KKobin GroupProcurement KPI

PR TO PO TO GRPO (spine)

Master PR list — the spine that sets the date span & KPI 4 universe · 8,887 row(s) · click Edit on a row to fix a value — KPIs recalculate on save

PR NoPR DateDeptItem CodeItemQty ReqQty POQty GRPOOutstandingPO No(s)VendorStatus POStatus GRPOEdit
2511100972025-11-28KRW.WHS015013.0007SELANG ANGIN PU D.12MM1001001000251210025TARUMA GITA PERSADA PT.Sudah POSudah Terima
2511004152025-11-28KBN.WHS025032.141SIDE SHIFTER4440251200010TRAKTOR NUSANTARA PT.Sudah POSudah Terima
2511100972025-11-28KRW.WHS016030.1712ELBOW GALVANIS 3/4 INCH1212120251210088DUTA MAKMUR MULYA, PTSudah POSudah Terima
2511100972025-11-28KRW.WHS016030.2427WATER MUR GALVANIS 3/4 INCH4440251210089DUTA MAKMUR MULYA, PTSudah POSudah Terima
2511100972025-11-28KRW.WHS016030.2428DOUBLE NEPLE 1 INCH DRAT LUAR7770251210108RENEO GLOBAL INDONESIA, PT.Sudah POSudah Terima
2511100972025-11-28KRW.WHS016020.0659CARBON BRUSH (BOSCH) GWS 7001010100251210085DUTA TEKNIK, CV.Sudah POSudah Terima
2511100972025-11-28KRW.WHS016020.0658SAKLAR GERINDA MERK : BOSCH GWS-7005550251210085DUTA TEKNIK, CV.Sudah POSudah Terima
2511100972025-11-28KRW.WHS015019.0336ROTOR GERINDA MERK:BOSCH TYPE:GWS 7006660251210113TARUMA GITA PERSADA PT.Sudah POSudah Terima
2511100962025-11-28KRW.WHS01JASA ALAT OVERTIME 6 JAM0000251110190RAS ENGINEERING. PTBelum POBelum Terima
2511100962025-11-28KRW.WHS01JASA RENTAL ALAT BERAT CRANE 160 TON TAMBAH 1 SHIFT0000251110190RAS ENGINEERING. PTBelum POBelum Terima
← PrevPage 39 of 889Next →Rows per page:1020501005001000