KKobin GroupProcurement KPI

Consolidated data

LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)

Export CSV
How the files are consolidated— click to expand

Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.

LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.

PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.

VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).

KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).

On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.

Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.

PR NoPR DateItem GroupItem CodeItemLast POLast PricePO NoPO Date ▲ETAETA (PO Report)QtyPricePR→POGRPO NoGRPO DatePO→GRPODeadlineRealisasiL/ICurrencyVendorVendor CodeStatus PRStatus PORequired DateRequest ByUoMTotal POOutstandingTOPRemarks
2601100512026-01-24PERSEDIAAN UMUM6050.1252ELECTRODE HOLDER STAMVICK - 800A STAMVICK26051013363,0642601102602026-02-042026-02-042026-02-041058,559112601108892026-02-1392026-02-11LateLokalIDRXAJERIKO ABADI SEJAHTERA, PTS1085OPENCLOSED2026-01-31Tika LisnawatiPCS585,5900Net 14REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100632026-01-28SPAREPART5017.1075DUST CAP 6 PIN 2 POSITION2601102567,0002601102562026-02-042026-02-122026-02-12507,00072026-02-19OverdueLokalIDRDUAL JAYA, CV.S0798CLOSEDOPEN2026-02-04Tika LisnawatiPCS350,00050Net 45REFF : KEBUTUHAN ELEKTRIK PROYEK PK02 ATAS PERMINTAAN Mr.XIA
2601100632026-01-28SPAREPART5017.1076DUST CAP 6 PIN 3 POSITION2601102567,0002601102562026-02-042026-02-122026-02-12507,00072026-02-19OverdueLokalIDRDUAL JAYA, CV.S0798CLOSEDOPEN2026-02-04Tika LisnawatiPCS350,00050Net 45REFF : KEBUTUHAN ELEKTRIK PROYEK PK02 ATAS PERMINTAAN Mr.XIA
2601100782026-02-04BAHAN BAKU GLAZE1070.0026INK DP BROWN K 3287 BETO26051007692,550.392601102612026-02-042026-02-042026-02-042,00087,701.72601107082026-02-0732026-02-11On timeLokalIDRSINCOZA JAYA INDONESIA,.PTS0890CLOSEDCLOSED2026-02-06Aulia SafitriKG175,403,3980Net 90PENGGANTI PR 260110061, RMB PRICE : 36,26 (KURS : 2.418,69)
2601100782026-02-04BAHAN BAKU GLAZE1070.0026INK DP BROWN K 3287 BETO26051007692,550.392601102612026-02-042026-02-042026-02-042,00087,701.72601106662026-02-0512026-02-11On timeLokalIDRSINCOZA JAYA INDONESIA,.PTS0890CLOSEDCLOSED2026-02-06Aulia SafitriKG175,403,3980Net 90PENGGANTI PR 260110061, RMB PRICE : 36,26 (KURS : 2.418,69)
2601100782026-02-04BAHAN BAKU GLAZE1070.0028INK DP GREEN K 3801 BETO260110365111,835.982601102612026-02-042026-02-042026-02-0460111,404.862601106662026-02-0512026-02-11On timeLokalIDRSINCOZA JAYA INDONESIA,.PTS0890CLOSEDCLOSED2026-02-06Aulia SafitriKG6,684,291.660Net 90PENGGANTI PR 260110061, RMB PRICE : 46,06 (KURS : 2.418,69)
2601100782026-02-04BAHAN BAKU GLAZE1070.0025INK DP BLUE K 3586 BETO INK260110365211,895.922601102612026-02-042026-02-042026-02-041,000210,958.142601106662026-02-0512026-02-11On timeLokalIDRSINCOZA JAYA INDONESIA,.PTS0890CLOSEDCLOSED2026-02-06Aulia SafitriKG210,958,1420Net 90PENGGANTI PR 260110061, RMB PRICE : 87,22 (KURS : 2.418,69)
2601100782026-02-04BAHAN BAKU GLAZE1070.0025INK DP BLUE K 3586 BETO INK260110365211,895.922601102612026-02-042026-02-042026-02-041,000210,958.142601107082026-02-0732026-02-11On timeLokalIDRSINCOZA JAYA INDONESIA,.PTS0890CLOSEDCLOSED2026-02-06Aulia SafitriKG210,958,1420Net 90PENGGANTI PR 260110061, RMB PRICE : 87,22 (KURS : 2.418,69)
2511004572025-11-29SPAREPART5029.0441GASKET 8HRR0000014226010067285,0002601006722026-02-052026-02-052026-02-05185,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS85,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0432PLATE 8HFH-999-2A-0448260100672750,0002601006722026-02-052026-02-052026-02-051750,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS750,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0445WHEEL (ADSP) 8HFH-999-2A-1406260100672475,0002601006722026-02-052026-02-052026-02-051475,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS475,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0444WHEEL (STD) 8HFH-999-2A-1407260100672475,0002601006722026-02-052026-02-052026-02-051475,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS475,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0443WHEEL (STD) 8HRC010137004260100757450,0002601006722026-02-052026-02-052026-02-051450,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS450,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0442REST 8HRR00000212260100672156,2002601006722026-02-052026-02-052026-02-051156,200682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS156,2001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.044SPACER 8HRR0000014026010067275,0002601006722026-02-052026-02-052026-02-05175,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS75,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0439GASKET 8HFH-999-2A-0582260100672350,0002601006722026-02-052026-02-052026-02-051350,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS350,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0437GUARD 8HFH-999-2A-12272601006721,950,0002601006722026-02-052026-02-052026-02-0511,950,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS1,950,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0436WASHER RK-200-13-0016260100672125,0002601006722026-02-052026-02-052026-02-051125,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS125,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0434CROWN MT-ST-58-00001260100672475,0002601006722026-02-052026-02-052026-02-051475,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS475,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0433PLATE 8HFH-999-2A-1228260100672375,0002601006722026-02-052026-02-052026-02-051375,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS375,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0431GUARD 8HFH-999-2A-0585260100672550,0002601006722026-02-052026-02-052026-02-051550,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS550,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.043CHAIN JOINT 8HRC010200026260100672150,0002601006722026-02-052026-02-052026-02-051150,000682604003902026-04-11652026-02-12LateLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS150,0000Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0429CHAIN 8HRC010200025260100672700,0002601006722026-02-052026-02-052026-02-051700,000682604003902026-04-11652026-02-12LateLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS700,0000Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0428CROWN 8HFH-999-2A-0518260100672550,0002601006722026-02-052026-02-052026-02-051550,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS550,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2511004572025-11-29SPAREPART5029.0438TAB 8HRR0000017326010067265,0002601006722026-02-052026-02-052026-02-05165,000682026-02-12OverdueLokalIDRTRI STAR PERDANA TEKNIK .CVS0600OPENOPEN2026-01-03Nanda Ayu PratiwiPCS65,0001Net 30(IMPORT) UNTUK KILN PN 2B (MODIFIKASI)
2512001482025-12-09PERSEDIAAN UMUM6020.0674KABEL JUMPER MALE 30 CM26010065335,0002601006532026-02-052026-02-052026-02-05135,000582601014082026-02-1052026-02-12On timeLokalIDRSINAR MULIA. CVS0835CLOSEDCLOSED2025-12-15Nanda Ayu PratiwiPACK35,0000Net 14PROJECT MONITORING KUALITAS & HASIL PRODUKSI PN 1A
2512001482025-12-09PERSEDIAAN UMUM6020.0676ORANGE PI ZERO 3 + POWER SUPPLY + CASE2601006771,393,8502601006772026-02-052026-02-052026-02-0511,393,850582601013192026-02-0722026-02-12On timeLokalIDRSHOPEES0166CLOSEDCLOSED2025-12-15Nanda Ayu PratiwiSET1,393,8500- Cash Basic -PROJECT MONITORING KUALITAS & HASIL PRODUKSI PN 1A
2512001482025-12-09PERSEDIAAN UMUM6020.0675KABEL JUMPER FEMALE 30 CM26010065335,0002601006532026-02-052026-02-052026-02-05135,000582601014082026-02-1052026-02-12On timeLokalIDRSINAR MULIA. CVS0835CLOSEDCLOSED2025-12-15Nanda Ayu PratiwiPACK35,0000Net 14PROJECT MONITORING KUALITAS & HASIL PRODUKSI PN 1A
2512004222025-12-26SPAREPART5032.1424HOSE POWER CYLINDER NO. 4507-422601007151,518,3002601007152026-02-052026-03-232026-03-2321,518,300412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS3,036,6000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1461PIN STEERING KNUCKLE KING NO. 4301-42 ( LH )260100715623,7002601007152026-02-052026-03-232026-03-231623,700412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS623,7000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1461PIN STEERING KNUCKLE KING NO. 4301-42 ( LH )260100715623,7002601007152026-02-052026-03-232026-03-231623,700412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS623,7000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1434NUT, WHEEL SET NO. 4403-20B26010071524,7802601007152026-02-052026-03-232026-03-23124,780412603008872026-03-27502026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS24,7800Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1432BOLT, DISC WHEEL SET NO. 4403-20A26010071567,6202601007152026-02-052026-03-232026-03-23167,620412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS67,6200Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1432BOLT, DISC WHEEL SET NO. 4403-20A26010071567,6202601007152026-02-052026-03-232026-03-23167,620412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS67,6200Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1164BEARING, NEEDLE NO 4301-42C260500178195,3002601007152026-02-052026-03-232026-03-232213,150412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS426,3000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1164BEARING, NEEDLE NO 4301-42C260500178195,3002601007152026-02-052026-03-232026-03-232213,150412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS426,3000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1166BEARING, STREERING KNUCKLE THRUST NO 4301-42A260500178266,3502601007152026-02-052026-03-232026-03-231290,850412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS290,8500Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1166BEARING, STREERING KNUCKLE THRUST NO 4301-42A260500178266,3502601007152026-02-052026-03-232026-03-231290,850412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS290,8500Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1431PIN STEERING KNUCKLE KING NO. 4301-42 ( RH )260500178523,2502601007152026-02-052026-03-232026-03-231627,900412603008872026-03-27502026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS627,9000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.143ROLLER LIFT (FOR INNER MAST) NO. 6101-41 OD=119.72601007151,002,1202601007152026-02-052026-03-232026-03-2321,002,120412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,004,2400Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.143ROLLER LIFT (FOR INNER MAST) NO. 6101-41 OD=119.72601007151,002,1202601007152026-02-052026-03-232026-03-2321,002,120412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,004,2400Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1429ROLLER LIFT (FOR OUTER MAST) NO. 6101-402601007151,002,1202601007152026-02-052026-03-232026-03-2321,002,120412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,004,2400Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1429ROLLER LIFT (FOR OUTER MAST) NO. 6101-402601007151,002,1202601007152026-02-052026-03-232026-03-2321,002,120412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,004,2400Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1428ROLLER LIFT (LOWER) NO. 6301-592601007151,248,2402601007152026-02-052026-03-232026-03-2321,248,240412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,496,4800Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1428ROLLER LIFT (LOWER) NO. 6301-592601007151,248,2402601007152026-02-052026-03-232026-03-2321,248,240412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,496,4800Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1427ROLLER LIFT (UPPER) NO. 6301-582601007151,260,0002601007152026-02-052026-03-232026-03-2321,260,000412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,520,0000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1427ROLLER LIFT (UPPER) NO. 6301-582601007151,260,0002601007152026-02-052026-03-232026-03-2321,260,000412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,520,0000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1426ROLLER LIFT (CENTER) NO. 6301-412601007151,260,0002601007152026-02-052026-03-232026-03-2321,260,000412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,520,0000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1426ROLLER LIFT (CENTER) NO. 6301-412601007151,260,0002601007152026-02-052026-03-232026-03-2321,260,000412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS2,520,0000Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1425HOSE POWER CYLINDER NO. 4507-432601007151,636,1922601007152026-02-052026-03-232026-03-2321,636,192412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS3,272,3840Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1425HOSE POWER CYLINDER NO. 4507-432601007151,636,1922601007152026-02-052026-03-232026-03-2321,636,192412026-03-30OverdueLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS3,272,3840Net 30UNTUK SPARE FL TOYOTA 01
2512004222025-12-26SPAREPART5032.1424HOSE POWER CYLINDER NO. 4507-422601007151,518,3002601007152026-02-052026-03-232026-03-2321,518,300412603001562026-03-04272026-03-30On timeLokalIDRTRAKTOR NUSANTARA PT.S0376CLOSEDCLOSED2025-12-31Nanda Ayu PratiwiPCS3,036,6000Net 30UNTUK SPARE FL TOYOTA 01
2601001642026-01-13PERSEDIAAN UMUM6020.0764NAIL GUN TEKIRO CORDLES XTRA VOLT 202601006751,800,0002601006752026-02-052026-02-052026-02-0561,800,000232603008082026-03-18412026-02-12LateLokalIDRSUMBER ABADI CVS0665CLOSEDOPEN2026-01-19Nanda Ayu PratiwiUNIT10,800,0001Net 30UNTUK MENCEGAH KOMPLAIN KIRIMAN MIRING
2601001642026-01-13PERSEDIAAN UMUM6020.0764NAIL GUN TEKIRO CORDLES XTRA VOLT 202601006751,800,0002601006752026-02-052026-02-052026-02-0561,800,000232603005872026-03-13362026-02-12LateLokalIDRSUMBER ABADI CVS0665CLOSEDOPEN2026-01-19Nanda Ayu PratiwiUNIT10,800,0001Net 30UNTUK MENCEGAH KOMPLAIN KIRIMAN MIRING
2601002952026-01-19PERSEDIAAN UMUM6030.2455BATU PECAH 1X1 CM260100673266,666.672601006732026-02-052026-02-052026-02-051.5266,666.67172601013332026-02-0722026-02-12On timeLokalIDRUD. MIRA MAKMURS0174CLOSEDCLOSED2026-01-22Nanda Ayu Pratiwi400,0000Net 60UNTUK GLAZZING LINE PN2
2601003092026-01-23FIXED ASSETSAST02619DISPLAY TFT BERJALAN 20X40 CM2601006621,800,0002601006622026-02-052026-02-122026-02-1221,800,000132026-02-19OverdueLokalIDRTOKOPEDIAS0167CLOSEDCLOSED2026-01-26Gita3,600,0000- Cash Basic -IMPROVEMENT KAIZEN
2601003372026-01-26PERSEDIAAN UMUM6020.0555METERAN LASER DIGITAL260100680440,0002601006802026-02-052026-02-052026-02-052440,000102601015492026-02-1382026-02-12LateLokalIDRCENTRAL NUSA JAYA .PTS0825CLOSEDCLOSED2026-02-02GitaPCS880,0000Net 30UNTUK OPERASIONAL PROJEK (SNDWAY)
2601003402026-01-26SPAREPART5029.0467PULLEGIA RIBASS FISSA 8112111431260400407250,0002601007142026-02-052026-04-052026-04-0510507,001102603010042026-03-31542026-04-12On timeLokalIDRSYSTEM INDONESIA PT.S0367CLOSEDCLOSED2026-01-30GitaPCS5,070,0100Net 60PACKING 1A & 1B
2601003402026-01-26SPAREPART5029.0468PULLEGIA RIBASS FOLLE 8112111330260100714848,1612601007142026-02-052026-04-052026-04-0515848,161102601017112026-02-18132026-04-12On timeLokalIDRSYSTEM INDONESIA PT.S0367CLOSEDCLOSED2026-01-30GitaPCS12,722,4150Net 60PACKING 1A & 1B
2601003482026-01-26SPAREPART5026.0135SOLENOID VALVE SMC 9680040130 || VDW350-5G-3-01F-H-F-X133-Q2601007142,129,8782601007142026-02-052026-04-052026-04-0532,129,878102604011152026-04-29832026-04-12LateLokalIDRSYSTEM INDONESIA PT.S0367CLOSEDCLOSED2026-01-30GitaPCS6,389,6340Net 60DIGITAL PRINTING PN1 & PN2
2601003862026-01-29SPAREPART5032.0498BAN DALAM() 23.5 - 25X16260500324900,0002601006612026-02-052026-02-122026-02-122900,00072601013772026-02-0942026-02-19On timeLokalIDRSINAR BERLIAN GEMILANG PT.S0402CLOSEDCLOSED2026-02-05GitaPCS1,800,0000Net 30UNTUK SPARE LOADER XIAGONG 03.05.06.07
2601003952026-01-28PERSEDIAAN UMUM6030.2108BATU PECAH 1-2 CM260100679400,0002601006792026-02-052026-02-052026-02-051400,00082601012972026-02-0612026-02-12On timeLokalIDRUD. MIRA MAKMURS0174CLOSEDCLOSED2026-02-03GitaCOLT400,0000Net 60UNTUK GLAZZING LINE PN2
2601003962026-01-28PERSEDIAAN UMUM6030.2619KLEM U BOLT 3 INCH26010067847,5002601006782026-02-052026-02-052026-02-051047,50082601014582026-02-1162026-02-12On timeLokalIDRCENTRAL NUSA JAYA .PTS0825CLOSEDCLOSED2026-02-03GitaPCS475,0000Net 30UNTUK AYAKAN BMSD
2601003972026-01-28PERSEDIAAN UMUM6060.0481MUR M 302601008234,3752601006712026-02-052026-02-052026-02-055012,50082601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS500,0000Net 30UNTUK CONVEYOR PN2
2601003992026-01-28PERSEDIAAN UMUM6060.0664BAUT M 20X1002601006717,8502601006712026-02-052026-02-052026-02-05407,85082601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS471,0000Net 30UNTUK CONVEYOR PN2
2601004282026-01-31PERSEDIAAN UMUM6060.0671LONG DRAT M 14X1000 MM26010067115,1002601006712026-02-052026-02-052026-02-051515,10052601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS226,5000Net 30UNTUK CONVEYOR PN2
2601004282026-01-31PERSEDIAAN UMUM6060.021MUR M 142605004641,0502601006712026-02-052026-02-052026-02-0518097552601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS175,5000Net 30UNTUK CONVEYOR PN2
2601004282026-01-31PERSEDIAAN UMUM6060.0481MUR M 302601008234,3752601006712026-02-052026-02-052026-02-054012,50052601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS500,0000Net 30UNTUK CONVEYOR PN2
2601004282026-01-31PERSEDIAAN UMUM6060.0664BAUT M 20X1002601006717,8502601006712026-02-052026-02-052026-02-05607,85052601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS471,0000Net 30UNTUK CONVEYOR PN2
2601004282026-01-31PERSEDIAAN UMUM6060.0213MUR M 202601008242,6502601006712026-02-052026-02-052026-02-05602,65552601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS159,3000Net 30UNTUK CONVEYOR PN2
2601004282026-01-31PERSEDIAAN UMUM6060.0669RING PLAT M 202604005311,2102601006712026-02-052026-02-052026-02-051001,21052601013422026-02-0722026-02-12On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2026-02-05GitaPCS121,0000Net 30UNTUK CONVEYOR PN2
2601004292026-01-31SPAREPART5023.1516ACCUMULATOR BLADDER ( 206990305D )260100713602601007132026-02-052026-03-052026-03-0586052605005592026-05-181022026-03-12LateImporUSDLIDE TRADING (HONG KONG) CO., LTD.S0465CLOSEDCLOSED2026-02-05GitaPCS8,052,0000Net 30UNTUK SPAREPART PRESS BARU
2601004292026-01-31SPAREPART5023.1518ACCUMULATOR BLADDER ( 206990302D )260100713132601007132026-02-052026-03-052026-03-0521352605005592026-05-181022026-03-12LateImporUSDLIDE TRADING (HONG KONG) CO., LTD.S0465CLOSEDCLOSED2026-02-05GitaPCS436,1500Net 30UNTUK SPAREPART PRESS BARU
2601004292026-01-31SPAREPART5023.1519ACCUMULATOR BLADDER ( 206990309D )260100713122601007132026-02-052026-03-052026-03-0521252605005592026-05-181022026-03-12LateImporUSDLIDE TRADING (HONG KONG) CO., LTD.S0465CLOSEDCLOSED2026-02-05GitaPCS402,6000Net 30UNTUK SPAREPART PRESS BARU
2601004292026-01-31SPAREPART5023.1517ACCUMULATOR BLADDER ( 206990311D )26010071372601007132026-02-052026-03-052026-03-052752605005592026-05-181022026-03-12LateImporUSDLIDE TRADING (HONG KONG) CO., LTD.S0465CLOSEDCLOSED2026-02-05GitaPCS234,8500Net 30UNTUK SPAREPART PRESS BARU
2601004842026-02-03PERSEDIAAN UMUM6030.0513CAT BESI AVIAN SEA BLUE 75226010068257,472.972601006822026-02-052026-02-212026-02-211057,472.9722601013852026-02-0942026-02-28On timeLokalIDRTIRTAKENCANA TATAWARNA PT.S0404CLOSEDCLOSED2026-02-14GitaKG574,729.730Net 30KILN 1A & 1B
2601004842026-02-03PERSEDIAAN UMUM6030.0487THINER A SPECIAL26040029850,7002601006822026-02-052026-02-212026-02-21536,225.2322601013852026-02-0942026-02-28On timeLokalIDRTIRTAKENCANA TATAWARNA PT.S0404CLOSEDCLOSED2026-02-14GitaLTR181,126.130Net 30KILN 1A & 1B
2601004842026-02-03PERSEDIAAN UMUM6030.0499CAT BESI TAHAN PANAS HITAM260100681220,0002601006812026-02-052026-02-212026-02-2110220,00022601014702026-02-1162026-02-28On timeLokalIDRGAMPANG INGAT UD.S0222CLOSEDCLOSED2026-02-14GitaKG2,200,0000- Cash Basic -KILN 1A & 1B. FUTANLUX BLACK DOFF & 1 KG
2601004842026-02-03PERSEDIAAN UMUM6030.062KUAS 2 INCH2606102169,0102601006822026-02-052026-02-212026-02-2155,541.4422601014252026-02-1052026-02-28On timeLokalIDRTIRTAKENCANA TATAWARNA PT.S0404CLOSEDCLOSED2026-02-14GitaPCS27,707.210Net 30KILN 1A & 1B
2601004882026-02-03PERSEDIAAN UMUM6050.1299PENDORONG AIR26040031640,0002601006832026-02-052026-02-202026-02-20240,00022601015392026-02-1272026-02-27On timeLokalIDRPANORAMAS0184CLOSEDCLOSED2026-02-09GitaPCS80,0000Net 14AREA BONGKARAN PN 1C
2601004882026-02-03PERSEDIAAN UMUM6050.0994SEPATU BOOTS SIZE 41260400358160,0002601006832026-02-052026-02-202026-02-201125,00022601015392026-02-1272026-02-27On timeLokalIDRPANORAMAS0184CLOSEDCLOSED2026-02-09GitaPASANG125,0000Net 14R&D GLAZE PREP PN1
2601004882026-02-03PERSEDIAAN UMUM6050.0996SEPATU BOOTS SIZE 43260100683125,0002601006832026-02-052026-02-202026-02-201125,00022601015392026-02-1272026-02-27On timeLokalIDRPANORAMAS0184CLOSEDCLOSED2026-02-09GitaPASANG125,0000Net 14R&D GLAZE PREP PN1
2601100112026-01-06SPAREPART5013.0009SELANG TUBING ANGIN 8MM2606101953,337.52601102682026-02-052026-02-142026-02-141005,500302601108422026-02-1162026-02-21On timeLokalIDRTARUMA GITA PERSADA PT.S0462OPENCLOSED2026-01-13Tika LisnawatiMETER550,0000Net 45REFF : 003/MRS/ENG/I/2026 KEBUTUHAN PROJECT PK02 B, ATAS PERMINTAAN ADITYA
2601100112026-01-06SPAREPART5013.0011SELANG TUBING ANGIN 14MM26061002912,5002601102692026-02-052026-02-142026-02-141008,540302601108332026-02-1052026-02-21On timeLokalIDRSHOPEE INTERNATIONAL INDONESIA. PTS1043OPENCLOSED2026-01-13Tika LisnawatiMETER854,0000CODREFF : 003/MRS/ENG/I/2026 KEBUTUHAN PROJECT PK02 B, ATAS PERMINTAAN ADITYA
2601100512026-01-24PERSEDIAAN UMUM6050.0483KUNCI PIPA 18"260110263124,0002601102632026-02-052026-02-052026-02-052124,000122601108432026-02-1162026-02-12On timeLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-01-31Tika LisnawatiPCS248,0000Net 45REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100512026-01-24PERSEDIAAN UMUM6030.2595IMPACT WRENCH BATERAI DONGCHENG DCPB358 EM 20V2601102631,082,5002601102632026-02-052026-02-052026-02-0531,082,500122601108432026-02-1162026-02-12On timeLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-01-31Tika LisnawatiSET3,247,5000Net 45REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100512026-01-24PERSEDIAAN UMUM6030.0792SIKAT MANGKOK 3 INCH2605100098,6002601102632026-02-052026-02-052026-02-05109,000122601108432026-02-1162026-02-12On timeLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-01-31Tika LisnawatiPCS90,0000Net 45REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100512026-01-24PERSEDIAAN UMUM6030.2521LEVEL BLOCK 2T KONDOTEC2603100382,520,0002601102632026-02-052026-02-052026-02-0522,520,000122601110312026-02-20152026-02-12LateLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-01-31Tika LisnawatiPCS5,040,0000Net 45REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100512026-01-24PERSEDIAAN UMUM6030.2594BOSC GSB 600 13MM MESIN BOR IMPACT260110263596,0002601102632026-02-052026-02-052026-02-051596,000122601108432026-02-1162026-02-12On timeLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-01-31Tika LisnawatiPCS596,0000Net 45REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100512026-01-24PERSEDIAAN UMUM6050.1239MAKITA GERINDA TANGAN 9553 B TOOL ONLY 4INCH 710W260410063662,1632601102632026-02-052026-02-052026-02-055748,000122601108432026-02-1162026-02-12On timeLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-01-31Tika LisnawatiPCS3,740,0000Net 45REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100512026-01-24PERSEDIAAN UMUM6050.124CHAIN BLOCK 3T 15M2603100613,600,0002601102632026-02-052026-02-052026-02-0513,600,000122601110312026-02-20152026-02-12LateLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-01-31Tika LisnawatiPCS3,600,0000Net 45REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN
2601100812026-02-04PERSEDIAAN UMUM6030.0033KAWAT LAS RB 26 3.2 MM26050021729,729.732601102642026-02-052026-02-052026-02-0520030,85012601108452026-02-1162026-02-12On timeLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-02-11Ibnu DarmawanKG6,170,0000Net 45REFF : 18/MRS/PROD-PK02/I/2026 KEBUTUHAN MEKANIK BODY ATAS PERMINTAAN ME.LIU AI WEN
2601100812026-02-04PERSEDIAAN UMUM6030.0166KAWAT LAS RB 26 2.6 MM26060001333,333.332601102642026-02-052026-02-052026-02-0520033,15012601108452026-02-1162026-02-12On timeLokalIDRDUTA MAKMUR MULYA, PTS0844OPENCLOSED2026-02-11Ibnu DarmawanKG6,630,0000Net 45REFF : 18/MRS/PROD-PK02/I/2026 KEBUTUHAN MEKANIK BODY ATAS PERMINTAAN ME.LIU AI WENREFF : 18/MRS/PROD-PK02/I/2026 KEBUTUHAN MEKANIK BODY ATAS PERMINTAAN ME.LIU AI WEN
2511100822025-11-24FIXED ASSETSAST02487TRAFO CU (INDOOR – DGPT) 3150 KVA (20 KV – 400/231 V, DYN. 5; WINDING CU–CU; 3 PHASE; 50 HZ; ONAN); K-13 (THDI 35%); TRAFINDO260110292710,000,0002601102922026-02-062026-02-062026-02-061710,000,000742026-02-13OverdueLokalIDRTRAFOINDO PRIMA PERKASA, PTS1107OPENOPEN2025-12-01Tika LisnawatiUNIT710,000,0001CBDREFF. 298/MRS/ENG/XI/2025 UNTUK PROJECT PK02, PERMINTAAN BP. ANDI SUSANTO
2511100822025-11-24FIXED ASSETSAST02486TRAFO CU (INDOOR – DGPT) 2500 KVA (20 KV – 400/231 V, DYN. 5; WINDING CU–CU; 3 PHASE; 50 HZ; ONAN); K-13 (THDI 35%); TRAFINDO260110292530,000,0002601102922026-02-062026-02-062026-02-062530,000,000742026-02-13OverdueLokalIDRTRAFOINDO PRIMA PERKASA, PTS1107OPENOPEN2025-12-01Tika LisnawatiUNIT1,060,000,0002CBDREFF. 298/MRS/ENG/XI/2025 UNTUK PROJECT PK02, PERMINTAAN BP. ANDI SUSANTO
2511100822025-11-24FIXED ASSETSAST02488TRAFO CU (INDOOR – DGPT) 4000 KVA (20 KV – 400/231 V, DYN. 5; WINDING CU–CU; 3 PHASE; 50 HZ; ONAN); K-13 (THDI 35%); TRAFINDO260110292910,000,0002601102922026-02-062026-02-062026-02-061910,000,000742026-02-13OverdueLokalIDRTRAFOINDO PRIMA PERKASA, PTS1107OPENOPEN2025-12-01Tika LisnawatiUNIT910,000,0001CBDREFF. 298/MRS/ENG/XI/2025 UNTUK PROJECT PK02, PERMINTAAN BP. ANDI SUSANTO
2511100822025-11-24FIXED ASSETSAST02485TRAFO CU (INDOOR – DGPT) 1600 KVA (20 KV – 400/231 V, DYN. 5; WINDING CU–CU; 3 PHASE; 50 HZ; ONAN); K-13 (THDI 35%); TRAFINDO260110292470,000,0002601102922026-02-062026-02-062026-02-061470,000,000742026-02-13OverdueLokalIDRTRAFOINDO PRIMA PERKASA, PTS1107OPENOPEN2025-12-01Tika LisnawatiUNIT470,000,0001CBDREFF. 298/MRS/ENG/XI/2025 UNTUK PROJECT PK02, PERMINTAAN BP. ANDI SUSANTO
2512002332025-12-12SPAREPART5031.0288SEAL BULAT 3" 134X67X1726010070240,0002601007022026-02-062026-02-132026-02-133040,000562601017732026-02-19132026-02-20On timeLokalIDRTRASTI SUPPLIER PTS1070OPENCLOSED2026-02-26Nanda Ayu PratiwiSET1,200,0000Net 30(IMPORT) POMPA SANPIPER
2512002332025-12-12SPAREPART5031.0039RUBBER DIAPHRAGM 3" 16X400X50 MM 3/INCH DIAPHRAGM260100702700,0002601007022026-02-062026-02-132026-02-1350700,000562601013822026-02-0932026-02-20On timeLokalIDRTRASTI SUPPLIER PTS1070OPENCLOSED2026-02-26Nanda Ayu PratiwiPCS35,000,0000Net 30(IMPORT) POMPA SANPIPER
2512100682025-12-24STATIONERY6010.0693LABEL STICKER NO.121 (38X76MM)2601102728,5652601102722026-02-062026-02-142026-02-1438,565442601107762026-02-0932026-02-21On timeLokalIDRSHOPEE INTERNATIONAL INDONESIA. PTS1043OPENCLOSED2025-12-31Tika LisnawatiPACK25,6950CODREFF : KEBUTUHAN ATK PK02 PRIODE BULAN JANUARI ALL DEPARTEMENT
← PrevPage 61 of 135Next →Rows per page:1020501005001000