KKobin GroupProcurement KPI

Consolidated data

LEAD TIME (PR → PO → GRPO) + realisasi, enriched with PO REPORT fields (currency, Lokal/Impor, vendor…) on the right · hover any column header (ⓘ) for its source · 13,431 row(s)

Export CSV
How the files are consolidated— click to expand

Report months follow the procurement cycle, not the calendar: report month M draws data from the 21st of (M-2) through the 20th of (M-1). For example January = 21 Nov–20 Dec, February = 21 Dec–20 Jan. KPI 1/2/3 window on PO date, KPI 4 on PR date, KPI 7 on vendor creation date.

LEAD TIME is the master sheet (PR → PO → GRPO, one row per PR-line, including PRs not yet converted to a PO). It sets the dashboard's date span, is KPI 4's denominator, and carries the goods-receipt detail: GR date and quantity, the ordered PO quantity, the PO Due Date (ETA), last/current price and PR→PO days.

PO REPORT enriches it with the PO detail that LEAD TIME lacks: the Lokal/Impor flag (the KPI 2 vs KPI 3 split), plus ETA, currency and unit price, joined on PO No.

VENDOR LIST is the vendor master; KPI 7 counts Active vendors whose creation date falls in the window (cumulative per year, target 6).

KPI 2/3 'received' logic is quantity-aware: a PO-item counts as received only when the running sum of GR quantities reaches the ordered quantity; the completion date (the GR that crosses the ordered qty) is compared to ETA + 7 days (Local) / 14 days (Import).

On import each file is upserted by its natural key, so re-uploading an updated export updates rows in place instead of duplicating them. KPI 5 (Quality) and 6 (Substitution) have no source in these files yet — they are seeded with best-case defaults so the scorecard is complete; replace those entries as real data arrives.

Realisasi here uses a 7-day tolerance (local). Each KPI's own formula is on its methodology page — click any KPI title on the dashboard.

PR NoPR DateItem GroupItem CodeItemLast POLast PricePO NoPO Date ▲ETAETA (PO Report)QtyPricePR→POGRPO NoGRPO DatePO→GRPODeadlineRealisasiL/ICurrencyVendorVendor CodeStatus PRStatus PORequired DateRequest ByUoMTotal POOutstandingTOPRemarks
2511101042025-11-29BAHAN PACKING3011.0209CARTON BOX SIDEWRAPS JUPITER 60X60 GP MP1 KWA 605X40 (WK150/125/150)2604100186962512100092025-12-032025-12-032025-12-0320,32867142512101692025-12-0962025-12-10On timeLokalIDRSARANA PACKAGING AGRAPANA PT.S0477CLOSEDCLOSED2025-12-09Aulia SafitriPCS13,640,0880Net 60PENGGANTI PR NO 95
2512000092025-12-01PERSEDIAAN UMUM6030.0448TRIPLEX 18 MM251200208250,0002512000362025-12-032025-12-152025-12-155250,00022512000502025-12-032025-12-22On timeLokalIDRUD. MIRA MAKMURS0174CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiLMBR1,250,0000Net 60PEMBUATAN RAK BENGKEL
2512000092025-12-01PERSEDIAAN UMUM6030.0613METERAN 5 MTR2605101569,3632512000362025-12-032025-12-152025-12-15225,00022512000502025-12-032025-12-22On timeLokalIDRUD. MIRA MAKMURS0174CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS50,0000Net 60TOOLS ENGINEERING
2512000142025-12-01PERSEDIAAN UMUM6050.0568ACCU KERING 105 D 31 R/L2605003332,350,0002512000552025-12-032025-12-152025-12-1522,350,00022512001272025-12-0522025-12-22On timeLokalIDRTOYO MATSU PT.S0036CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiPCS4,700,0000Net 30ALAT BERAT. GS
2512000152025-12-01BAHAN BAKAR4030.001DAPHNE SUPER HYDRO 46 (IDEMITSU)26060022462,2502512000392025-12-032025-12-152025-12-1540041,50022512001312025-12-0522025-12-22On timeLokalIDRGUNATAMA SUKSES MANDIRI PT.S0128CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiLTR16,600,0000Net 60ALAT BERAT
2512000182025-12-01PERSEDIAAN UMUM6050.106COVER STRIP LEBAR 10 CM2512000383,513,513.512512000382025-12-032025-12-222025-12-2223,513,513.5122512004372025-12-13102025-12-29On timeLokalIDRCENTRAL TEKNINDO A P PT.S0133CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiROLL7,027,027.030Net 60SAMBUNGAN CONVEYOR
2512000192025-12-01PERSEDIAAN UMUM6020.0369KABEL NYYHY 4X1.5 MM2605001012,300,0002512000492025-12-032025-12-222025-12-2211,840,00022512003762025-12-1292025-12-29On timeLokalIDRSAMUDRA ARUNG NUSANTARA. PTS0738CLOSEDCLOSED2025-12-08Nanda Ayu PratiwiROLL1,840,0000Net 30GLAZING LINE PN 2. SUPREME
2512000272025-12-01PERSEDIAAN UMUM6010.0351AIR MINERAL GALON26060024818,018.022512000372025-12-032025-12-102025-12-103517,567.5722512001092025-12-0522025-12-17On timeLokalIDRSENTRALSARI PRIMASENTOSA PT.S0086CLOSEDCLOSED2025-12-04Nanda Ayu PratiwiPCS614,864.880Net 30STOK AIR MINUM
2512000272025-12-01PERSEDIAAN UMUM6050.0313AIR MINERAL BOTOL KECIL 220 ML26060024819,819.822512000372025-12-032025-12-102025-12-10519,369.3722512001092025-12-0522025-12-17On timeLokalIDRSENTRALSARI PRIMASENTOSA PT.S0086CLOSEDCLOSED2025-12-04Nanda Ayu PratiwiPACK96,846.850Net 30RUANG MEETING, OFFICE, TRAINING
2512000312025-12-01PERSEDIAAN UMUM6030.2347KLEM SLANG COMBUSTION 2.5 INCH251200043323,0002512000432025-12-032025-12-032025-12-0330323,00022603006242026-03-141012025-12-10LateLokalIDRMANGGALA MEGA ENERGY PT.S1019CLOSEDCLOSED2025-11-14Nanda Ayu PratiwiPCS9,690,0000Net 45KILN PN 2C
2512100062025-12-02BAHAN PEMBANTU3034.0003TECHNOMELT 2930 ID25KG26051021852,0002512100102025-12-032025-12-102025-12-101,50034,00012512105262025-12-26232025-12-17LateLokalIDRHenkel Adhesive Technologies,.PTS0873CLOSEDCLOSED2025-12-15Aulia SafitriKG51,000,0000Net 45BUFFER STOCK
2512100062025-12-02BAHAN PEMBANTU3034.0003TECHNOMELT 2930 ID25KG26051021852,0002512100102025-12-032025-12-102025-12-101,50034,00012512102312025-12-1182025-12-17On timeLokalIDRHenkel Adhesive Technologies,.PTS0873CLOSEDCLOSED2025-12-15Aulia SafitriKG51,000,0000Net 45BUFFER STOCK
2512100062025-12-02BAHAN PEMBANTU2022.0003PET STRAPPING BAND 15.5X0.8 MM PANJANG=1400 MTR260600221350,0002512100112025-12-032025-12-112025-12-11160320,00012512102102025-12-1072025-12-18On timeLokalIDRTunas Mitra Maju,.PTS0903CLOSEDCLOSED2025-12-30Aulia SafitriROLL51,200,0000Net 30BUFFER STOCK
2512100072025-12-02BAHAN BAKU BODY1010.0018CLAY AB 76#2606101783902512100322025-12-032025-12-032025-12-03150,00039012605100382026-05-041522025-12-10LateLokalIDRHARAPAN WIJAYA SUKSES, CV.S0761CLOSEDCLOSED2025-12-04Aulia SafitriKG58,500,0000Net 60UNTUK BUFFER STOK BODY
2512100072025-12-02BAHAN BAKU BODY1010.0018CLAY AB 76#2606101783902512100322025-12-032025-12-032025-12-03150,00039012025-12-10OverdueLokalIDRHARAPAN WIJAYA SUKSES, CV.S0761CLOSEDCLOSED2025-12-04Aulia SafitriKG58,500,0000Net 60UNTUK BUFFER STOK BODY
2511003582025-11-21SPAREPART5021.0124V. BELT B - 255251200072195,0002512000722025-12-042025-12-192025-12-196195,000132512003072025-12-1062025-12-26On timeLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-11-26Nanda Ayu PratiwiPCS1,170,0000Net 60GLAZING LINE PN 1
2511003582025-11-21SPAREPART5021.0124V. BELT B - 255251200072195,0002512000722025-12-042025-12-192025-12-196195,000132601013022026-02-06642025-12-26LateLokalIDRCENTURY BEARINDO PT. (PPN)S0043CLOSEDCLOSED2025-11-26Nanda Ayu PratiwiPCS1,170,0000Net 60GLAZING LINE PN 1
2511003932025-11-25PERSEDIAAN UMUM6050.0243ACCU / BATTERAY N-1202603000482,230,0002512000622025-12-042025-12-042025-12-0411,659,45992512004722025-12-15112025-12-11LateLokalIDRSHOP & DRIVES1045CLOSEDCLOSED2025-11-29Nanda Ayu PratiwiPCS1,659,4590- Cash Basic -UNTUK GENSET KILN PN 2C
2511004502025-11-29BAHAN PEMBANTU2054.0001KLEM GALVANIS2605004672502512000692025-12-042025-12-222025-12-222,00026052512004402025-12-1392025-12-29On timeLokalIDRYULI SETIAWAN SURABAYA, CVS0524CLOSEDCLOSED2025-12-06QhadafyPCS520,0000Net 30
2511004612025-11-29STATIONERY6010.0013KERTAS HVS KUNING26060025758,0002512000732025-12-042025-12-152025-12-15162,00052512002362025-12-0952025-12-22On timeLokalIDRPELANGI STATIONERY MOJOSARIS0191OPENCLOSED2025-12-06Nanda Ayu PratiwiRIM62,0000Net 1OFFICE WFG. A4
← PrevPage 53 of 672Next →Rows per page:1020501005001000