,252.25 | 12 | 260300473 | 2026-03-11 | 2 | 2026-04-06 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 33,783.78 | 0 | Net 30 | STOK WHSP |
| 260100872 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0053 | KLEM SLANG 1/2 INCH | 260500490 | 2,342.34 | 260300197 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 15 | 2,252.25 | 12 | 260300473 | 2026-03-11 | 2 | 2026-04-06 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 33,783.78 | 0 | Net 30 | STOK WHSP |
| 260100875 | 2026-02-25 | PERSEDIAAN UMUM | 6030.271 | BESI POLOS 16 MM | 260300212 | 156,216.22 | 260300212 | 2026-03-09 | 2026-03-09 | 2026-03-09 | 4 | 156,216.22 | 12 | 260300909 | 2026-03-28 | 19 | 2026-03-16 | Late | Lokal | IDR | RANGKA RAYA PT. | S0450 | CLOSED | CLOSED | 2026-03-01 | Gita | BTG | 624,864.88 | 0 | Net 14 | PERBAIKAN JALAN DEPAN DUST COLLECTOR PN1 |
| 260100875 | 2026-02-25 | PERSEDIAAN UMUM | 6030.2711 | KAYU 5X7 | 260300217 | 100,000 | 260300217 | 2026-03-09 | 2026-03-09 | 2026-03-09 | 12 | 100,000 | 12 | 260300543 | 2026-03-12 | 3 | 2026-03-16 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-03-01 | Gita | BTG | 1,200,000 | 0 | Net 60 | PERBAIKAN JALAN DEPAN DUST COLLECTOR PN1 |
| 260100892 | 2026-02-26 | SPAREPART | 5027.0468 | GEAR MOTOR TRANSMAX TR 97 RATIO 92.48 SET MOTOR YUEMA YDA 2.2KW 3PHS 380V | 260300164 | 12,710,000 | 260300164 | 2026-03-09 | 2026-03-09 | 2026-03-09 | 3 | 12,710,000 | 11 | 260300722 | 2026-03-17 | 8 | 2026-03-16 | Late | Lokal | IDR | CV.UTAMA JAYA TEKNIK | S0700 | CLOSED | CLOSED | 2026-03-05 | Gita | PCS | 38,130,000 | 0 | Net 60 | FRAME CONVEYOR PRESS 1C |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6050.1379 | BAUT BAUT DRILLING M8 | 260300195 | 278.38 | 260300195 | 2026-03-09 | 2026-03-17 | 2026-03-17 | 100 | 278.378 | 9 | 260300734 | 2026-03-17 | 8 | 2026-03-24 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-06 | Gita | PCS | 27,837.8 | 0 | Net 30 | ALAT & MATERIAL PERBAIKAN ATAP - TEKNIK SIPIL. M8X30 |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6030.2777 | MATA BOR DRILLING M8 | 260300195 | 9,009.01 | 260300195 | 2026-03-09 | 2026-03-17 | 2026-03-17 | 2 | 9,009.01 | 9 | 260300732 | 2026-03-17 | 8 | 2026-03-24 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-06 | Gita | PCS | 18,018.02 | 0 | Net 30 | ALAT & MATERIAL PERBAIKAN ATAP - TEKNIK SIPIL |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0366 | GERINDA TANGAN GA 7020 OD 180 MM | 260300192 | 2,100,000 | 260300192 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1 | 2,100,000 | 9 | 260300563 | 2026-03-13 | 4 | 2026-04-06 | On time | Lokal | IDR | YUNIKA TRIJAYA SENTOSA, PT | S0649 | CLOSED | CLOSED | 2026-03-06 | Gita | PCS | 2,100,000 | 0 | Net 30 | ALAT & MATERIAL PERBAIKAN ATAP - TEKNIK SIPIL. MAKITA |
| 260100920 | 2026-02-28 | PERSEDIAAN UMUM | 6030.2778 | BOR TANGAN MAKITA | 260400090 | 923,000 | 260300192 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1 | 923,000 | 9 | 260300563 | 2026-03-13 | 4 | 2026-04-06 | On time | Lokal | IDR | YUNIKA TRIJAYA SENTOSA, PT | S0649 | CLOSED | CLOSED | 2026-03-06 | Gita | PCS | 923,000 | 0 | Net 30 | ALAT & MATERIAL PERBAIKAN ATAP - TEKNIK SIPIL. MAKITA HP1630 710 WATT |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.1878 | CAT AVIAN TWILIGHT BLUE KODE 731 @18LITER | 260610139 | 1,514,692.58 | 260310059 | 2026-03-09 | 2026-03-09 | 2026-03-09 | 3 | 1,108,709.91 | 11 | – | – | – | 2026-03-16 | Overdue | Lokal | IDR | TIRTAKENCANA TATAWARNA PT. | S0404 | OPEN | OPEN | 2026-03-05 | Ibnu Darmawan | PAIL | 3,326,129.73 | 3 | Net 30 | REFF : 055/MRS/ENG/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN BPK CHUNGKING |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6050.1376 | SIKA ANCHORFIX-1 300ML | 260310080 | 317,000 | 260310080 | 2026-03-09 | 2026-03-09 | 2026-03-09 | 15 | 317,000 | 11 | – | – | – | 2026-03-16 | Overdue | Lokal | IDR | DUTA MAKMUR MULYA, PT | S0844 | OPEN | OPEN | 2026-03-05 | Ibnu Darmawan | BOTOL | 4,755,000 | 15 | Net 45 | REFF : 055/MRS/ENG/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN BPK CHUNGKING |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0224 | PIN WITH THREAD C9999660040 | 260300181 | 14.5 | 260300181 | 2026-03-09 | 2026-04-30 | 2026-04-30 | 10 | 14.5 | 7 | – | – | – | 2026-05-07 | Overdue | Impor | EUR | INTERSER S.P.A. | S0782 | CLOSED | OPEN | 2026-03-05 | Gita | PCS | 2,849,457.35 | 10 | Net 30 | PRODUKSI , PRINTER BOX, PACKING 1A & 1B |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0222 | SHORT TIN TUBE W/CAP (SHORT PIPE) C9999660029 ZANASI | 260300182 | 140,000 | 260300182 | 2026-03-09 | 2026-04-30 | 2026-04-30 | 10 | 140,000 | 7 | 260500301 | 2026-05-11 | 63 | 2026-05-07 | Late | Lokal | IDR | KERAMIKA JAYA INDOTALI PT. | S0134 | CLOSED | CLOSED | 2026-03-05 | Gita | PCS | 1,400,000 | 0 | Net 30 | PRODUKSI , PRINTER BOX, PACKING 1A & 1B |
| 260300004 | 2026-03-02 | SPAREPART | 5030.0223 | LONG PIPE C9999660028 | 260300182 | 140,000 | 260300182 | 2026-03-09 | 2026-04-30 | 2026-04-30 | 10 | 140,000 | 7 | 260500301 | 2026-05-11 | 63 | 2026-05-07 | Late | Lokal | IDR | KERAMIKA JAYA INDOTALI PT. | S0134 | CLOSED | CLOSED | 2026-03-05 | Gita | PCS | 1,400,000 | 0 | Net 30 | PRODUKSI , PRINTER BOX, PACKING 1A & 1B |
| 260300008 | 2026-03-02 | PERSEDIAAN UMUM | 6020.0801 | STOP KONTAK 5 LUBANG 6 METER | 260300232 | 220,720.72 | 260300232 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 2 | 220,720.72 | 7 | 260300736 | 2026-03-17 | 8 | 2026-03-23 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-05 | Gita | PCS | 441,441.44 | 0 | Net 30 | OFFICE PRODUKSI PN1 ( MERK BROCO) |
| 260300021 | 2026-03-02 | BAHAN BAKU BODY | 1010.0008 | BATU GAMPING (CA2) | 260500285 | 272 | 260300167 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 170,000 | 252 | 7 | – | – | – | 2026-03-23 | Overdue | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 42,840,000 | 0 | Net 30 | – |
| 260300022 | 2026-03-02 | BAHAN BAKU BODY | 1010.003 | PASIR KUARSA (LASEM) (SELOJOYO) | 260600010 | 144 | 260300166 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 280,000 | 136 | 7 | 260300902 | 2026-03-28 | 19 | 2026-03-23 | Late | Lokal | IDR | SELO JOYO PT. | S0005 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 38,080,000 | 0 | Net 30 | – |
| 260300022 | 2026-03-02 | BAHAN BAKU BODY | 1010.003 | PASIR KUARSA (LASEM) (SELOJOYO) | 260600010 | 144 | 260300166 | 2026-03-09 | 2026-03-16 | 2026-03-16 | 280,000 | 136 | 7 | 260300936 | 2026-03-30 | 21 | 2026-03-23 | Late | Lokal | IDR | SELO JOYO PT. | S0005 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 38,080,000 | 0 | Net 30 | – |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 2026-03-14 | 980,000 | 140 | 7 | 260300503 | 2026-03-12 | 3 | 2026-03-21 | On time | Lokal | IDR | CV. HM JAYA PERKASA | S0545 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 137,200,000 | 0 | Net 60 | – |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 2026-03-14 | 980,000 | 140 | 7 | 260300379 | 2026-03-10 | 1 | 2026-03-21 | On time | Lokal | IDR | CV. HM JAYA PERKASA | S0545 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 137,200,000 | 0 | Net 60 | – |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 2026-03-14 | 980,000 | 140 | 7 | 260300382 | 2026-03-10 | 1 | 2026-03-21 | On time | Lokal | IDR | CV. HM JAYA PERKASA | S0545 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 137,200,000 | 0 | Net 60 | – |
| 260300023 | 2026-03-02 | BAHAN BAKU BODY | 1010.0005 | PASIR KUARSA (LASEM) (HM JAYA) | 260600009 | 147 | 260300163 | 2026-03-09 | 2026-03-14 | 2026-03-14 | 980,000 | 140 | 7 | 260300441 | 2026-03-10 | 1 | 2026-03-21 | On time | Lokal | IDR | CV. HM JAYA PERKASA | S0545 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 137,200,000 | 0 | Net 60 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400126 | 2026-04-06 | 28 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400378 | 2026-04-11 | 33 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400672 | 2026-04-20 | 42 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400100 | 2026-04-04 | 26 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400847 | 2026-04-23 | 45 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400224 | 2026-04-08 | 30 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400502 | 2026-04-15 | 37 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400934 | 2026-04-25 | 47 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400411 | 2026-04-13 | 35 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260401004 | 2026-04-28 | 50 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400981 | 2026-04-27 | 49 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400898 | 2026-04-24 | 46 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400197 | 2026-04-08 | 30 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400452 | 2026-04-14 | 36 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400775 | 2026-04-22 | 44 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400640 | 2026-04-17 | 39 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400589 | 2026-04-17 | 39 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400247 | 2026-04-09 | 31 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400307 | 2026-04-10 | 32 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400733 | 2026-04-21 | 43 | 2026-04-17 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300025 | 2026-03-02 | BAHAN BAKU BODY | 1010.004 | PHIROPILIT CB (CALCIUM BUMI MAKMUR) | 260400522 | 220 | 260300540 | 2026-03-09 | 2026-04-10 | 2026-04-10 | 2,000,000 | 220 | 7 | 260400544 | 2026-04-16 | 38 | 2026-04-17 | On time | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-10 | Qhadafy | KG | 440,000,000 | 0 | Net 30 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400848 | 2026-04-23 | 45 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260401003 | 2026-04-28 | 50 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400936 | 2026-04-25 | 47 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400902 | 2026-04-24 | 46 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260401143 | 2026-04-30 | 52 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400777 | 2026-04-22 | 44 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400735 | 2026-04-21 | 43 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260400676 | 2026-04-20 | 42 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260401063 | 2026-04-29 | 51 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300026 | 2026-03-02 | BAHAN BAKU BODY | 1010.0022 | PHIROPILIT (ANUGERAH) | 260600006 | 218 | 260300168 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 1,100,000 | 196 | 7 | 260500019 | 2026-05-02 | 54 | 2026-04-06 | Late | Lokal | IDR | CV. ANUGERAH TAMBANG | S0540 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 215,600,000 | 0 | Net 45 | – |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 2,710,000 | 269 | 7 | 260400933 | 2026-04-25 | 47 | 2026-04-06 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 728,990,000 | 0 | Net 30 | – |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 2,710,000 | 269 | 7 | 260401062 | 2026-04-29 | 51 | 2026-04-06 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 728,990,000 | 0 | Net 30 | – |
| 260300032 | 2026-03-02 | BAHAN BAKU BODY | 1010.0007 | FELDSPAR (RGS-2) | 260500284 | 284 | 260300173 | 2026-03-09 | 2026-03-30 | 2026-03-30 | 2,710,000 | 269 | 7 | 260401007 | 2026-04-28 | 50 | 2026-04-06 | Late | Lokal | IDR | CALSIUM BUMI MAKMUR CV. | S0451 | CLOSED | CLOSED | 2026-03-14 | Qhadafy | KG | 728,990,000 | 0 | Net 30 | – |