Consolidated data
LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)
How the files are consolidated— click to expand
Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.
LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.
PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.
VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR Noⓘ | PR Dateⓘ | Item Groupⓘ | Item Codeⓘ | Itemⓘ | Last POⓘ | Last Priceⓘ | PO Noⓘ | PO Date ▲ⓘ | ETAⓘ | ETA (PO Report)ⓘ | Qtyⓘ | Priceⓘ | PR→POⓘ | GRPO Noⓘ | GRPO Dateⓘ | PO→GRPOⓘ | Deadlineⓘ | Realisasiⓘ | L/Iⓘ | Currencyⓘ | Vendorⓘ | Vendor Codeⓘ | Status PRⓘ | Status POⓘ | Required Dateⓘ | Request Byⓘ | UoMⓘ | Total POⓘ | Outstandingⓘ | TOPⓘ | Remarksⓘ |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260100524 | 2026-02-09 | SPAREPART | 5030.1794 | NOZZLE RETAINER 9666000265 | 260300051 | 1,608,301 | 260300051 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 15 | 1,608,301 | 22 | 260401044 | 2026-04-28 | 56 | 2026-04-27 | Late | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-02-12 | Gita | PCS | 24,124,515 | 0 | Net 60 | PACKING 1A, 1B, & 2A |
| 260100524 | 2026-02-09 | SPAREPART | 5030.0036 | PLATE EJECTOR D=60 LR=30 C8322162992 | 260400505 | 216,295 | 260300051 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 30 | 219,857 | 22 | 260401111 | 2026-04-29 | 57 | 2026-04-27 | Late | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-02-12 | Gita | PCS | 6,595,710 | 0 | Net 60 | PACKING 1A, 1B, & 2A |
| 260100551 | 2026-02-06 | SPAREPART | 5032.1464 | SEAL NO 08 1B0076 FB170X200X15 | 260300060 | 95,000 | 260300060 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 4 | 95,000 | 25 | 260300265 | 2026-03-06 | 3 | 2026-03-24 | On time | Lokal | IDR | ASIAN BERINDO JAYA PT. | S0037 | CLOSED | CLOSED | 2026-02-11 | Gita | PCS | 380,000 | 0 | Net 60 | TTO. UNTUK WHEEL REDUCTION BAGIAN DEPAN LOADER XG 07 MODEL XG955H |
| 260100551 | 2026-02-06 | SPAREPART | 5032.0069 | BEARING 32028 NO 10 33B0015 GB297 - 94 | 260300061 | 1,367,350 | 260300061 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 2 | 1,367,350 | 25 | 260300273 | 2026-03-06 | 3 | 2026-03-24 | On time | Lokal | IDR | ASIAN BERINDO JAYA PT. | S0037 | CLOSED | CLOSED | 2026-02-11 | Gita | PCS | 2,734,700 | 0 | Net 60 | NTN. UNTUK WHEEL REDUCTION BAGIAN DEPAN LOADER XG 07 MODEL XG955H |
| 260100551 | 2026-02-06 | SPAREPART | 5032.1465 | BEARING 32224 NO 11 33B0100 GB / T297 - 1994 | 260300061 | 1,866,300 | 260300061 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 2 | 1,866,300 | 25 | 260300273 | 2026-03-06 | 3 | 2026-03-24 | On time | Lokal | IDR | ASIAN BERINDO JAYA PT. | S0037 | CLOSED | CLOSED | 2026-02-11 | Gita | PCS | 3,732,600 | 0 | Net 60 | NTN. UNTUK WHEEL REDUCTION BAGIAN DEPAN LOADER XG 07 MODEL XG955H |
| 260100605 | 2026-02-12 | PERSEDIAAN UMUM | 6030.1464 | FLANGE COUPLING AS 35 | 260300090 | 525,000 | 260300090 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 10 | 525,000 | 19 | 260500350 | 2026-05-11 | 69 | 2026-03-10 | Late | Lokal | IDR | TRI STAR PERDANA TEKNIK .CV | S0600 | CLOSED | CLOSED | 2026-02-18 | Gita | PCS | 5,250,000 | 0 | Net 30 | UNTUK TANGKI TRANSFER GLAZZE |
| 260100605 | 2026-02-12 | PERSEDIAAN UMUM | 6030.1464 | FLANGE COUPLING AS 35 | 260300090 | 525,000 | 260300090 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 10 | 525,000 | 19 | 260400763 | 2026-04-21 | 49 | 2026-03-10 | Late | Lokal | IDR | TRI STAR PERDANA TEKNIK .CV | S0600 | CLOSED | CLOSED | 2026-02-18 | Gita | PCS | 5,250,000 | 0 | Net 30 | UNTUK TANGKI TRANSFER GLAZZE |
| 260100710 | 2026-02-18 | BAHAN PEMBANTU | 2022.0003 | PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR | 260600221 | 350,000 | 260300049 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 100 | 350,000 | 13 | 260300766 | 2026-03-17 | 14 | 2026-03-24 | On time | Lokal | IDR | GREEN SPAN PACKAGING SYSTEM PT. | S0119 | CLOSED | CLOSED | 2026-03-02 | Qhadafy | ROLL | 35,000,000 | 0 | Net 60 | – |
| 260100717 | 2026-02-19 | SPAREPART | 5030.1557 | TIMING BELT TRANSPORT DICO 9143981831 | 260300052 | 1,859,225 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 5 | 1,859,225 | 12 | 260401113 | 2026-04-29 | 57 | 2026-04-27 | Late | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-05-20 | Gita | PCS | 9,296,125 | 0 | Net 60 | UNTUK PACKING 1C MULTIGECKO |
| 260100717 | 2026-02-19 | SPAREPART | 5030.1551 | TIMING BELT CENTERING GUIDE C9994050003 | 260300052 | 86,031 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 10 | 86,031 | 12 | 260300411 | 2026-03-10 | 7 | 2026-04-27 | On time | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-05-20 | Gita | MTR | 860,310 | 0 | Net 60 | UNTUK PACKING 1C MULTIGECKO |
| 260100717 | 2026-02-19 | SPAREPART | 5030.1797 | ROLLER CONVEYOR EDA 90016389 | 260300052 | 427,765 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 15 | 427,765 | 12 | 260401047 | 2026-04-28 | 56 | 2026-04-27 | Late | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-05-20 | Gita | PCS | 6,416,475 | 0 | Net 60 | UNTUK PACKING 1C |
| 260100717 | 2026-02-19 | SPAREPART | 5030.1675 | TIMING BELT TRANSPORT DIVIDER AND INPUT CONVEYOR 90021906 | 260300052 | 1,187,706 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 10 | 1,187,706 | 12 | 260500698 | 2026-05-21 | 79 | 2026-04-27 | Late | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-05-20 | Gita | PCS | 11,877,060 | 0 | Net 60 | UNTUK PACKING 1C SPEED WRAP |
| 260100721 | 2026-02-19 | SPAREPART | 5026.0179 | RACLA CON TAGLI H=27.5 L=201 SP=2 IN VITON 80057444 | 260300052 | 394,309 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 5 | 394,309 | 12 | 260301003 | 2026-03-31 | 28 | 2026-04-27 | On time | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-02-21 | Gita | PCS | 1,971,545 | 0 | Net 60 | KARET ASPIRATION DIGITAL 1C |
| 260100734 | 2026-02-19 | SPAREPART | 5021.0319 | V. BELT C 9140299917 20X12.5X16160 | 260300052 | 4,827,294 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 10 | 4,827,294 | 12 | – | – | – | 2026-04-27 | Overdue | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-04-23 | Gita | PCS | 48,272,940 | 0 | Net 60 | PACKING SYSTEM 1A &1B |
| 260100734 | 2026-02-19 | SPAREPART | 5021.0319 | V. BELT C 9140299917 20X12.5X16160 | 260300052 | 4,827,294 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 10 | 4,827,294 | 12 | 260400612 | 2026-04-17 | 45 | 2026-04-27 | On time | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-04-23 | Gita | PCS | 48,272,940 | 0 | Net 60 | PACKING SYSTEM 1A &1B |
| 260100734 | 2026-02-19 | SPAREPART | 5021.0319 | V. BELT C 9140299917 20X12.5X16160 | 260300052 | 4,827,294 | 260300052 | 2026-03-03 | 2026-04-20 | 2026-04-20 | 10 | 4,827,294 | 12 | 260500110 | 2026-05-05 | 63 | 2026-04-27 | Late | Lokal | IDR | SYSTEM INDONESIA PT. | S0367 | CLOSED | CLOSED | 2026-04-23 | Gita | PCS | 48,272,940 | 0 | Net 60 | PACKING SYSTEM 1A &1B |
| 260100745 | 2026-02-20 | PERSEDIAAN UMUM | 6030.004 | PIPA GALVANIS 3" 3 INCH | 260300209 | 971,171.17 | 260300070 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 20 | 971,171.17 | 11 | 260300724 | 2026-03-17 | 14 | 2026-03-10 | Late | Lokal | IDR | RANGKA RAYA PT. | S0450 | CLOSED | CLOSED | 2026-02-25 | Gita | BTG | 19,423,423.42 | 0 | Net 14 | LAMPU PJU GUDANG 92 & GUDANG 93 |
| 260100745 | 2026-02-20 | PERSEDIAAN UMUM | 6030.0167 | PIPA GALVANIS MEDIUM SNI 2 INCH | 260300096 | 629,729.73 | 260300070 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 20 | 586,936.94 | 11 | 260300724 | 2026-03-17 | 14 | 2026-03-10 | Late | Lokal | IDR | RANGKA RAYA PT. | S0450 | CLOSED | CLOSED | 2026-02-25 | Gita | BTG | 11,738,738.8 | 0 | Net 14 | LAMPU PJU GUDANG 92 & GUDANG 93 |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.262 | PIPA GALVANIS 3 INCH | 260600192 | 1,036,036.04 | 260300070 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 5 | 971,171.17 | 11 | 260300724 | 2026-03-17 | 14 | 2026-03-10 | Late | Lokal | IDR | RANGKA RAYA PT. | S0450 | OPEN | CLOSED | 2026-02-25 | Gita | BTG | 4,855,855.86 | 0 | Net 14 | KOMPRESOR BARU PN1 / GUDANG 92 |
| 260100755 | 2026-02-20 | PERSEDIAAN UMUM | 6030.2734 | PIPA STAINLESS 1 1/4 INCH | 260300087 | 723,423.42 | 260300087 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 1 | 723,423.42 | 11 | 260300760 | 2026-03-17 | 14 | 2026-03-10 | Late | Lokal | IDR | SUTINDO RAYA MULIA PT. | S0403 | OPEN | CLOSED | 2026-02-25 | Gita | BTG | 723,423.42 | 0 | - Cash Basic - | KOMPRESOR BARU PN1 / GUDANG 92 |
| 260100818 | 2026-02-24 | PERSEDIAAN UMUM | 6060.0681 | BAUT BAJA M 30X100 | 260300065 | 41,700 | 260300065 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 40 | 41,700 | 7 | 260300356 | 2026-03-09 | 6 | 2026-03-24 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 1,668,000 | 0 | Net 30 | BALLMILL 40 TON NO 14 & 18 |
| 260100822 | 2026-02-24 | PERSEDIAAN UMUM | 6050.0588 | BODY HARNESS | 260300062 | 350,000 | 260300062 | 2026-03-03 | 2026-03-13 | 2026-03-13 | 2 | 350,000 | 7 | 260300212 | 2026-03-05 | 2 | 2026-03-20 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 700,000 | 0 | Net 60 | TEKNISI SIPIL ( UMUM ) |
| 260100828 | 2026-02-24 | SPAREPART | 5028.0209 | PULLY C AS 35 | 260300071 | 179,300 | 260300071 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 8 | 179,300 | 7 | – | – | – | 2026-03-10 | Overdue | Lokal | IDR | TALI AGUNG PT. | S0153 | CLOSED | OPEN | 2026-03-02 | Gita | PCS | 1,434,400 | 8 | Net 30 | UP DOWN ENTRY KILN MEJA TRIPLE SONIC (4") |
| 260100828 | 2026-02-24 | SPAREPART | 5028.0208 | PULLY B1 ID 35 | 260300071 | 194,200 | 260300071 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 360 | 194,200 | 7 | – | – | – | 2026-03-10 | Overdue | Lokal | IDR | TALI AGUNG PT. | S0153 | CLOSED | OPEN | 2026-03-02 | Gita | PCS | 69,912,000 | 360 | Net 30 | MODIFIKASI GLAZING LINE PN 2C (6") |
| 260100828 | 2026-02-24 | SPAREPART | 5027.0467 | AS ST41 35MM @6M | 260300089 | 554,054.05 | 260300089 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 10 | 554,054.05 | 7 | 260300723 | 2026-03-17 | 14 | 2026-03-10 | Late | Lokal | IDR | BENTENG ANUGERAH SEJAHTERA PT. | S0203 | CLOSED | CLOSED | 2026-03-02 | Gita | BTG | 5,540,540.54 | 0 | Net 30 | MODIFIKASI GLAZING LINE PN 2C |
| 260100843 | 2026-02-24 | BAHAN BAKAR | 4010.0001 | SOLAR | 260600111 | 20,720.72 | 260300046 | 2026-03-03 | 2026-03-05 | 2026-03-05 | 8,000 | 13,513.51 | 7 | 260300228 | 2026-03-06 | 3 | 2026-03-12 | On time | Lokal | IDR | INDOMOBIL PRIMA ENERGI, PT | S0131 | CLOSED | CLOSED | 2026-03-05 | Bagas | LTR | 108,108,112 | 0 | Net 30 | PENGISIAN TANGKI SOLAR B DAN C |
| 260100862 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0311 | AS DRAT M-18 | 260500466 | 35,400 | 260300073 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 2 | 29,500 | 6 | 260300355 | 2026-03-09 | 6 | 2026-03-24 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 59,000 | 0 | Net 30 | STOK WHSP |
| 260100862 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0308 | AS DRAT M-12 | 260500466 | 12,900 | 260300073 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 5 | 10,500 | 6 | 260300355 | 2026-03-09 | 6 | 2026-03-24 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 52,500 | 0 | Net 30 | STOK WHSP |
| 260100862 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0312 | AS DRAT M-20 | 260500466 | 44,600 | 260300073 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 2 | 37,000 | 6 | 260300355 | 2026-03-09 | 6 | 2026-03-24 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 74,000 | 0 | Net 30 | STOK WHSP |
| 260100862 | 2026-02-25 | PERSEDIAAN UMUM | 6060.0307 | AS DRAT M-10 | 260500466 | 8,850 | 260300073 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 5 | 7,300 | 6 | 260300355 | 2026-03-09 | 6 | 2026-03-24 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 36,500 | 0 | Net 30 | STOK WHSP |
| 260100862 | 2026-02-25 | PERSEDIAAN UMUM | 6060.031 | AS DRAT M-16 | 260500466 | 24,200 | 260300073 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 3 | 19,600 | 6 | 260300355 | 2026-03-09 | 6 | 2026-03-24 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 58,800 | 0 | Net 30 | STOK WHSP |
| 260100866 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0033 | KAWAT LAS RB 26 3.2 MM | 260500217 | 29,729.73 | 260300074 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 20 | 29,729.73 | 6 | 260300278 | 2026-03-06 | 3 | 2026-03-24 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | KG | 594,594.6 | 0 | Net 30 | STOK WHSP |
| 260100866 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0166 | KAWAT LAS RB 26 2.6 MM | 260600013 | 33,333.33 | 260300074 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 20 | 31,531.53 | 6 | 260300278 | 2026-03-06 | 3 | 2026-03-24 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | KG | 630,630.64 | 0 | Net 30 | STOK WHSP |
| 260100867 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0645 | KERTAS GOSOK NO 1000 | 260300136 | 4,054.05 | 260300136 | 2026-03-03 | 2026-03-16 | 2026-03-16 | 15 | 4,054.05 | 6 | 260300447 | 2026-03-11 | 8 | 2026-03-23 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 60,810.81 | 0 | Net 30 | STOK WHSP |
| 260100867 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0618 | KERTAS GOSOK NO 500 | 260500006 | 4,954.96 | 260300136 | 2026-03-03 | 2026-03-16 | 2026-03-16 | 15 | 4,054.05 | 6 | 260300447 | 2026-03-11 | 8 | 2026-03-23 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 60,810.81 | 0 | Net 30 | STOK WHSP |
| 260100867 | 2026-02-25 | PERSEDIAAN UMUM | 6030.0617 | KERTAS GOSOK NO 3 | 260500492 | 4,729.73 | 260300136 | 2026-03-03 | 2026-03-16 | 2026-03-16 | 15 | 4,504.51 | 6 | 260300447 | 2026-03-11 | 8 | 2026-03-23 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 67,567.58 | 0 | Net 30 | STOK WHSP |
| 260100868 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0044 | TERMINAL KABEL 10 MM | 260500386 | 72,072.07 | 260300137 | 2026-03-03 | 2026-03-16 | 2026-03-16 | 10 | 72,072.07 | 6 | 260300470 | 2026-03-11 | 8 | 2026-03-23 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 720,720.72 | 0 | Net 30 | STOK WHSP |
| 260100868 | 2026-02-25 | PERSEDIAAN UMUM | 6020.0042 | TERMINAL KABEL 6 MM | 260500386 | 58,558.56 | 260300137 | 2026-03-03 | 2026-03-16 | 2026-03-16 | 10 | 58,558.56 | 6 | 260300470 | 2026-03-11 | 8 | 2026-03-23 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-03 | Gita | PCS | 585,585.59 | 0 | Net 30 | STOK WHSP |
| 260100902 | 2026-02-26 | PERSEDIAAN UMUM | 6060.0672 | BAUT DRILLING M 8X25 MM | 260500423 | 242.79 | 260300069 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 5,000 | 221.261 | 5 | 260300448 | 2026-03-11 | 8 | 2026-03-10 | Late | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-05 | Gita | PCS | 1,106,305 | 0 | Net 30 | ISOLASI DUCTING PN 2B |
| 260100902 | 2026-02-26 | PERSEDIAAN UMUM | 6030.07 | METERAN 7.5 MTR | 260510157 | 59,460 | 260300094 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 10 | 66,000 | 5 | 260300354 | 2026-03-09 | 6 | 2026-03-10 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-05 | Gita | PCS | 660,000 | 0 | Net 30 | ISOLASI DUCTING PN 2B(Tekiro) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0072 | BOX KAISAR HIJAU TS 30*30 KW 2 | 260300045 | 1,076 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 14,700 | 1,076 | 5 | 260300846 | 2026-03-25 | 22 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 15,817,200 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (10500) - 12/03 (4200) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0048 | BOX KOBIN HITAM T.S KW 3 30X30 | 260500382 | 1,177 | 260300044 | 2026-03-03 | 2026-03-18 | 2026-03-18 | 2,100 | 1,032 | 5 | 260300464 | 2026-03-11 | 8 | 2026-03-25 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-26 | Qhadafy | PCS | 2,167,200 | 0 | Net 60 | Schedule Kedatangan: - 10/03 (2100) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0072 | BOX KAISAR HIJAU TS 30*30 KW 2 | 260300045 | 1,076 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 14,700 | 1,076 | 5 | 260300964 | 2026-03-30 | 27 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 15,817,200 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (10500) - 12/03 (4200) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0139 | BOX PARIS HIJAU TS 30*30 KW 2 | 260500098 | 905 | 260300044 | 2026-03-03 | 2026-03-18 | 2026-03-18 | 12,600 | 1,032 | 5 | 260300803 | 2026-03-18 | 15 | 2026-03-25 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-26 | Qhadafy | PCS | 13,003,200 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (6300) - 14/03 (6300) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0138 | BOX JUPITER HIJAU TS 30*30 KW 2 | 260500382 | 1,177 | 260300044 | 2026-03-03 | 2026-03-18 | 2026-03-18 | 4,200 | 1,032 | 5 | 260300803 | 2026-03-18 | 15 | 2026-03-25 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-26 | Qhadafy | PCS | 4,334,400 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (4200) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0046 | BOX KAISAR T.S KW 1 30X30 | 260300045 | 1,076 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 65,100 | 1,076 | 5 | 260300846 | 2026-03-25 | 22 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 70,047,600 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (29400) - 12/03 (29400) - 14/03 (6300) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0046 | BOX KAISAR T.S KW 1 30X30 | 260300045 | 1,076 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 65,100 | 1,076 | 5 | 260300964 | 2026-03-30 | 27 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 70,047,600 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (29400) - 12/03 (29400) - 14/03 (6300) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0046 | BOX KAISAR T.S KW 1 30X30 | 260300045 | 1,076 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 65,100 | 1,076 | 5 | 260300805 | 2026-03-18 | 15 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 70,047,600 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (29400) - 12/03 (29400) - 14/03 (6300) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0045 | BOX PARIS T.S KW 1 30X30 | 260500382 | 1,177 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 65,100 | 1,076 | 5 | 260400749 | 2026-04-21 | 49 | 2026-04-10 | Late | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 70,047,600 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (21000) - 14/03 (35700) - 30/03 (8400) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0045 | BOX PARIS T.S KW 1 30X30 | 260500382 | 1,177 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 65,100 | 1,076 | 5 | 260300883 | 2026-03-27 | 24 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 70,047,600 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (21000) - 14/03 (35700) - 30/03 (8400) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0045 | BOX PARIS T.S KW 1 30X30 | 260500382 | 1,177 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 65,100 | 1,076 | 5 | 260300805 | 2026-03-18 | 15 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 70,047,600 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (21000) - 14/03 (35700) - 30/03 (8400) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0045 | BOX PARIS T.S KW 1 30X30 | 260500382 | 1,177 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 65,100 | 1,076 | 5 | 260300846 | 2026-03-25 | 22 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 70,047,600 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (21000) - 14/03 (35700) - 30/03 (8400) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0076 | BOX JUPITER 30*30 PHIL | 260300044 | 1,032 | 260300044 | 2026-03-03 | 2026-03-18 | 2026-03-18 | 29,400 | 1,032 | 5 | 260300612 | 2026-03-14 | 11 | 2026-03-25 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-26 | Qhadafy | PCS | 30,340,800 | 0 | Net 60 | Schedule Kedatangan: - 10/03 (10500) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0044 | BOX JUPITER T.S KW 1 30X30 | 260500382 | 1,177 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 71,400 | 1,076 | 5 | 260300846 | 2026-03-25 | 22 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 76,826,400 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (29400) - 12/03 (21000) - 13/03 (21000) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0044 | BOX JUPITER T.S KW 1 30X30 | 260500382 | 1,177 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 71,400 | 1,076 | 5 | 260300883 | 2026-03-27 | 24 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 76,826,400 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (29400) - 12/03 (21000) - 13/03 (21000) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0044 | BOX JUPITER T.S KW 1 30X30 | 260500382 | 1,177 | 260300045 | 2026-03-03 | 2026-04-03 | 2026-04-03 | 71,400 | 1,076 | 5 | 260300964 | 2026-03-30 | 27 | 2026-04-10 | On time | Lokal | IDR | SURABAYA MEKABOX PT. | S0123 | CLOSED | CLOSED | 2026-02-26 | Qhadafy | PCS | 76,826,400 | 0 | Net 60 | Schedule Kedatangan: - 12/03 (29400) - 12/03 (21000) - 13/03 (21000) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0075 | BOX KOBIN 30*30 PHIL | 260300044 | 1,032 | 260300044 | 2026-03-03 | 2026-03-18 | 2026-03-18 | 35,700 | 1,032 | 5 | 260300803 | 2026-03-18 | 15 | 2026-03-25 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-26 | Qhadafy | PCS | 36,842,400 | 18,900 | Net 60 | Schedule Kedatangan: - 12/03 (16800) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0043 | BOX KOBIN T.S KW 1 30X30 | 260400400 | 1,177 | 260300044 | 2026-03-03 | 2026-03-18 | 2026-03-18 | 48,300 | 1,032 | 5 | 260300612 | 2026-03-14 | 11 | 2026-03-25 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-26 | Qhadafy | PCS | 49,845,600 | 0 | Net 60 | Schedule Kedatangan: - 10/03 (29400) - 13/03 (18900) |
| 260100904 | 2026-02-26 | BAHAN PACKING | 3011.0043 | BOX KOBIN T.S KW 1 30X30 | 260400400 | 1,177 | 260300044 | 2026-03-03 | 2026-03-18 | 2026-03-18 | 48,300 | 1,032 | 5 | 260300464 | 2026-03-11 | 8 | 2026-03-25 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-26 | Qhadafy | PCS | 49,845,600 | 0 | Net 60 | Schedule Kedatangan: - 10/03 (29400) - 13/03 (18900) |
| 260100908 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0048 | SPON 10CM | 260300059 | 575,000 | 260300059 | 2026-03-03 | 2026-03-12 | 2026-03-12 | 2 | 575,000 | 3 | 260300401 | 2026-03-10 | 7 | 2026-03-19 | On time | Lokal | IDR | SUMBER UNTUNG TOKO | S0220 | CLOSED | CLOSED | 2026-03-04 | Gita | PCS | 1,150,000 | 0 | Net 1 | GLAZING LINE 1C |
| 260100909 | 2026-02-28 | SPAREPART | 5011.0279 | BEARING UCP 206 | 260400546 | 120,300 | 260300063 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 4 | 126,000 | 3 | 260300526 | 2026-03-12 | 9 | 2026-03-24 | On time | Lokal | IDR | CENTURY BEARINDO PT. (PPN) | S0043 | CLOSED | CLOSED | 2026-03-04 | Gita | PCS | 504,000 | 0 | Net 60 | ALAT SHAKING INK. FYH |
| 260100911 | 2026-02-28 | PERSEDIAAN UMUM | 6060.031 | AS DRAT M-16 | 260500466 | 24,200 | 260300056 | 2026-03-03 | 2026-03-13 | 2026-03-13 | 2 | 19,600 | 3 | 260300357 | 2026-03-09 | 6 | 2026-03-20 | On time | Lokal | IDR | AGUNG JAYA BAUT | S0196 | CLOSED | CLOSED | 2026-03-04 | Gita | PCS | 39,200 | 0 | Net 30 | STOPPER OUT KILN |
| 260100912 | 2026-02-28 | SPAREPART | 5032.0059 | TIE ROD M-16 | 260300058 | 75,000 | 260300058 | 2026-03-03 | 2026-03-13 | 2026-03-13 | 4 | 75,000 | 3 | 260500433 | 2026-05-13 | 71 | 2026-03-20 | Late | Lokal | IDR | TUNAS BARUTAMA CV. | S0066 | CLOSED | CLOSED | 2026-03-04 | Gita | PCS | 300,000 | 0 | Net 30 | STOPPER OUT KILN |
| 260100915 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0243 | ACCU / BATTERAY N-120 | 260300048 | 2,230,000 | 260300048 | 2026-03-03 | 2026-03-13 | 2026-03-13 | 4 | 2,230,000 | 3 | 260300349 | 2026-03-09 | 6 | 2026-03-20 | On time | Lokal | IDR | SINAR BERLIAN GEMILANG PT. | S0402 | CLOSED | CLOSED | 2026-03-04 | Gita | PCS | 8,920,000 | 0 | Net 30 | GENSET NO 3 PN2. GS |
| 260100915 | 2026-02-28 | PERSEDIAAN UMUM | 6020.008 | KABEL SCUN 70 MM | 260510224 | 3,000 | 260300057 | 2026-03-03 | 2026-03-13 | 2026-03-13 | 8 | 9,750 | 3 | 260300257 | 2026-03-06 | 3 | 2026-03-20 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2026-03-04 | Gita | PCS | 78,000 | 0 | Net 30 | GENSET NO 3 PN2 |
| 260100922 | 2026-02-28 | PERSEDIAAN UMUM | 6030.2265 | WOVEN GRAMASI 6X100M | 260300040 | 3,900,000 | 260300040 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 1 | 3,900,000 | 3 | 260300262 | 2026-03-06 | 3 | 2026-03-10 | On time | Lokal | IDR | KENCANA TIARA GEMILANG .PT | S0628 | CLOSED | CLOSED | 2026-03-04 | Gita | ROLL | 3,900,000 | 0 | - Cash Basic - | WOVEN GUDANG TANAH |
| 260100923 | 2026-02-28 | PERSEDIAAN UMUM | 6050.0034 | LPG 50 KG | 260600299 | 1,365,000 | 260300055 | 2026-03-03 | 2026-03-10 | 2026-03-10 | 2 | 1,000,000 | 3 | 260300253 | 2026-03-06 | 3 | 2026-03-17 | On time | Lokal | IDR | UD. MIRA MAKMUR | S0174 | CLOSED | CLOSED | 2026-03-02 | Gita | TBG | 2,000,000 | 0 | Net 60 | MASAK AIR KARYAWAN |
| 260100926 | 2026-02-28 | BAHAN BAKAR | 4040.0002 | MEDITRAN S40 SAE 40 | 260600220 | 37,070.56 | 260300047 | 2026-03-03 | 2026-03-11 | 2026-03-11 | 418 | 27,655.5 | 3 | 260300244 | 2026-03-06 | 3 | 2026-03-18 | On time | Lokal | IDR | MAIZA LUBRIKA PT. | S0126 | CLOSED | CLOSED | 2026-03-06 | Gita | LTR | 11,559,999 | 0 | Net 60 | GENSET PN2 |
| 260110087 | 2026-02-06 | BAHAN PEMBANTU | 20AB.0019 | ALUMINA BALL 75% SIZE 60 MM | 260610041 | 2.94 | 260310019 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 100,000 | 0.415 | 25 | 260410391 | 2026-04-21 | 49 | 2026-03-10 | Late | Impor | USD | SHANDONG VICTOR ADVANCED MATERIAL TECHNOLOGY CO., LTD. | S0583 | CLOSED | CLOSED | 2026-02-13 | Ibnu Darmawan | KG | 699,192,000 | 0 | Net 30 | REFF : 20/PROD-PK2/II/2026 KEBUTUHAN BALL MILL ATAS PERMINTAAN MR.LIU |
| 260110113 | 2026-02-16 | PERSEDIAAN UMUM | 6030.2656 | BENANG NILON LEVEL | 260510131 | 4,505 | 260310018 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 10 | 4,480 | 15 | 260310210 | 2026-03-12 | 9 | 2026-03-10 | Late | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | CLOSED | CLOSED | 2026-02-23 | Ibnu Darmawan | PCS | 44,800 | 0 | COD | REFF : 033/MRS/ENG/I/2026 KEBUTUHAN DUCTING KILN ATAS PERMINTAAN ADITYA |
| 260110113 | 2026-02-16 | PERSEDIAAN UMUM | 6050.125 | WEBBING SLING BELT 5 TON X 6 METER DOUBLE PLY | 260310017 | 366,733.34 | 260310017 | 2026-03-03 | 2026-03-17 | 2026-03-17 | 3 | 366,733.34 | 15 | 260410221 | 2026-04-14 | 42 | 2026-03-24 | Late | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | CLOSED | CLOSED | 2026-02-23 | Ibnu Darmawan | PCS | 1,100,200.02 | 0 | COD | REFF : 033/MRS/ENG/I/2026 KEBUTUHAN DUCTING KILN ATAS PERMINTAAN ADITYA |
| 260110114 | 2026-02-16 | PERSEDIAAN UMUM | 6020.0786 | VARISTOR 32D431K | 260310082 | 27,100 | 260310020 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 20 | 27,100 | 15 | – | – | – | 2026-03-10 | Overdue | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | OPEN | OPEN | 2026-02-23 | Ibnu Darmawan | PCS | 542,000 | 20 | COD | REFF : 043/MRS/ENG/II/2026 KEBUTUHAN SERVICE TOOLS PK2 ATAS PERMINTAAN ADITYA, REPEAT PO 260110352 |
| 260110130 | 2026-02-26 | PERSEDIAAN UMUM | 6050.0999 | GANTUNGAN SAPU | 260310015 | 121,709 | 260310015 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 1 | 121,709 | 5 | 260310112 | 2026-03-06 | 3 | 2026-03-10 | On time | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | OPEN | CLOSED | 2026-03-05 | Ibnu Darmawan | PCS | 121,709 | 0 | COD | REFF : 04/PP/FG/II/2026 KEBUTUHAN FG PK02 ATAS PERMINTAAN PRADITYA ADIWORO |
| 260110130 | 2026-02-26 | PERSEDIAAN UMUM | 6030.2634 | PALU BESI 16OZ | 260310016 | 57,710 | 260310016 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 1 | 57,710 | 5 | 260310106 | 2026-03-06 | 3 | 2026-03-10 | On time | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | OPEN | CLOSED | 2026-03-05 | Ibnu Darmawan | PCS | 57,710 | 0 | COD | REFF : 04/PP/FG/II/2026 KEBUTUHAN FG PK02 ATAS PERMINTAAN PRADITYA ADIWORO |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6050.0872 | REFIL KUAS ROLL 4 INCH | 260510155 | 1,137 | 260310025 | 2026-03-03 | 2026-03-12 | 2026-03-12 | 20 | 975 | 5 | 260310212 | 2026-03-12 | 9 | 2026-03-19 | On time | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | OPEN | CLOSED | 2026-03-05 | Ibnu Darmawan | PCS | 19,500 | 0 | CBD | REFF : 055/MRS/ENG/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN BPK CHUNGKING, PAYMENT MENGGUNAKAN PETTY CASH |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.0486 | MATA GERINDA POLISH 4 INCH | 260510030 | 7,500 | 260310023 | 2026-03-03 | 2026-03-12 | 2026-03-12 | 150 | 7,500 | 5 | 260310266 | 2026-03-14 | 11 | 2026-03-19 | On time | Lokal | IDR | DUTA TEKNIK. CV | S0797 | OPEN | CLOSED | 2026-03-05 | Ibnu Darmawan | PCS | 1,125,000 | 0 | Net 45 | REFF : 055/MRS/ENG/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN BPK CHUNGKING, RE-ORDER NO PO # 260110301 |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6030.1791 | WD CUTTING 4 INCH | 260610042 | 3,300 | 260310023 | 2026-03-03 | 2026-03-12 | 2026-03-12 | 800 | 3,000 | 5 | 260310266 | 2026-03-14 | 11 | 2026-03-19 | On time | Lokal | IDR | DUTA TEKNIK. CV | S0797 | OPEN | CLOSED | 2026-03-05 | Ibnu Darmawan | PCS | 2,400,000 | 0 | Net 45 | REFF : 055/MRS/ENG/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN BPK CHUNGKING, RE-ORDER NO PO # 260110300 |
| 260110134 | 2026-02-26 | PERSEDIAAN UMUM | 6050.0042 | KUAS ROLL KECIL | 260500300 | 14,881.08 | 260310024 | 2026-03-03 | 2026-03-12 | 2026-03-12 | 5 | 10,670 | 5 | 260310213 | 2026-03-12 | 9 | 2026-03-19 | On time | Lokal | IDR | SHOPEE INTERNATIONAL INDONESIA. PT | S1043 | OPEN | CLOSED | 2026-03-05 | Ibnu Darmawan | PCS | 53,350 | 0 | CBD | REFF : 055/MRS/ENG/II/2026 KEBUTUHAN PRESS ATAS PERMINTAAN BPK CHUNGKING, PAYMENT MENGGUNAKAN PETTY CASH |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260310347 | 2026-03-26 | 23 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260310346 | 2026-03-26 | 23 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260310345 | 2026-03-26 | 23 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260310347 | 2026-03-26 | 23 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260310398 | 2026-03-31 | 28 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260410006 | 2026-04-02 | 30 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260310399 | 2026-03-31 | 28 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260410267 | 2026-04-15 | 43 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260310281 | 2026-03-16 | 13 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260310346 | 2026-03-26 | 23 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260310345 | 2026-03-26 | 23 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0206 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP2 KWA 605X38 (WK150/125/150) | 260610105 | 659 | 260310022 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 659 | 3 | 260310281 | 2026-03-16 | 13 | 2026-03-10 | Late | Lokal | IDR | MULIAPRIMA PACKINDO,PT | S0940 | CLOSED | CLOSED | 2026-03-25 | Aulia Safitri | PCS | 110,712,000 | 0 | Net 30 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260310398 | 2026-03-31 | 28 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260410006 | 2026-04-02 | 30 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260310399 | 2026-03-31 | 28 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260110135 | 2026-02-28 | BAHAN PACKING | 3011.0205 | CARTON BOX SIDEWRAPS KOBIN 60X60 GP MP1 KWA 605X40 (WK150/125/150) | 260610105 | 696 | 260310021 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 168,000 | 696 | 3 | 260410267 | 2026-04-15 | 43 | 2026-03-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-03-25 | Aulia Safitri | PCS | 116,928,000 | 42,000 | Net 60 | PERSIAPAN PRODUKSI APRIL 26 |
| 260300012 | 2026-03-02 | PERSEDIAAN UMUM | 6030.2736 | KAWAT LAS MIG Ø 1.2 MM | 260300069 | 24,324.32 | 260300069 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 330 | 24,324.32 | 1 | 260300275 | 2026-03-06 | 3 | 2026-03-10 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-07 | Gita | KG | 8,027,025.6 | 0 | Net 30 | UNTUK AREA WWTP |
| 260300012 | 2026-03-02 | PERSEDIAAN UMUM | 6030.2736 | KAWAT LAS MIG Ø 1.2 MM | 260300069 | 24,324.32 | 260300069 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 330 | 24,324.32 | 1 | 260300452 | 2026-03-11 | 8 | 2026-03-10 | Late | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-07 | Gita | KG | 8,027,025.6 | 0 | Net 30 | UNTUK AREA WWTP |
| 260300012 | 2026-03-02 | PERSEDIAAN UMUM | 6030.2779 | SELANG LAS MIG | 260300091 | 22,522.52 | 260300091 | 2026-03-03 | 2026-03-03 | 2026-03-03 | 50 | 22,522.52 | 1 | 260300454 | 2026-03-11 | 8 | 2026-03-10 | Late | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-07 | Gita | MTR | 1,126,126.15 | 0 | Net 30 | UNTUK AREA WWTP |
| 251200508 | 2025-12-31 | FIXED ASSETS | AST02576 | HP XIAOMI REDMI 15 8/256, SNAPDRAGON 6S GEN 3 (IT) | 260300078 | 2,275,000 | 260300078 | 2026-03-04 | 2026-03-11 | 2026-03-11 | 1 | 2,275,000 | 63 | 260300478 | 2026-03-11 | 7 | 2026-03-18 | On time | Lokal | IDR | SINAR MULIA. CV | S0855 | CLOSED | CLOSED | 2026-01-07 | Nanda Ayu Pratiwi | – | 2,275,000 | 0 | Net 14 | UNTUK PEMBERITAHUAN/ NOTIFIKASI SISTEM MELALUI WHATSAPP (UNTUK IT) |
| 260100211 | 2026-01-17 | FIXED ASSETS | AST02596 | KULKAS IG 2 PINTU-JUMBO | 260300079 | 5,968,468.47 | 260300079 | 2026-03-04 | 2026-03-11 | 2026-03-11 | 1 | 5,968,468.47 | 46 | 260300898 | 2026-03-27 | 23 | 2026-03-18 | Late | Lokal | IDR | MEGAH PERTAMA INDAH, PT. | S1138 | CLOSED | CLOSED | 2026-01-24 | Nanda Ayu Pratiwi | – | 5,968,468.47 | 0 | Net 14 | UNTUK MESS |
| 260100648 | 2026-02-16 | PERSEDIAAN UMUM | 6050.0297 | RODA NYLON 6 INCH (HIDUP) | 260510246 | 81,082 | 260300077 | 2026-03-04 | 2026-03-16 | 2026-03-16 | 2 | 163,963.96 | 16 | 260300451 | 2026-03-11 | 7 | 2026-03-23 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-03-02 | Gita | PCS | 327,927.93 | 0 | Net 30 | STOK WRM. TANPA REM |