Consolidated data
LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)
How the files are consolidated— click to expand
Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.
LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.
PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.
VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).
KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).
On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.
Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.
| PR Noⓘ | PR Dateⓘ | Item Groupⓘ | Item Codeⓘ | Itemⓘ | Last POⓘ | Last Priceⓘ | PO Noⓘ | PO Date ▲ⓘ | ETAⓘ | ETA (PO Report)ⓘ | Qtyⓘ | Priceⓘ | PR→POⓘ | GRPO Noⓘ | GRPO Dateⓘ | PO→GRPOⓘ | Deadlineⓘ | Realisasiⓘ | L/Iⓘ | Currencyⓘ | Vendorⓘ | Vendor Codeⓘ | Status PRⓘ | Status POⓘ | Required Dateⓘ | Request Byⓘ | UoMⓘ | Total POⓘ | Outstandingⓘ | TOPⓘ | Remarksⓘ |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 260100450 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260100637 | 2026-02-03 | 2026-02-28 | 2026-02-28 | 260,000 | 10,099.2 | 4 | 260101557 | 2026-02-13 | 10 | 2026-03-07 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 2,625,792,000 | 0 | Net 90 | Acuan kurs bulanan: 16,832 Partial delivery |
| 260100450 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0002 | TRANSPARENT FRIT IT-1413A | 260600053 | 10,466.4 | 260100637 | 2026-02-03 | 2026-02-28 | 2026-02-28 | 260,000 | 10,099.2 | 4 | 260101926 | 2026-02-23 | 20 | 2026-03-07 | On time | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 2,625,792,000 | 0 | Net 90 | Acuan kurs bulanan: 16,832 Partial delivery |
| 260100454 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0018 | COMPOSED GLAZE (MATT) IG-405 | 260600277 | 8,024.24 | 260100636 | 2026-02-03 | 2026-02-09 | 2026-02-09 | 30,000 | 7,742.72 | 4 | 260101805 | 2026-02-20 | 17 | 2026-02-16 | Late | Lokal | IDR | CHINA GLAZE INDONESIA PT. | S0009 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 232,281,600 | 0 | Net 90 | Acuan kurs bulanan: 16,832 |
| 260100455 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260100635 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 60,000 | 7,995.2 | 4 | 260101738 | 2026-02-19 | 16 | 2026-02-27 | On time | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 479,712,000 | 0 | Net 90 | Acuan kurs bulanan: 16,832 Schedule kedatangan: - 13/01 (30 Ton) - 20/02 (30 Ton) |
| 260100455 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260100635 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 60,000 | 7,995.2 | 4 | 260101434 | 2026-02-10 | 7 | 2026-02-27 | On time | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 479,712,000 | 0 | Net 90 | Acuan kurs bulanan: 16,832 Schedule kedatangan: - 13/01 (30 Ton) - 20/02 (30 Ton) |
| 260100455 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0057 | TRANSPARENT FRIT 1615 | 260600050 | 8,285.9 | 260100635 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 60,000 | 7,995.2 | 4 | 260101585 | 2026-02-14 | 11 | 2026-02-27 | On time | Lokal | IDR | CERACHEMI INTERNATIONAL PT. | S0008 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 479,712,000 | 0 | Net 90 | Acuan kurs bulanan: 16,832 Schedule kedatangan: - 13/01 (30 Ton) - 20/02 (30 Ton) |
| 260100459 | 2026-01-30 | BAHAN BAKU GLAZE | 1020.0019 | OPACIFIER U-10 | 260600040 | 28,580.8 | 260100648 | 2026-02-03 | 2026-02-24 | 2026-02-24 | 60,000 | 26,880 | 4 | 260101835 | 2026-02-21 | 18 | 2026-03-03 | On time | Lokal | IDR | PRIMACO PUTRA PERSADA CV. | S0023 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 1,612,800,000 | 0 | Net 60 | Acuan kurs BI: 16,800 |
| 260100459 | 2026-01-30 | BAHAN BAKU GLAZE | 1020.0019 | OPACIFIER U-10 | 260600040 | 28,580.8 | 260100648 | 2026-02-03 | 2026-02-24 | 2026-02-24 | 60,000 | 26,880 | 4 | 260101498 | 2026-02-11 | 8 | 2026-03-03 | On time | Lokal | IDR | PRIMACO PUTRA PERSADA CV. | S0023 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 1,612,800,000 | 0 | Net 60 | Acuan kurs BI: 16,800 |
| 260100460 | 2026-01-30 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260100641 | 2026-02-03 | 2026-02-28 | 2026-02-28 | 150,000 | 9,463.75 | 4 | 260101778 | 2026-02-19 | 16 | 2026-03-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 1,419,562,500 | 0 | Net 120 | Acuan kurs: 16,800 Partial delivery |
| 260100460 | 2026-01-30 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260100641 | 2026-02-03 | 2026-02-28 | 2026-02-28 | 150,000 | 9,463.75 | 4 | 260101497 | 2026-02-11 | 8 | 2026-03-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 1,419,562,500 | 0 | Net 120 | Acuan kurs: 16,800 Partial delivery |
| 260100460 | 2026-01-30 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260100641 | 2026-02-03 | 2026-02-28 | 2026-02-28 | 150,000 | 9,463.75 | 4 | 260101998 | 2026-02-25 | 22 | 2026-03-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 1,419,562,500 | 0 | Net 120 | Acuan kurs: 16,800 Partial delivery |
| 260100460 | 2026-01-30 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260100641 | 2026-02-03 | 2026-02-28 | 2026-02-28 | 150,000 | 9,463.75 | 4 | 260101354 | 2026-02-09 | 6 | 2026-03-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 1,419,562,500 | 0 | Net 120 | Acuan kurs: 16,800 Partial delivery |
| 260100460 | 2026-01-30 | BAHAN BAKU GLAZE | 1020.0023 | HIGH COE TITANIUM FRIT K-0863 | 260600042 | 10,028.75 | 260100641 | 2026-02-03 | 2026-02-28 | 2026-02-28 | 150,000 | 9,463.75 | 4 | 260101777 | 2026-02-19 | 16 | 2026-03-07 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | OPEN | CLOSED | 2026-02-06 | Qhadafy | KG | 1,419,562,500 | 0 | Net 120 | Acuan kurs: 16,800 Partial delivery |
| 260100461 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0064 | TRANSPARENT FRIT AR 273 | 260500269 | 9,010.44 | 260100645 | 2026-02-03 | 2026-02-09 | 2026-02-09 | 10,000 | 8,652 | 4 | 260101435 | 2026-02-10 | 7 | 2026-02-16 | On time | Lokal | IDR | ARROW INDO UNIVERSAL, PT. | S0801 | OPEN | CLOSED | 2026-02-06 | Qhadafy | – | 86,520,000 | 0 | Net 60 | Acuan kurs BI: 16,800 |
| 260100462 | 2026-01-30 | BAHAN BAKU GLAZE | 1030.0062 | TRANSPARENT FRIT K 0248 | 260600043 | 8,786.25 | 260100643 | 2026-02-03 | 2026-02-10 | 2026-02-10 | 30,000 | 8,291.25 | 4 | 260101352 | 2026-02-09 | 6 | 2026-02-17 | On time | Lokal | IDR | KASMAJI INTI UTAMA PT. | S0014 | CLOSED | CLOSED | 2026-02-06 | Qhadafy | KG | 248,737,500 | 0 | Net 120 | Acuan kurs BI: 16,800 |
| 260100467 | 2026-02-02 | BAHAN PACKING | 3011.0218 | NFT00 40X40 JUPITER MP2 KW-A 403X54 (BK150/125/125) | 260600120 | 357 | 260100584 | 2026-02-03 | 2026-02-10 | 2026-02-10 | 20,000 | 314 | 1 | 260101290 | 2026-02-06 | 3 | 2026-02-17 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-05 | Qhadafy | PCS | 6,280,000 | 1,300 | Net 60 | – |
| 260100467 | 2026-02-02 | BAHAN PACKING | 3011.0217 | NFT00 40X40 JUPITER MP1 KW-A 403X51 (BK150/125/125) | 260600120 | 409 | 260100584 | 2026-02-03 | 2026-02-10 | 2026-02-10 | 20,000 | 359 | 1 | 260101290 | 2026-02-06 | 3 | 2026-02-17 | On time | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | OPEN | 2026-02-05 | Qhadafy | PCS | 7,180,000 | 1,300 | Net 60 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100612 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 725 | 53,000 | 1 | 260401071 | 2026-04-29 | 85 | 2026-02-27 | Late | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 38,425,000 | 0 | Net 60 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100612 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 725 | 53,000 | 1 | 260400232 | 2026-04-08 | 64 | 2026-02-27 | Late | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 38,425,000 | 0 | Net 60 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100611 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 1,000 | 53,000 | 1 | – | – | – | 2026-02-27 | Overdue | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 53,000,000 | 0 | Net 30 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100611 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 1,000 | 53,000 | 1 | 260102018 | 2026-02-26 | 23 | 2026-02-27 | On time | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 53,000,000 | 0 | Net 30 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100611 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 1,000 | 53,000 | 1 | 260300010 | 2026-03-02 | 27 | 2026-02-27 | Late | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 53,000,000 | 0 | Net 30 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100611 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 1,000 | 53,000 | 1 | 260101881 | 2026-02-23 | 20 | 2026-02-27 | On time | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 53,000,000 | 0 | Net 30 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100611 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 1,000 | 53,000 | 1 | 260101831 | 2026-02-21 | 18 | 2026-02-27 | On time | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 53,000,000 | 0 | Net 30 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100611 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 1,000 | 53,000 | 1 | – | – | – | 2026-02-27 | Overdue | Lokal | IDR | CV. JAYA MAKMUR REZEKI | S0627 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 53,000,000 | 0 | Net 30 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100612 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 725 | 53,000 | 1 | 260300015 | 2026-03-02 | 27 | 2026-02-27 | Late | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 38,425,000 | 0 | Net 60 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100612 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 725 | 53,000 | 1 | 260101962 | 2026-02-25 | 22 | 2026-02-27 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 38,425,000 | 0 | Net 60 | – |
| 260100468 | 2026-02-02 | BAHAN PEMBANTU | 2045.0007 | PALLET LOKAL BARU 110*110 | 260600271 | 61,000 | 260100612 | 2026-02-03 | 2026-02-20 | 2026-02-20 | 725 | 53,000 | 1 | 260102017 | 2026-02-26 | 23 | 2026-02-27 | On time | Lokal | IDR | JENNY PALET | S0676 | CLOSED | CLOSED | 2026-02-04 | Qhadafy | – | 38,425,000 | 0 | Net 60 | – |
| 260100469 | 2026-02-02 | FIXED ASSETS | AST02625 | DAIKIN WALL MOUNTED NON INVERTER | 260100608 | 3,340,500 | 260100608 | 2026-02-03 | 2026-02-06 | 2026-02-06 | 1 | 3,340,500 | 1 | 260101336 | 2026-02-07 | 4 | 2026-02-13 | On time | Lokal | IDR | DAVINDO ANUGRAH UNGGUL. CV | S0740 | CLOSED | CLOSED | 2026-02-09 | General | – | 3,340,500 | 0 | Net 14 | STC15YV, model FTC15YV14 + RC15YV14 |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260310148 | 2026-03-09 | 34 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260111010 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260111012 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260111011 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260111084 | 2026-02-21 | 18 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260310152 | 2026-03-09 | 34 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260111012 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260310148 | 2026-03-09 | 34 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260111109 | 2026-02-23 | 20 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0265 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP1 KWA 605X40 (BK150/125/125) | 260610185 | 610 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 557 | 5 | 260111007 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 135,685,200 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260111084 | 2026-02-21 | 18 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260310152 | 2026-03-09 | 34 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260111011 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260111109 | 2026-02-23 | 20 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260111010 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110070 | 2026-01-29 | BAHAN PACKING | 3011.0266 | CARTON BOX DLG NEW DESIGN KOBIN GRANIT 60X60 MP2 KWA 605X38 (BK150/125/125) | 260610185 | 580 | 260110251 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 243,600 | 531 | 5 | 260111007 | 2026-02-19 | 16 | 2026-02-10 | Late | Lokal | IDR | SARANA PACKAGING AGRAPANA PT. | S0477 | CLOSED | CLOSED | 2026-02-18 | Aulia Safitri | PCS | 129,351,600 | 0 | Net 60 | KEBUTUHAN PRODUKSI DLG 2 LAYER |
| 260110073 | 2026-02-02 | SPAREPART | 5023.1458 | RUBBER ROLL ID.30MM, OD.35MM | 260110252 | 55,000 | 260110252 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 200 | 55,000 | 1 | 260110832 | 2026-02-10 | 7 | 2026-02-10 | On time | Lokal | IDR | BANDUNG JAYA RUBBER,.CV | S1009 | CLOSED | CLOSED | 2026-02-09 | Tika Lisnawati | METER | 11,000,000 | 0 | Net 30 | REFF : 015/MRS/PROD-PK2/I/2026 KEBUTUHAN ROLL PRESS ATAS PERMINTAAN ZHE ZHAOWEN, REPEAT ORDER 251110094 |
| 260110073 | 2026-02-02 | SPAREPART | 5023.1458 | RUBBER ROLL ID.30MM, OD.35MM | 260110252 | 55,000 | 260110252 | 2026-02-03 | 2026-02-03 | 2026-02-03 | 200 | 55,000 | 1 | 260310105 | 2026-03-06 | 31 | 2026-02-10 | Late | Lokal | IDR | BANDUNG JAYA RUBBER,.CV | S1009 | CLOSED | CLOSED | 2026-02-09 | Tika Lisnawati | METER | 11,000,000 | 0 | Net 30 | REFF : 015/MRS/PROD-PK2/I/2026 KEBUTUHAN ROLL PRESS ATAS PERMINTAAN ZHE ZHAOWEN, REPEAT ORDER 251110094 |
| 251100371 | 2025-11-25 | PERSEDIAAN UMUM | 6020.0657 | BATTERY CHARGER DEEPSEA DSE 9255 24V 5A | 260300412 | 900,000 | 260100660 | 2026-02-04 | 2026-02-24 | 2026-02-24 | 1 | 900,000 | 71 | 260101461 | 2026-02-11 | 7 | 2026-03-03 | On time | Lokal | IDR | CENTRAL NUSA JAYA .PT | S0825 | CLOSED | CLOSED | 2025-11-29 | Nanda Ayu Pratiwi | PCS | 900,000 | 0 | Net 30 | GENSET PN 1 |
| 251200423 | 2025-12-26 | SPAREPART | 5032.1435 | HOSE STEERING TAILIFT FD35 4TNE98 URTL | 260100663 | 300,000 | 260100663 | 2026-02-04 | 2026-02-23 | 2026-02-23 | 4 | 300,000 | 40 | 260101479 | 2026-02-11 | 7 | 2026-03-02 | On time | Lokal | IDR | TOYO MATSU PT. | S0036 | CLOSED | CLOSED | 2025-12-31 | Nanda Ayu Pratiwi | PCS | 1,200,000 | 0 | Net 30 | SERVICE FORKLIFT TAILIFT PENGGANTIAN HOSE STEERING TAILIFT 12 & SPARE |
| 260100223 | 2026-01-19 | PERSEDIAAN UMUM | 6030.1678 | ABU BATU | 260100652 | 187,500 | 260100652 | 2026-02-04 | 2026-02-04 | 2026-02-04 | 4 | 187,500 | 16 | 260101524 | 2026-02-12 | 8 | 2026-02-11 | Late | Lokal | IDR | CASH | S1102 | CLOSED | CLOSED | 2026-01-24 | Nanda Ayu Pratiwi | M³ | 750,000 | 0 | - Cash Basic - | UNTUK PAVING AREA PALLET (UD DOA IBU) |
| 260100253 | 2026-01-20 | PERSEDIAAN UMUM | 6020.0521 | SENTER LED RECHARGEABLE | 260300329 | 145,345 | 260100670 | 2026-02-04 | 2026-02-20 | 2026-02-20 | 1 | 168,200 | 15 | 260101372 | 2026-02-09 | 5 | 2026-02-27 | On time | Lokal | IDR | TOKOPEDIA | S0167 | CLOSED | CLOSED | 2026-01-21 | Gita | PCS | 168,200 | 0 | - Cash Basic - | CECK DEFFECT |
| 260100299 | 2026-01-23 | SPAREPART | 5021.0119 | V. BELT B - 240 | 260100658 | 183,500 | 260100658 | 2026-02-04 | 2026-02-26 | 2026-02-26 | 10 | 183,500 | 12 | 260101306 | 2026-02-06 | 2 | 2026-03-05 | On time | Lokal | IDR | CENTURY BEARINDO PT. (PPN) | S0043 | CLOSED | CLOSED | 2026-01-28 | Gita | PCS | 1,835,000 | 0 | Net 60 | GLAZING LINE 1A & 1B |
| 260100299 | 2026-01-23 | SPAREPART | 5028.0042 | PULLY B1-9 KONDE | 260100669 | 200,000 | 260100669 | 2026-02-04 | 2026-02-26 | 2026-02-26 | 8 | 200,000 | 12 | 260400253 | 2026-04-09 | 64 | 2026-03-05 | Late | Lokal | IDR | PUTRA PERKASA TEHNIK .CV | S0905 | CLOSED | CLOSED | 2026-01-28 | Gita | PCS | 1,600,000 | 0 | Net 30 | GLAZING LINE 1A & 1B. PULLY B1 9 INCH KONDE OD 30 MM BORG M-10 |
| 260100299 | 2026-01-23 | SPAREPART | 5021.0127 | V. BELT B - 270 | 260300499 | 206,500 | 260100658 | 2026-02-04 | 2026-02-26 | 2026-02-26 | 10 | 206,500 | 12 | 260101306 | 2026-02-06 | 2 | 2026-03-05 | On time | Lokal | IDR | CENTURY BEARINDO PT. (PPN) | S0043 | CLOSED | CLOSED | 2026-01-28 | Gita | PCS | 2,065,000 | 0 | Net 60 | GLAZING LINE 1A & 1B |
| 260100299 | 2026-01-23 | SPAREPART | 5021.0119 | V. BELT B - 240 | 260100658 | 183,500 | 260100658 | 2026-02-04 | 2026-02-26 | 2026-02-26 | 10 | 183,500 | 12 | 260400523 | 2026-04-15 | 70 | 2026-03-05 | Late | Lokal | IDR | CENTURY BEARINDO PT. (PPN) | S0043 | CLOSED | CLOSED | 2026-01-28 | Gita | PCS | 1,835,000 | 0 | Net 60 | GLAZING LINE 1A & 1B |
| 260100368 | 2026-01-27 | SPAREPART | 5017.0215 | MCCB SNEIDER 100 A | 260400272 | 571,850 | 260100659 | 2026-02-04 | 2026-02-23 | 2026-02-23 | 2 | 520,000 | 8 | 260101485 | 2026-02-11 | 7 | 2026-03-02 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2026-02-02 | Gita | PCS | 1,040,000 | 0 | Net 30 | PANEL PN1 & PN2 |
| 260100368 | 2026-01-27 | SPAREPART | 5017.0438 | MOTOR PROTECTION SCHNEIDER TYPE GV2ME14 | 260500048 | 570,000 | 260100659 | 2026-02-04 | 2026-02-23 | 2026-02-23 | 3 | 540,000 | 8 | 260101485 | 2026-02-11 | 7 | 2026-03-02 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2026-02-02 | Gita | PCS | 1,620,000 | 0 | Net 30 | PANEL PN1 & PN2 |
| 260100368 | 2026-01-27 | SPAREPART | 5017.034 | MOTOR PROTECTION SCHNEIDER TYPE GV2ME10 | 260500288 | 545,000 | 260100659 | 2026-02-04 | 2026-02-23 | 2026-02-23 | 3 | 464,000 | 8 | 260101485 | 2026-02-11 | 7 | 2026-03-02 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2026-02-02 | Gita | PCS | 1,392,000 | 0 | Net 30 | PANEL PN1 & PN2 |
| 260100368 | 2026-01-27 | SPAREPART | 5017.1019 | MOTOR PROTECTION SCHNEIDER TYPE GV2ME08 | 260500287 | 490,000 | 260100659 | 2026-02-04 | 2026-02-23 | 2026-02-23 | 3 | 462,000 | 8 | 260101485 | 2026-02-11 | 7 | 2026-03-02 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2026-02-02 | Gita | PCS | 1,386,000 | 0 | Net 30 | PANEL PN1 & PN2 |
| 260100384 | 2026-01-29 | SPAREPART | 5017.1077 | SOLID STATE RELAY (SSR) TYPE FOTEX 40DA (INPUT 3 - 32 VDC, OUTPUT 24 - 480 VAC) | 260100665 | 285,000 | 260100665 | 2026-02-04 | 2026-02-23 | 2026-02-23 | 3 | 285,000 | 6 | 260101483 | 2026-02-11 | 7 | 2026-03-02 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2026-02-05 | Gita | PCS | 855,000 | 0 | Net 30 | AUTOCLAVE PN1 |
| 260100385 | 2026-01-29 | PERSEDIAAN UMUM | 6020.0107 | KABEL SCUN 25 MM | 260100664 | 3,000 | 260100664 | 2026-02-04 | 2026-02-20 | 2026-02-20 | 30 | 3,000 | 6 | 260101484 | 2026-02-11 | 7 | 2026-02-27 | On time | Lokal | IDR | SAMUDRA ARUNG NUSANTARA. PT | S0738 | CLOSED | CLOSED | 2026-02-04 | Gita | PCS | 90,000 | 0 | Net 30 | KAPASITOR BANK PN1 & PN2 |
| 260100388 | 2026-01-29 | PERSEDIAAN UMUM | 6050.0048 | SPON 10CM | 260300059 | 575,000 | 260100667 | 2026-02-04 | 2026-02-24 | 2026-02-24 | 1 | 575,000 | 6 | 260101386 | 2026-02-09 | 5 | 2026-03-03 | On time | Lokal | IDR | SUMBER UNTUNG TOKO | S0220 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 575,000 | 0 | Net 1 | GLAZING LINE 1A, 1B & 1C |
| 260100388 | 2026-01-29 | PERSEDIAAN UMUM | 6050.062 | KUNCI L SET TEKIRO | 260500486 | 100,200 | 260100666 | 2026-02-04 | 2026-02-23 | 2026-02-23 | 1 | 155,765.77 | 6 | 260101421 | 2026-02-10 | 6 | 2026-03-02 | On time | Lokal | IDR | SUMBER ABADI CV | S0665 | CLOSED | CLOSED | 2026-02-03 | Gita | SET | 155,765.77 | 0 | Net 30 | GLAZING LINE 1A, 1B & 1C. Tekiro |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0803 | FORM - QMS - 19 | 260400263 | 12,500 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 20 | 12,500 | 6 | 260300129 | 2026-03-04 | 28 | 2026-02-18 | Late | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 250,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.08 | FORM - QMS - 05 | 260100656 | 12,500 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 20 | 12,500 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 250,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0803 | FORM - QMS - 19 | 260400263 | 12,500 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 20 | 12,500 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 250,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0802 | FORM - QMS - 18 | 260500420 | 12,000 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 125,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0804 | FORM - QMS - 21 | 260100656 | 12,500 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 125,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0805 | FORM TAG KUWALITAS | 260100656 | 15,000 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 15,000 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 150,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0806 | FORM TAG NON KUWALITAS | 260100656 | 15,000 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 15,000 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 150,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0799 | FORM - QMS - 01 | 260100656 | 12,500 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 125,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100392 | 2026-01-29 | PERSEDIAAN UMUM | 6010.0801 | FORM - QMS - 08 | 260510263 | 10,000 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 6 | 260101663 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-02 | Gita | BUKU | 125,000 | 0 | Net 30 | PENCATATAN HASIL KERJA QMS |
| 260100407 | 2026-01-08 | BAHAN BAKAR | 4010.0001 | SOLAR | 260600111 | 20,720.72 | 260100651 | 2026-02-04 | 2026-02-07 | 2026-02-07 | 8,000 | 13,153.15 | 27 | 260101317 | 2026-02-07 | 3 | 2026-02-14 | On time | Lokal | IDR | INDOMOBIL PRIMA ENERGI, PT | S0131 | CLOSED | CLOSED | 2026-01-12 | Gandhi | LTR | 105,225,224 | 0 | Net 30 | PENGISIAN TANGKI B DAN TANGKI C |
| 260100413 | 2026-01-29 | PERSEDIAAN UMUM | 6050.0993 | SEPATU BOOTS SIZE 40 | 260100668 | 160,000 | 260100668 | 2026-02-04 | 2026-02-24 | 2026-02-24 | 1 | 160,000 | 6 | 260101457 | 2026-02-11 | 7 | 2026-03-03 | On time | Lokal | IDR | CENTRAL NUSA JAYA .PT | S0825 | CLOSED | CLOSED | 2026-02-05 | Gita | PASANG | 160,000 | 0 | Net 30 | WRM (TIMBANG BAHAN BAKU GLAZE). sepatu safety merk gosave dalam ada besi |
| 260100413 | 2026-01-29 | PERSEDIAAN UMUM | 6050.0994 | SEPATU BOOTS SIZE 41 | 260400358 | 160,000 | 260100668 | 2026-02-04 | 2026-02-24 | 2026-02-24 | 1 | 160,000 | 6 | 260101457 | 2026-02-11 | 7 | 2026-03-03 | On time | Lokal | IDR | CENTRAL NUSA JAYA .PT | S0825 | CLOSED | CLOSED | 2026-02-05 | Gita | PASANG | 160,000 | 0 | Net 30 | WRM (TIMBANG BAHAN BAKU GLAZE). sepatu safety merk gosave dalam ada besi |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0174 | BINDER CLIP NO. 155 NO. 155 | 260610060 | 7,200 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 1 | 5,200 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 5,200 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0156 | STAPLES KECIL HD-10 | 260610151 | 9,741 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 1 | 34,500 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 34,500 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0444 | TINTA EPSON 003 CYAN 65ML | 260600027 | 83,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 2 | 83,000 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 166,000 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0213 | AMPLOP COKLAT KOP KOBIN KOP KOBIN, 18X28 CM | 260500027 | 133,000 | 260100657 | 2026-02-04 | 2026-02-04 | 2026-02-04 | 3 | 133,000 | 5 | 260101595 | 2026-02-14 | 10 | 2026-02-11 | Late | Lokal | IDR | PRIMA CETAK DIGITAL CV. | S0509 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 399,000 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0307 | PITA PRINTER LX 310 | 260610060 | 16,800 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 3 | 46,700 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 140,100 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0148 | CUTTER BESAR L-500 | 260610151 | 7,767 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 2 | 12,000 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 24,000 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0173 | BINDER CLIP NO. 111 NO. 111 | 260600027 | 3,800 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 1 | 3,800 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 3,800 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.001 | POST IT KECIL | 260500026 | 6,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 3 | 8,700 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 26,100 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0441 | TINTA EPSON 003 BLACK 65ML | 260600027 | 83,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 2 | 83,000 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 166,000 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0229 | MAP KERTAS + ACCO 24X35 CM | 260100655 | 165,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 2 | 165,000 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 330,000 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0443 | TINTA EPSON 003 MAGENTA 65ML | 260600027 | 83,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 2 | 83,000 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 166,000 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0171 | BINDER CLIP NO. 105 NO. 105 | 260600108 | 2,200 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 1 | 2,300 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 2,300 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0172 | BINDER CLIP NO. 107 NO. 107 | 260610060 | 3,500 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 1 | 2,500 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 2,500 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0175 | BINDER CLIP NO. 260 NO. 260 | 260610060 | 18,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 1 | 13,400 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 13,400 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0442 | TINTA EPSON 003 YELLOW 65ML | 260600027 | 83,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 2 | 83,000 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PCS | 166,000 | 0 | Net 30 | ACCOUNTING |
| 260100420 | 2026-01-30 | STATIONERY | 6010.0005 | KERTAS BUFALLO 21.5 X 33.0 CM | 260100655 | 28,000 | 260100655 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 6 | 28,000 | 5 | 260101535 | 2026-02-12 | 8 | 2026-02-18 | On time | Lokal | IDR | GADING MURNI, PT. | S0380 | CLOSED | CLOSED | 2026-02-03 | Gita | PACK | 168,000 | 0 | Net 30 | KUNING, PINK, ORANGE, BIRU MUDA, HIJAU MUDA, MERAH |
| 260100422 | 2026-01-30 | STATIONERY | 6010.0042 | FORM DAFTAR PEMERIKSAAN UKURAN BARANG JADI DAFTAR PEMERIKSAAN UKURAN BARANG JADI,A4 | 260600255 | 12,000 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 5 | 260101662 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-09 | Gita | BUKU | 125,000 | 0 | Net 30 | PRODUKSI PN1 |
| 260100422 | 2026-01-30 | STATIONERY | 6010.0052 | FORM DAFTAR PEMERIKSAAN MUTU HASIL PRESS | 260400157 | 12,500 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 5 | 260101662 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-09 | Gita | BUKU | 125,000 | 0 | Net 30 | PRODUKSI PN1 |
| 260100422 | 2026-01-30 | STATIONERY | 6010.0041 | FORM CATATAN PENYEBAB LINE STOP FR-PROD-18 A4, FR-PROD-18 | 260600255 | 12,000 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 5 | 260101662 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-09 | Gita | BUKU | 125,000 | 0 | Net 30 | PRODUKSI PN1 |
| 260100422 | 2026-01-30 | STATIONERY | 6010.0037 | FORM ANALISA BS BS ANALISA BS, A4 | 260300411 | 12,500 | 260100656 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 10 | 12,500 | 5 | 260101662 | 2026-02-16 | 12 | 2026-02-18 | On time | Lokal | IDR | AL HAKIM | S0173 | CLOSED | CLOSED | 2026-02-09 | Gita | BUKU | 125,000 | 0 | Net 30 | PRODUKSI PN1 |
| 260100463 | 2026-01-08 | PERSEDIAAN UMUM | 6030.0487 | THINER A SPECIAL | 260400298 | 50,700 | 260100696 | 2026-02-04 | 2026-02-04 | 2026-02-04 | 100 | 31,605 | 27 | 260101705 | 2026-02-18 | 14 | 2026-02-11 | Late | Lokal | IDR | TIRTAKENCANA TATAWARNA PT. | S0404 | OPEN | CLOSED | 2026-02-05 | Nanda Ayu Pratiwi | LTR | 3,160,500 | 0 | Net 30 | UNTUK DUCTING DUST COLLECTOR PRESS PN2 BARU(@5LT) |
| 260100463 | 2026-01-08 | PERSEDIAAN UMUM | 6030.0804 | AVIAN CLING SYNTHETIC 91 - KERAK ABU | 260300369 | 45,905.25 | 260100696 | 2026-02-04 | 2026-02-04 | 2026-02-04 | 50 | 45,905.2 | 27 | 260101665 | 2026-02-16 | 12 | 2026-02-11 | Late | Lokal | IDR | TIRTAKENCANA TATAWARNA PT. | S0404 | OPEN | CLOSED | 2026-02-05 | Nanda Ayu Pratiwi | KG | 2,295,260 | 0 | Net 30 | UNTUK DUCTING DUST COLLECTOR PRESS PN2 BARU |
| 260100463 | 2026-01-08 | PERSEDIAAN UMUM | 6030.0804 | AVIAN CLING SYNTHETIC 91 - KERAK ABU | 260300369 | 45,905.25 | 260100696 | 2026-02-04 | 2026-02-04 | 2026-02-04 | 50 | 45,905.2 | 27 | 260101705 | 2026-02-18 | 14 | 2026-02-11 | Late | Lokal | IDR | TIRTAKENCANA TATAWARNA PT. | S0404 | OPEN | CLOSED | 2026-02-05 | Nanda Ayu Pratiwi | KG | 2,295,260 | 0 | Net 30 | UNTUK DUCTING DUST COLLECTOR PRESS PN2 BARU |
| 260110001 | 2026-01-02 | SPAREPART | 5019.0349 | MANARELLO CYCLOIDAL GEAR MOTOR TYPE : XL5-8165-87 RATIO : 1:87 POWER : 2.2KW 3PHASE 380V 1500RPM | 260110257 | 10,800,000 | 260110257 | 2026-02-04 | 2026-02-11 | 2026-02-11 | 2 | 10,800,000 | 33 | 260110890 | 2026-02-13 | 9 | 2026-02-18 | On time | Lokal | IDR | CIPTA MANDIRI ELEKTRINDO,.PT | S0861 | OPEN | CLOSED | 2026-01-09 | Tika Lisnawati | UNIT | 21,600,000 | 0 | Net 30 | REFF : 32/MRS/ENG/XII/2025 KEBUTUHAN LIMBAH GLAZUR ATAS PERMINTAAN BPK ANDI SUSANTO |
| 260110051 | 2026-01-24 | PERSEDIAAN UMUM | 6050.1252 | ELECTRODE HOLDER STAMVICK - 800A STAMVICK | 260510133 | 63,064 | 260110260 | 2026-02-04 | 2026-02-04 | 2026-02-04 | 10 | 58,559 | 11 | 260110889 | 2026-02-13 | 9 | 2026-02-11 | Late | Lokal | IDR | XAJERIKO ABADI SEJAHTERA, PT | S1085 | OPEN | CLOSED | 2026-01-31 | Tika Lisnawati | PCS | 585,590 | 0 | Net 14 | REFF : 021/MRS/ENG/I/2026, KEBUTUHAN TOOLS SLURRY TANK PROJECT PK2 B, ATAS PERMINTAAN ADITYA RAHMAN |