KKobin GroupProcurement KPI

Consolidated data

LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)

Export CSV
How the files are consolidated— click to expand

Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.

LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.

PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.

VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).

KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).

On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.

Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.

PR NoPR DateItem GroupItem CodeItemLast POLast PricePO NoPO Date ▲ETAETA (PO Report)QtyPricePR→POGRPO NoGRPO DatePO→GRPODeadlineRealisasiL/ICurrencyVendorVendor CodeStatus PRStatus PORequired DateRequest ByUoMTotal POOutstandingTOPRemarks
2511101002025-11-29SPAREPART5017.0481MCCB125 3P 125A260110432706,1502512100252025-12-052025-12-152025-12-152790,00062512102852025-12-1382025-12-22On timeLokalIDRTARUMA GITA PERSADA PT.S0462CLOSEDCLOSED2025-12-06Tika LisnawatiPCS1,580,0000Net 45
2512000082025-12-01PERSEDIAAN UMUM6030.0367BESI SIKU 50 X 50 X 5MM X 6M SNI260500103270,270.272512001072025-12-052025-12-202025-12-202243,243.2442512004412025-12-1382025-12-27On timeLokalIDRSUMBER ABADI BAJA PERKASA CV.S0074CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiBTG486,486.490Net 30OVERHAUL MIXER SLURY BMSD
2512000082025-12-01PERSEDIAAN UMUM6030.2448PLAT STRIP 10X10X6000 MM251200104295,0002512001042025-12-052025-12-202025-12-202295,00042512006262025-12-18132025-12-27On timeLokalIDRDASAN PUTRA PERKASA CV.S0077CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiBTG590,0000Net 30OVERHAUL MIXER SLURY BMSD
2512000202025-12-01PERSEDIAAN UMUM6050.0372TANG CATUT25120010935,135.142512001092025-12-052025-12-242025-12-24135,135.1442512004352025-12-1382025-12-31On timeLokalIDRSUMBER ABADI CVS0665CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS35,135.140Net 30TOOLS ENGINEERING. TEKIRO
2512000202025-12-01PERSEDIAAN UMUM6050.0455TANG BUAYA26050038976,4002512001092025-12-052025-12-242025-12-24198,963.9642512004352025-12-1382025-12-31On timeLokalIDRSUMBER ABADI CVS0665CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS98,963.960Net 30TOOLS ENGINEERING. TEKIRO
2512000452025-12-03SPAREPART5021.0129V. BELT B - 285260100234217,9002512001132025-12-052025-12-182025-12-1810217,90022512003062025-12-1052025-12-25On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-05Nanda Ayu PratiwiPCS2,179,0000Net 60PACKING PN 2. BANDO
2512000452025-12-03SPAREPART5021.0101V. BELT B - 186251200113135,1002512001132025-12-052025-12-182025-12-1810135,10022512006162025-12-18132025-12-25On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-05Nanda Ayu PratiwiPCS1,351,0000Net 60PACKING PN 2. BANDO
2512000452025-12-03SPAREPART5021.0101V. BELT B - 186251200113135,1002512001132025-12-052025-12-182025-12-1810135,10022512003062025-12-1052025-12-25On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-05Nanda Ayu PratiwiPCS1,351,0000Net 60PACKING PN 2. BANDO
2512000452025-12-03SPAREPART5021.0123V. BELT B - 250260101026191,2002512001022025-12-052025-12-182025-12-185191,20022512006182025-12-18132025-12-25On timeLokalIDRASIAN BERINDO JAYA PT.S0037CLOSEDCLOSED2025-12-05Nanda Ayu PratiwiPCS956,0000Net 60PACKING PN 2. BANDO
2512000452025-12-03SPAREPART5021.0082V. BELT B - 13425120011397,3002512001132025-12-052025-12-182025-12-181097,30022512003062025-12-1052025-12-25On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-05Nanda Ayu PratiwiPCS973,0000Net 60PACKING PN 2. BANDO
2512000452025-12-03SPAREPART5021.0091V. BELT B - 158260500140126,0502512001022025-12-052025-12-182025-12-1810114,75022512006182025-12-18132025-12-25On timeLokalIDRASIAN BERINDO JAYA PT.S0037CLOSEDCLOSED2025-12-05Nanda Ayu PratiwiPCS1,147,5000Net 60PACKING PN 2. BANDO
2512000452025-12-03SPAREPART5021.0123V. BELT B - 250260101026191,2002512001132025-12-052025-12-182025-12-185191,20022512003062025-12-1052025-12-25On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-05Nanda Ayu PratiwiPCS956,0000Net 60PACKING PN 2. BANDO
2512000462025-12-03SPAREPART5017.0908INSTRUMENT CABLE WIRED 6C/22AWG25120009525,0002512000952025-12-052025-12-202025-12-203025,00022512003772025-12-1272025-12-27On timeLokalIDRSAMUDRA ARUNG NUSANTARA. PTS0738CLOSEDCLOSED2025-12-07Nanda Ayu PratiwiMTR750,0000Net 30PACKING 1B
2512000472025-12-03PERSEDIAAN UMUM6020.047BOX PANEL 60X50 CM260100586620,0002512000962025-12-052025-12-222025-12-221580,00022512003702025-12-1272025-12-29On timeLokalIDRPUTRA ANDALAN SAKTI PT.S0139CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS580,0000Net 60PENAMBAHAN EMERGENCY LINE PACKING 1C
2512000482025-12-03SPAREPART5011.0279BEARING UCP 206260400546120,3002512000992025-12-052025-12-232025-12-234127,00022512003082025-12-1052025-12-30On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS508,0000Net 60PENAMBAHAN EMERGENCY LINE PACKING 1C. FYH
2512000482025-12-03SPAREPART5011.0277BEARING UCP 20426050047184,0002512000992025-12-052025-12-232025-12-23284,00022512003082025-12-1052025-12-30On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS168,0000Net 60PENAMBAHAN EMERGENCY LINE PACKING 1C. FYH
2512000482025-12-03SPAREPART5011.027BEARING UCFL 20526050014890,0002512000992025-12-052025-12-232025-12-23290,00022512003082025-12-1052025-12-30On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS180,0000Net 60PENAMBAHAN EMERGENCY LINE PACKING 1C. FYH
2512000782025-12-03PERSEDIAAN UMUM6050.0296LEM LOCTITE 242251200106240,0002512001062025-12-052025-12-192025-12-191240,00022512002692025-12-0942025-12-26On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2025-12-07Nanda Ayu PratiwiPCS240,0000Net 30COMPRESSOR
2512000822025-12-03PERSEDIAAN UMUM6050.0948TUSEN KLEP 3 INCH251200101427,364.872512001012025-12-052025-12-162025-12-162427,364.8722512002252025-12-0942025-12-23On timeLokalIDRJATMIKO CIPTA KARYA PT.S0156CLOSEDCLOSED2025-12-09Nanda Ayu PratiwiPCS854,729.730Net 1MERK SAILING. UTK POMPA TANDON AIR PN 1
2512000902025-12-04PERSEDIAAN UMUM6060.0273BORG M 8X82605002146102512001032025-12-052025-12-192025-12-1910061012512002652025-12-0942025-12-26On timeLokalIDRAGUNG JAYA BAUTS0196CLOSEDCLOSED2025-12-09Nanda Ayu PratiwiPCS61,0000Net 30PACKING PN 2
← PrevPage 60 of 672Next →Rows per page:1020501005001000